TxDOT letting results, September 6, 2023
37 contracts let by Texas DOT on September 6, 2023, $356,194,718 in low bids, a median of 4 bidders per contract. On the 37 with an engineer's estimate, the low bid came in under it 24 times; median low bid -3.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 37
- Low bids, total
- $356,194,718
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 09233001 | US 69 Widen road - add lanes from 0.1 MI SOUTH OF BLACK CREEK to HARDIN COUNTY LINE | Beaumont District | 4 | Pulice Construction, Inc. | $205,416,130 | $214,134,330 | +4.0% | +30% | TxDOT |
| 09233004 | US 90 Seal coat from MEEKER RD, EAST to FM 364 | Beaumont District | 1 | Clark Construction of Texas, Inc. | $13,998,169 | -15% | TxDOT | ||
| 09233013 | SH 11 Adding shoulders with no added capacity from FM 2655 to SH 24 | Paris District | 3 | D. L. Lennon Incorporated - Contractor | $11,405,903 | $12,655,434 | +11% | +5.0% | TxDOT |
| 09233038 | FM 1882 Highway improvement from BI 20 to US 385 S | Odessa District | 4 | Jones Bros. Dirt & Paving Contractors, Inc. | $10,165,599 | $11,439,968 | +13% | -13% | TxDOT |
| 09233006 | US 277 Seal coat from 12.336 MI SOUTH OF EDWARDS COUNTY L to US 377 | Laredo District | 4 | Ronald R. Wagner & Co., LP | $9,710,711 | $10,502,728 | +8.0% | -17% | TxDOT |
| 09233005 | FM 1015 Rehabilitate existing roadway from MILE 9 to IH-2 | Pharr District | 4 | Reim Construction, Inc. | $8,435,309 | $8,506,136 | +1.0% | -2.0% | TxDOT |
| 09233010 | US 84 Seal coat from FM 930 to US 281 | Waco District | 2 | Cox Paving of Texas, Inc. | $7,829,870 | $10,490,452 | +34% | -10% | TxDOT |
| 09233008 | FM 217 Seal coat from BOSQUE C/L to FM 182 | Waco District | 5 | Brannan Paving Co., LTD. | $7,582,812 | $8,357,679 | +10% | -13% | TxDOT |
| 09233012 | FM 887 Rehabilitate existing roadway from .1 MI E OF FM 2724 to SH 123 | Corpus Christi District | 4 | Brannan Paving Co., LTD. | $7,291,794 | $7,680,464 | +5.0% | -23% | TxDOT |
| 09233011 | US 59 Resurface roadway from US 59/US 259 INTERCHANGE to FM 2864 | Lufkin District | 1 | Texas Materials Group, Inc. | $6,975,521 | +3.0% | TxDOT | ||
| 09233015 | FM 917 Resurface roadway from FM 1902 to MANSON ST. | Fort Worth District | 3 | Ed Bell Construction Company | $6,838,229 | $7,533,330 | +10% | +10% | TxDOT |
| 09233007 | SH 110 Preventive maintenance from SH 64 to TROUP HWY | Tyler District | 2 | FNH Construction, LLC | $6,495,390 | $6,679,956 | +3.0% | +12% | TxDOT |
| 09233036 | US 287 Highway improvement from ARMSTRONG C/L, EAST to CLARENDON CL (SBL) | Childress District | 5 | J. Lee Milligan, Inc. | $6,446,301 | $6,799,859 | +5.0% | -3.0% | TxDOT |
| 09233016 | US 59 Seal coat from 12 MILES EAST OF SL20 to 1.982 MIES EAST OF SL20 | Laredo District | 4 | Ronald R. Wagner & Co., LP | $5,349,602 | $6,007,434 | +12% | -9.0% | TxDOT |
| 09233035 | FM 3503 Highway improvement from GRANDVIEW to JBS PKWY | Odessa District | 3 | Reece Albert, Inc. | $5,107,417 | $5,378,197 | +5.0% | +4.0% | TxDOT |
| 09233017 | VA Install traffic signal from VARIOUS LOCATIONS to IN THE DALLAS COUNTY | Dallas District | 2 | Durable Specialties, Inc. | $4,157,640 | $5,224,227 | +26% | +7.0% | TxDOT |
| 09233009 | FM 770 Surfacing/roadway restoration from FM 1003, SOUTH to LITTLE PINE ISLAND BAYOU | Beaumont District | 3 | Vulcan Materials Asphalt and Construction, LLC | $4,123,743 | $5,417,709 | +31% | -20% | TxDOT |
| 09233014 | FM 608 Rehabilitate existing roadway from FISHER COUNTY to BU 84-J | Abilene District | 2 | Bontke Brothers Construction Company | $4,084,995 | $4,630,895 | +13% | +14% | TxDOT |
| 09233037 | BI 20-E Highway improvement from FM 1882 to HANCOCK | Odessa District | 2 | FNH Construction, LLC | $2,412,948 | $2,794,492 | +16% | +29% | TxDOT |
| 09233018 | SH 6 Bridge maintenance from ON SH 6 SB to AT BS 6S NB | Bryan District | 6 | SCR Civil Construction, LLC | $2,245,312 | $2,362,875 | +5.0% | -20% | TxDOT |
| 09233022 | SH 64 Install traffic signal from INTERSECTION AT SH 64 to IH 20 | Tyler District | 4 | East Texas Bridge, Inc. | $2,231,132 | $2,264,927 | +2.0% | +35% | TxDOT |
| 09233034 | US 271 Maintenance & operations project from FM 196 NORTH to RED RIVER COUNTY LINE | Paris District | 4 | A. L. Helmcamp, Inc. | $2,221,279 | $2,779,840 | +25% | -7.0% | TxDOT |
| 09233024 | UA 90 Hazard elimination & safety from FM 723 to FM 762 | Houston District | 3 | Third Coast Services LLC | $1,998,146 | $2,128,564 | +7.0% | -15% | TxDOT |
| 09233023 | Bicycle and pedestrian improvements from ALONG US 82 FROM SH 98 to FM 1840 | Atlanta District | 3 | Garret Shields Infrastructure | $1,958,509 | $2,364,242 | +21% | -1.0% | TxDOT |
| 09233039 | IH 10 Install median barrier from REFERENCE MARKER 285 to REFERENCE MARKER 293 | Odessa District | 4 | HJC Farms, Inc. | $1,938,518 | $2,004,132 | +3.0% | -7.0% | TxDOT |
| 09233021 | SH 206 Preventive maintenance from SH 279 to BROWN COUNTY LINE | Abilene District | 4 | J. H. Strain & Sons, Inc. | $1,595,478 | $1,697,763 | +6.0% | -15% | TxDOT |
| 09233020 | VA Hazard elimination & safety from DISTRICTWIDE | Yoakum District | 6 | Highway Barricades and Services, LLC | $1,439,927 | $1,688,063 | +17% | -37% | TxDOT |
| 09233025 | CR Construct pedestrian infrastructure from DRIPPING SPRINGS MIDDLE SCHOOL to ROGER HANKS PARKWAY/BROKEN LANCE RO | Austin District | 9 | D&S Concrete Contractors LLC | $1,277,863 | $1,502,697 | +18% | -2.0% | TxDOT |
| 09233027 | FM 570 Widen road - add lanes and shoulders from 0.25 MI N OF FM 2214 to 0.162 MI S OF FM 570 | Brownwood District | 2 | Jay Mills Contracting, Incorporated | $1,257,684 | $1,621,702 | +29% | +5.0% | TxDOT |
| 09233019 | IH 10 Bridge replacement from 0.067 MI S OF SH 20 to 0.71 MI E OF US 85 | El Paso District | 3 | Dan Williams Company | $960,423 | $1,089,227 | +13% | -12% | TxDOT |
| 09233026 | FM 666 Hazard elimination & safety from 1600 FT W OF FM 81 to 1400 FT E OF FM 81 | Corpus Christi District | 6 | Maldonado-Burkett, LLP | $854,238 | $899,352 | +5.0% | -26% | TxDOT |
| 09233041 | CS Bridge replacement from BACA STREET AT HCFCD DITCH | Houston District | 4 | John Reed and Company, LLC | $745,291 | $812,316 | +9.0% | -7.0% | TxDOT |
| 09233032 | SH 243 Install traffic signal from INTERSECTION AT SH 243 to @ WALMART | Tyler District | 4 | WG Engineering & Construction, LLC | $500,566 | $564,869 | +13% | +27% | TxDOT |
| 09233028 | VA Intersection improvement from FY 2022 DISTRICTWIDE to PREVENTIVE MAINT | Waco District | 7 | Third Coast Services LLC | $436,915 | $451,440 | +3.0% | -1.0% | TxDOT |
| 09233030 | SH 183 Landscape development from WEHRING to HANDLEY EDERVILLE RD | Fort Worth District | 4 | Central North Construction, LLC | $323,183 | $446,224 | +38% | -37% | TxDOT |
| 09233031 | SH 103 Install traffic signal from 0.1 MI W OF FM 842 to 0.1 MI E OF FM 842 | Lufkin District | 2 | Third Coast Services LLC | $317,627 | $392,881 | +24% | -1.0% | TxDOT |
| 09233033 | CS Resurface roadway from WITHIN WORLD BIRDING CENTER & to RESACA DE LAS PALMAS STATE PARK | Pharr District | 2 | Lucania Construction LLC | $64,546 | $89,100 | +38% | +213% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.