C. Green Scaping, L.P.: TxDOT bid record

C. Green Scaping, L.P. submitted 13 bids on Texas DOT contracts in the data, from 04 JUN 2020 to 02 JUL 2026, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +23% above the low bid.

Owner
Texas DOT
Low bid volume
$781,301
Latest bid
02 JUL 2026
Data through
19 NOV 2026
13Bids
2Low bids
15Win rate, percent
+23%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2020200%
2023300%
20254250%
2026400%
C. Green Scaping, L.P., TxDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Plant material (5 gal)192-7029EACH55 (100%)$13.00$40.00
Landscape establish193-7001MO83 (38%)$1,500.00$2,500.00
Barricades, signs and traffic handling502-7001MO132 (15%)$4,120.00$5,000.00
Preparing row100-7001ACRE82 (25%)$29,549$15,000
Portable changeable message sign503-7001DAY72 (29%)$115.00$100.00
Landscape edge (concrete)192-7021LF52 (40%)$29.00$31.00
Biodegradable erosion control logs (remove)506-7046LF121 (8%)$2.00$1.40
Biodegradable erosion control logs (install) (8")506-7043LF121 (8%)$6.30$6.00
Irrig sys oper and maintenance193-7007MO91 (11%)$1,100.00$1,200.00
Preparing row100-7002STA51 (20%)$3,170.00$2,750.00
Plant maintenance193-6001MO51 (20%)$2,400.00$1,800.00
Mulch192-7002SY51 (20%)$4.95$4.00
C. Green Scaping, L.P., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

C. Green Scaping, L.P., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
02 JUL 2026A00217109Fort Worth DistrictLandscape Development, IH 20 (Mikus Road to East of Mikus Road)5 of 7$379,676+30%
02 JUL 2026A00217103Fort Worth DistrictLandscape Development, FM 156 (FM 156/ S Blue Mound Road to End of Median)2 of 7$190,213+20%
01 JUL 2026A00217580Fort Worth DistrictLandscape Development, SH 199 (East SH199 at Boyd Rd (FM 730) to West SH199 at Boyd Rd (FM 730))5 of 6$351,108+23%
01 JUL 2026A00217112Fort Worth DistrictLandscape Development, US 377 (Basswood Blvd to Starnes Rd)6 of 6$820,248+111%
05 SEP 2025A00213273Fort Worth DistrictLandscape Development, US 81 (FM 407 to S of FM 407)2 of 6$306,354+33%
02 JUL 2025A00212521Fort Worth DistrictLandscape Development, FM 916 (IH 35W to South Bois D Arc Street)2 of 4$361,022+9.0%
02 JUL 2025A00212663Fort Worth DistrictLandscape Development, SH 121 (Crystal Springs to Harwood)1 of 2$286,844Low, 62% under the second
01 JUL 2025A00211766Fort Worth DistrictLandscape Development, BU 287P (City of Saginaw Limit to Palomino Drive)1 of 4$494,458Low, 5.0% under the second
01 NOV 202311233023Fort Worth DistrictIH 20 Landscape development from EXIT 411 to EXIT 4143 of 5$525,875+33%
07 SEP 202309233202Fort Worth DistrictBU 287P Landscape development from WJ BOAZ RD to BAILEY BOSWELL RD4 of 5$335,333+9.0%
06 SEP 202309233030Fort Worth DistrictSH 183 Landscape development from WEHRING to HANDLEY EDERVILLE RD2 of 4$446,224+38%
04 NOV 202011203019Fort Worth DistrictUS 377 Transportation non-roadway from NORTH TARRANT PARKWAY to WATAUGA ROAD2 of 5$554,852+23%
04 JUN 202006203038Fort Worth DistrictSH 171 Landscape development from SOUTH OF CLEBURNE AVE to W OWENS ST INTERSECTION2 of 2$352,706+10%
C. Green Scaping, L.P.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy