TxDOT contract A00217109 bid tabulation

Landscape Development, IH 20 (Mikus Road to East of Mikus Road). Let by Texas DOT on July 2, 2026, Parker, Fort Worth District. 7 bids received; low bid $291,494 by Central North Construction, LLC, -22% against the engineer's estimate of $375,913.

Owner
Texas DOT
Letting
02 JUL 2026
Pay items
21
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Central North Construction, LLC$291,494Low-22%
2Tight Line Construction, LLC$326,471+12%-13%
3Green Sage Services LLC$336,570+15%-10%
4Apex Landscape & Irrigation, LLC$355,434+22%-5.0%
5C. Green Scaping, L.P.$379,676+30%+1.0%
6Abescape Landscaping, LLC$456,909+57%+22%
7Texas Road Construction, LLC$473,845+63%+26%
TxDOT contract A00217109: bids by rank

Engineer's estimate: $375,913.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Central North Construction, LLC2. Tight Line Construction, LLC3. Green Sage Services LLC4. Apex Landscape & Irrigation, LLC5. C. Green Scaping, L.P.6. Abescape Landscaping, LLC
1Preparing row (100-7001)ACRE1.07$23,500$35,000$10,000$10,500$6,500.00$32,018$10,000
2Compost manuf topsoil (4") (161-7002)SY3,833$5.00$3.00$5.50$4.20$4.75$19.00$2.25
3Irrigation system (170-7001)LS1$88,000$75,098$50,000$80,000$37,000$78,600$159,343
4Wildflower seeding (180-7001)ACRE0.19$24,000$2,500.00$15,000$3,500.00$10,000$4,400.00$2,000.00
5Mulch (192-7002)SY3,420$5.00$3.00$3.00$3.00$3.75$4.95$1.80
6Landscape edge (type II) (192-7018)LF1,436$12.00$10.00$15.00$9.50$8.00$9.00$40.00
7Landscape edge (concrete) (192-7021)LF1,262$24.00$34.00$28.00$29.50$29.00$27.00$30.00
8Loose aggregate GRND cover (type I) (192-7024)CY41.30$210.00$200.00$250.00$220.00$450.00$318.00$250.00
9Loose aggregate GRND cover (type II) (192-7025)CY47.20$230.00$50.00$250.00$220.00$450.00$318.00$260.00
10Plant material (1 gal) (192-7026)EACH757$12.00$5.95$10.00$11.20$12.00$6.00$10.00
11Plant material (3 gal) (192-7028)EACH1,737$30.00$17.90$30.00$20.50$30.00$10.00$18.00
12Plant material (15 gal) (192-7030)EACH33$100.00$200.00$175.00$165.00$275.00$110.00$250.00
13Landscape establish (193-7001)MO12$1,400.00$1,600.00$1,500.00$2,200.00$2,500.00$1,500.00$2,000.00
14Irrig sys oper and maintenance (schedule A) (193-7010)MO12$1,200.00$600.00$1,000.00$1,100.00$1,500.00$1,000.00$1,500.00
15Mobilization (500-7001)LS1$34,370$12,000$30,000$28,000$38,000$11,000$30,000
16Barricades, signs and traffic handling (502-7001)MO3$2,500.00$500.00$3,500.00$4,000.00$5,500.00$4,530.00$5,000.00
17Portable changeable message sign (503-7002)EACH1$6,000.00$150.00$6,000.00$4,500.00$2,000.00$6,000.00$100.00
18Biodegradable erosion control logs (install) (8") (506-7043)LF489$3.50$0.10$5.00$5.50$2.00$6.00$5.00
19Biodegradable erosion control logs (remove) (506-7046)LF489$2.00$0.10$2.00$1.00$1.00$2.00$2.00
20Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF120$34.00$25.00$30.00$38.00$60.00$44.00$65.00
21Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF120$38.00$29.00$30.00$55.00$60.00$48.00$70.00
TxDOT contract A00217109: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy