TxDOT contract A00184613 bid tabulation
Hazard Elimination & Safety, FM 3024 (1000 FT N OF FM 534 to 1000 S OF FM 534). Let by Texas DOT on June 4, 2025, Live Oak, Corpus Christi District. 9 bids received; low bid $1,021,498 by Austin Traffic Signal Construction Co., Inc., -19% against the engineer's estimate of $1,266,301.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 29
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Traffic Signal Construction Co., Inc. | $1,021,498 | Low | -19% |
| 2 | Third Coast Services LLC | $1,081,601 | +6.0% | -15% |
| 3 | Maldonado-Burkett, LLP | $1,120,516 | +10% | -12% |
| 4 | The Levy Company, Inc. | $1,205,126 | +18% | -5.0% |
| 5 | Traf-Tex, Inc. | $1,219,400 | +19% | -4.0% |
| 6 | Light It Up Electric | $1,267,534 | +24% | 0.0% |
| 7 | E-Z Bel Construction, LLC | $1,409,177 | +38% | +11% |
| 8 | Marcom'S Mowing Service, LLC | $1,771,781 | +73% | +40% |
| 9 | Select Maintenance, L.L.C. | $1,900,280 | +86% | +50% |
Engineer's estimate: $1,266,301.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Traffic Signal Construction Co., Inc. | 2. Third Coast Services LLC | 3. Maldonado-Burkett, LLP | 4. The Levy Company, Inc. | 5. Traf-Tex, Inc. | 6. Light It Up Electric |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 484 | $245.00 | $220.00 | $159.42 | $251.67 | $310.00 | $271.00 | $300.00 |
| 2 | Riprap (concrete)(CL B) (432-7005) | CY | 19.25 | $1,028.00 | $750.00 | $859.79 | $2,063.96 | $560.00 | $1,729.00 | $600.00 |
| 3 | Mobilization (500-7001) | LS | 1 | $93,929 | $32,500 | $108,160 | $112,042 | $120,513 | $94,882 | $100,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $9,175.00 | $4,000.00 | $3,954.11 | $2,282.18 | $5,200.00 | $4,940.00 | $8,000.00 |
| 5 | Portable changeable message sign (503-7001) | DAY | 135 | $117.00 | $176.00 | $245.30 | $10.48 | $58.00 | $158.00 | $150.00 |
| 6 | TMA (stationary) (505-7001) | DAY | 135 | $213.00 | $110.00 | $398.35 | $11.60 | $59.00 | $240.00 | $200.00 |
| 7 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 900 | $14.00 | $10.00 | $6.83 | $2.88 | $4.50 | $11.20 | $5.00 |
| 8 | Biodegradable erosion control logs (remove) (506-7046) | LF | 900 | $3.00 | $4.00 | $3.37 | $2.10 | $1.75 | $4.25 | $1.00 |
| 9 | In RD IL (type SA) 40T-10 (250W EQ) LED (610-7126) | EACH | 33 | $5,000.00 | $4,738.00 | $4,230.27 | $4,397.38 | $4,900.00 | $4,435.20 | $4,735.00 |
| 10 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 10 | $5,145.00 | $4,588.92 | $4,812.49 | $5,400.00 | $4,629.60 | $5,150.00 | |
| 11 | In RD IL (type SA) 50T-12-12(400W EQ)LED (610-7201) | EACH | 12 | $6,600.00 | $5,979.67 | $6,304.17 | $7,300.00 | $5,996.70 | $6,700.00 | |
| 12 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 8,425 | $10.00 | $6.00 | $8.09 | $11.08 | $11.00 | $15.91 | $14.00 |
| 13 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 2,030 | $32.00 | $28.00 | $14.61 | $19.74 | $16.00 | $35.75 | $30.00 |
| 14 | Electrical conductor (no.12) insulated (620-7004) | LF | 32,415 | $3.00 | $0.98 | $1.02 | $1.27 | $1.10 | $2.11 | $1.25 |
| 15 | Ground box type A (122311)W/apron (624-7002) | EACH | 24 | $1,150.00 | $964.00 | $1,420.70 | $1,083.09 | $1,100.00 | $1,055.00 | $1,300.00 |
| 16 | Elc SRV type A 240/480 060(NS)SS(E)GC(O) (628-7044) | EACH | 3 | $7,650.00 | $9,056.85 | $9,974.49 | $10,300 | $11,691 | $7,200.00 | |
| 17 | Elc SRV type A 240/480 060(SS)SS(E)GC(O) (628-7054) | EACH | 4 | $11,150 | $7,800.00 | $9,056.85 | $10,633 | $11,300 | $12,438 | $8,500.00 |
| 18 | Aluminum signs (type A) (636-7001) | SF | 48 | $44.00 | $38.00 | $26.91 | $21.08 | $24.00 | $24.30 | $40.00 |
| 19 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 3 | $1,450.00 | $1,346.49 | $894.19 | $910.00 | $391.00 | $850.00 | |
| 20 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 13 | $950.00 | $1,014.90 | $1,123.35 | $950.00 | $468.00 | $1,000.00 | |
| 21 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 53 | $1,245.00 | $900.00 | $1,050.28 | $1,048.49 | $940.00 | $498.00 | $1,000.00 |
| 22 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $680.00 | $735.73 | $765.02 | $840.00 | $307.00 | $850.00 | |
| 23 | Remove SM RD SN sup&AM (644-7073) | EACH | 11 | $132.00 | $100.00 | $151.52 | $85.58 | $110.00 | $124.00 | $150.00 |
| 24 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 2 | $60.00 | $151.54 | $28.53 | $80.00 | $124.00 | $100.00 | |
| 25 | Vehicle signal section (12")LED(yel)(lens only) (682-7012) | EACH | 8 | $125.00 | $265.00 | $285.81 | $59.54 | $120.00 | $245.00 | $325.00 |
| 26 | Vehicle signal section (12")LED(red)(lens only) (682-7014) | EACH | 12 | $125.00 | $265.00 | $285.81 | $59.54 | $120.00 | $245.00 | $325.00 |
| 27 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 10 | $7,150.00 | $6,500.00 | $4,823.78 | $6,466.81 | $5,900.00 | $6,343.00 | $5,500.00 |
| 28 | Solar powered LED roadside sign (6002-7001) | EACH | 41 | $3,000.00 | $2,748.03 | $2,938.05 | $3,700.00 | $2,044.80 | $3,540.00 | |
| 29 | Preformed in-lane (trans) rumble strip (6024-7001) | LF | 800 | $17.00 | $25.00 | $28.61 | $21.68 | $16.00 | $17.80 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.