Light It Up Electric: TxDOT bid record
Light It Up Electric submitted 44 bids on Texas DOT contracts in the data, from 03 DEC 2020 to 03 SEP 2026, and was the low bidder on 10 of them (23%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $12,466,536
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 9 | 4 | 44% |
| 2025 | 17 | 4 | 24% |
| 2026 | 12 | 2 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 9 | 0 | 0% |
| Corpus Christi District | 5 | 0 | 0% |
| Dallas District | 5 | 3 | 60% |
| Austin District | 4 | 0 | 0% |
| Fort Worth District | 4 | 2 | 50% |
| Beaumont District | 3 | 0 | 0% |
| Atlanta District | 2 | 1 | 50% |
| San Angelo District | 1 | 1 | 100% |
| Odessa District | 1 | 1 | 100% |
| El Paso District | 1 | 0 | 0% |
| Childress District | 1 | 1 | 100% |
| Houston District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Downstream anchor terminal section | 540-7015 | EACH | 13 | 7 (54%) | $1,800.00 | $1,485.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 38 | 6 (16%) | $8,500.00 | $5,000.00 |
| Conduit (PVC) (schedule 40) (2") | 618-7030 | LF | 24 | 6 (25%) | $16.50 | $15.00 |
| Electrical conductor (no.6) insulated | 620-7010 | LF | 21 | 6 (29%) | $2.55 | $2.50 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 18 | 6 (33%) | $2.00 | $1.40 |
| Guardrail end treatment (install) | 544-7001 | EACH | 11 | 6 (55%) | $3,800.00 | $3,245.00 |
| Ground box type A (122311)W/apron | 624-7002 | EACH | 18 | 5 (28%) | $1,400.00 | $1,271.50 |
| Electrical conductor (no.6) bare | 620-7009 | LF | 17 | 5 (29%) | $2.40 | $2.10 |
| Electrical conductor (no.8) insulated | 620-7008 | LF | 16 | 5 (31%) | $2.02 | $2.00 |
| Electrical conductor (no.4) insulated | 620-7012 | LF | 16 | 5 (31%) | $3.50 | $3.00 |
| TMA (stationary) | 505-7001 | DAY | 38 | 4 (11%) | $307.50 | $230.00 |
| Drilled shaft (48 in) | 416-7008 | LF | 12 | 4 (33%) | $737.50 | $500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The Levy Company, Inc. | 20 | 16 of 20 |
| Florida Traffic Control Devices, Inc. | 16 | 8 of 16 |
| Third Coast Services LLC | 15 | 11 of 15 |
| Highway Intelligent Traffic Solutions, Inc. | 14 | 9 of 14 |
| E-Z Bel Construction, LLC | 14 | 9 of 14 |
| Sice, Inc. | 13 | 8 of 13 |
| Mica Corporation | 13 | 2 of 13 |
| Vaca Underground Utilities Inc | 10 | 8 of 10 |
| Traf-Tex, Inc. | 10 | 9 of 10 |
| Elecnor Belco Electric, Inc. | 10 | 7 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00208481 | Dallas District | Install/Rehabilitate Its, US 75 (Wilson Creek to Exchange Parkway) | 3 of 7 | $3,019,376 | +6.0% |
| 03 SEP 2026 | A00223018 | Maintenance Division District | WIM Parts, IH0035 (STATEWIDE to STATEWIDE) | 1 of 2 | $1,551,126 | Low, 10% under the second |
| 05 AUG 2026 | A00218301 | San Antonio District | Install Illumination, Various (Various Locations in San Antonio to .) | 8 of 12 | $1,060,840 | +40% |
| 01 JUL 2026 | A00206423 | Dallas District | Install/Rehabilitate Its, Various (Various Locations to In the Dallas District) | 1 of 4 | $421,431 | Low, 13% under the second |
| 01 JUL 2026 | A00206626 | Abilene District | Hazard Elimination & Safety, US 84 (SH 208 to FM 1673) | 3 of 6 | $962,802 | +18% |
| 03 JUN 2026 | A00196413 | San Antonio District | Purchase And Install Signs & Equip, Various (Districtwide Guide Signs FY 2026 to .) | 4 of 11 | $1,150,420 | +25% |
| 08 APR 2026 | A00193396 | San Antonio District | Hazard Elimination & Safety, SL 337 (W. San Antonio St to SH 46) | 8 of 10 | $1,183,606 | +45% |
| 05 FEB 2026 | A00193210 | Tyler District | Hazard Elimination & Safety, Various (Various Locations to in the City of Longview) | 8 of 8 | $433,950 | +47% |
| 05 FEB 2026 | A00206961 | San Antonio District | Install Illumination, US 281 (FM 2537 to Janet Gale) | 4 of 8 | $444,296 | +21% |
| 04 FEB 2026 | A00193290 | Atlanta District | Install Illumination, SH 8 (at SH 11 to .) | 5 of 7 | $1,909,245 | +47% |
| 04 FEB 2026 | A00127774 | Corpus Christi District | Install/Rehabilitate Its, IH 37 (AT INTERS. IH37/SH 286 to 1.7 MI S OF SH358/IH37 INTERCHANGE) | 5 of 6 | $4,920,602 | +55% |
| 07 JAN 2026 | A00189931 | Yoakum District | Install Illumination, Various (DISTRICTWIDE to .) | 9 of 10 | $4,939,658 | +19% |
| 06 NOV 2025 | A00208022 | Lubbock District | Install/Rehabilitate Its, Various (Various location in to the Lubbock District) | 4 of 4 | $1,342,471 | +33% |
| 08 OCT 2025 | A00192970 | Beaumont District | Hazard Elimination & Safety, IH 10 (0.37 MI W OF FM 563 to 0.36 MI E OF FM 563) | 8 of 10 | $1,275,151 | +20% |
| 05 SEP 2025 | A00203782 | El Paso District | Infrastructure Improvements, IH 10 (1.8 MI W OF SH 20 to 0.1 MI E OF SH 20) | 2 of 2 | $882,982 | +5.0% |
| 05 SEP 2025 | A00192906 | Pharr District | Hazard Elimination & Safety, SH 4 (0.20 Miles West of LBJ Blvd. to 0.05 Miles East of LBJ Blvd.) | 5 of 6 | $1,631,680 | +27% |
| 04 SEP 2025 | A00193463 | Houston District | Hazard Elimination & Safety, FM 2854 (Lone Star Elementary to McCaleb Road) | 5 of 8 | $809,329 | +27% |
| 08 AUG 2025 | A00192961 | Beaumont District | Hazard Elimination & Safety, SH 62 (0.513 MI N OF FM 105 to 0.12 MI N OF SH 87) | 10 of 12 | $1,903,958 | +34% |
| 08 AUG 2025 | A00210548 | Dallas District | Install/Replace Signs, FM 1830 (US 377 to FM 407) | 12 of 14 | $941,820 | +227% |
| 08 AUG 2025 | A00192267 | Fort Worth District | Install Intelligent Vehicle Highway System, US 287 (SB off ramp to Riverside Dr. to Village Creek Rd.) | 1 of 5 | $1,430,727 | Low, 7.0% under the second |
| 01 JUL 2025 | A00208026 | Atlanta District | Furnish & Install Dynamic Message Signs, Various (Various locations to Various locations) | 1 of 1 | $828,166 | Low |
| 01 JUL 2025 | A00209144 | Dallas District | Install/Rehabilitate Its, Various (Various Locations to In the Dallas District) | 1 of 5 | $497,235 | Low, 26% under the second |
| 04 JUN 2025 | A00197321 | Austin District | Install Advanced Traffic Management System, Various (Various locations on US 290 along IH 35 to to LP1) | 3 of 7 | $857,431 | +38% |
| 04 JUN 2025 | A00184613 | Corpus Christi District | Hazard Elimination & Safety, FM 3024 (1000 FT N OF FM 534 to 1000 S OF FM 534) | 6 of 9 | $1,267,534 | +24% |
| 04 JUN 2025 | A00197665 | Waco District | Install/Upgrade Roadway Lighting, IH 14 (SS172 to Jasper Drive) | 5 of 11 | $3,088,894 | +17% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.