Maldonado-Burkett, LLP: TxDOT bid record
Maldonado-Burkett, LLP submitted 35 bids on Texas DOT contracts in the data, from 19 FEB 2020 to 05 AUG 2026, and was the low bidder on 8 of them (23%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $6,746,778
- Latest bid
- 05 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 1 | 17% |
| 2021 | 5 | 2 | 40% |
| 2022 | 3 | 0 | 0% |
| 2023 | 8 | 3 | 38% |
| 2024 | 6 | 2 | 33% |
| 2025 | 4 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Corpus Christi District | 27 | 8 | 30% |
| Pharr District | 2 | 0 | 0% |
| Laredo District | 2 | 0 | 0% |
| Zapata | 1 | 0 | 0% |
| Atlanta District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 32 | 19 (59%) | $97.68 | $230.00 |
| Portable changeable message sign | 503-7001 | DAY | 20 | 10 (50%) | $62.55 | $100.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 33 | 8 (24%) | $3,942.00 | $5,000.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 13 | 8 (62%) | $80.56 | $110.00 |
| Install small roadside sign support and assembly TYS80(1)SA(P) | 644-7025 | EACH | 11 | 6 (55%) | $707.40 | $850.00 |
| Remove SM RD SN sup&AM (sign only) | 644-7075 | EACH | 6 | 5 (83%) | $22.22 | $96.30 |
| Backplate W/ref border(3 sec)(vent)aluminum | 682-7042 | EACH | 5 | 5 (100%) | $106.40 | $187.51 |
| Backplate W/ref border(4 sec)(vent)aluminum | 682-7043 | EACH | 5 | 5 (100%) | $147.01 | $223.96 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 23 | 4 (17%) | $6.10 | $6.00 |
| Conduit (PVC) (schedule 80) (2") (bore) | 618-7055 | LF | 18 | 4 (22%) | $28.91 | $27.00 |
| Electrical conductor (no.8) insulated | 620-7008 | LF | 16 | 3 (19%) | $1.63 | $2.00 |
| Vehicle signal section (12")LED(yel) | 682-7003 | EACH | 16 | 3 (19%) | $277.56 | $300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The Levy Company, Inc. | 22 | 4 of 22 |
| Traf-Tex, Inc. | 20 | 10 of 20 |
| Austin Traffic Signal Construction Co., Inc. | 19 | 11 of 19 |
| Third Coast Services LLC | 18 | 11 of 18 |
| E-Z Bel Construction, LLC | 14 | 3 of 14 |
| Vaca Underground Utilities Inc | 13 | 8 of 13 |
| Triple H Field Services, LLC | 5 | 3 of 5 |
| Florida Traffic Control Devices, Inc. | 5 | 1 of 5 |
| F & W Electrical Contractors, Inc. | 4 | 1 of 4 |
| D&G Energy Corporation | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 AUG 2026 | A00213379 | Laredo District | Install Illumination, SH 44 (JULIAN ST to CR 338) | 3 of 7 | $828,773 | +6.0% |
| 02 JUL 2026 | A00206775 | Corpus Christi District | Install/Replace Signs, PR 22 (SH 358 to SH 361) | 3 of 3 | $543,799 | +13% |
| 17 MAR 2026 | A00219146 | Corpus Christi District | INSTALLATION OF FLASHING BEACONS AND PED, SH0044 (Various In Nueces County to .) | 3 of 6 | $500,006 | +20% |
| 04 JUN 2025 | A00184613 | Corpus Christi District | Hazard Elimination & Safety, FM 3024 (1000 FT N OF FM 534 to 1000 S OF FM 534) | 3 of 9 | $1,120,516 | +10% |
| 02 MAY 2025 | A00193518 | Corpus Christi District | Hazard Elimination & Safety, SH 44 (SH 358 to 0.5 mi West of International Dr) | 2 of 6 | $467,552 | +11% |
| 18 MAR 2025 | A00214313 | Corpus Christi District | LARGE SIGN REPLACEMENT, US0077 (VARIOUS to .) | 2 of 2 | $283,270 | +50% |
| 05 MAR 2025 | A00176801 | Corpus Christi District | Traffic Signal Improvements, AIRLINE RD (On Airline Rd in Nueces to At McArdle Rd. Intersection N and S) | 5 of 5 | $422,253 | +26% |
| 19 NOV 2024 | A00212677 | Corpus Christi District | ILLUMINATION MAINTENANCE, SH0358 (Various Roadways in the District to .) | 1 of 2 | $730,498 | Low, 26% under the second |
| 07 NOV 2024 | A00198097 | Yoakum District | Install Traffic Signal, US 87 (Goodwin St to North St) | 3 of 4 | $1,107,565 | +20% |
| 06 JUN 2024 | 06243260 | Corpus Christi District | VA Install/replace signs from AT VARIOUS LOCATIONS to IN NUECES, SAN PATRICIO, ARANSAS CO | 1 of 7 | $1,347,670 | Low, 11% under the second |
| 05 JUN 2024 | 06243035 | Corpus Christi District | US 181 Traffic signal improvements from ON US181 FROM .5 MI W OF SH 188 to .5 MI E OF PIRATE BLVD | 2 of 4 | $2,124,180 | 0.0% |
| 03 MAY 2024 | 05243243 | Corpus Christi District | BS 44-D Hazard elimination & safety from 800 FT W OF TEXAS BLVD to 800 FT E OF TEXAS BLVD | 3 of 6 | $696,159 | +13% |
| 05 APR 2024 | 04243215 | Corpus Christi District | VA Install/replace signs from AT VARIOUS LOCATION IN CC DISTRICT | 4 of 5 | $3,293,000 | +36% |
| 06 DEC 2023 | 12233227 | Laredo District | VA Install/upgrade roadway lighting from DISTRICTWIDE | 4 of 6 | $821,718 | +24% |
| 01 NOV 2023 | 11233026 | Corpus Christi District | VA Install flashing beacon from AT VARIOUS LOCATIONS IN CORPUS DIST | 2 of 3 | $972,689 | +28% |
| 06 SEP 2023 | 09233026 | Corpus Christi District | FM 666 Hazard elimination & safety from 1600 FT W OF FM 81 to 1400 FT E OF FM 81 | 1 of 6 | $854,238 | Low, 5.0% under the second |
| 27 JUN 2023 | 06233437 | Corpus Christi District | VA Install illumination from AT VARIOUS LOCATIONS IN CORPUS DIST | 4 of 6 | $3,962,809 | +28% |
| 27 JUN 2023 | 06233446 | Corpus Christi District | SH 359 Hazard elimination & safety from 700 FT N OF FM 1091 to 700 FT S OF FM 1091 | 5 of 5 | $1,409,411 | +35% |
| 01 JUN 2023 | 06233032 | Corpus Christi District | VA Install flashing beacon from AT VARIOUS LOCATIONS IN CORPUS DIST | 1 of 5 | $916,588 | Low, 12% under the second |
| 01 JUN 2023 | 06233050 | Corpus Christi District | UA 281 Traffic signal improvements from ON UA281 .5 MI N OF FM99 to .5 MI S OF FM99 | 1 of 6 | $148,157 | Low, 3.0% under the second |
| 07 MAR 2023 | 03233024 | Corpus Christi District | IH 37 Hazard elimination & safety from SH 358 to FM 2292 | 4 of 5 | $1,731,830 | +20% |
| 03 AUG 2022 | 08223031 | Pharr District | FM 907 Traffic signal improvements from 0.1 MILES NORTH OF MILE 17 1/2 N. R to 0.1 MILES SOUTH OF MILE 17 1/2 N RD | 5 of 5 | $1,738,801 | +32% |
| 29 JUN 2022 | 06223437 | Waco District | US 84 Install illumination from FM185 to FM185 | 3 of 4 | $399,281 | +17% |
| 07 APR 2022 | 04223235 | Atlanta District | US 59 Upgrade traffic signals from AT SH 155 | 4 of 5 | $669,722 | +33% |
| 02 JUL 2021 | 07213245 | Corpus Christi District | SH 188 Install illumination from .5 MI E. OF FM 796 to .5 MI W. OF FM 796 | 3 of 8 | $143,250 | +7.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.