TxDOT contract A00192970 bid tabulation

Hazard Elimination & Safety, IH 10 (0.37 MI W OF FM 563 to 0.36 MI E OF FM 563). Let by Texas DOT on October 8, 2025, Chambers, Beaumont District. 10 bids received; low bid $1,064,705 by Allstate Signal & Construction, LLC, -4.3% against the engineer's estimate of $1,112,605.

Owner
Texas DOT
Letting
08 OCT 2025
Pay items
23
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Allstate Signal & Construction, LLC$1,064,705Low-4.0%
2Deco Contractors, Inc.$1,074,363+1.0%-3.0%
3Third Coast Services LLC$1,082,631+2.0%-3.0%
4Structural Integrity Group LLC$1,091,434+3.0%-2.0%
5Creacom, Inc.$1,138,381+7.0%+2.0%
6Traf-Tex, Inc.$1,197,284+12%+8.0%
7Florida Traffic Control Devices, Inc.$1,231,450+16%+11%
8Light It Up Electric$1,275,151+20%+15%
9Sice, Inc.$1,282,743+20%+15%
10Select Maintenance, L.L.C.$1,429,595+34%+28%
TxDOT contract A00192970: bids by rank

Engineer's estimate: $1,112,605.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Allstate Signal & Construction, LLC2. Deco Contractors, Inc.3. Third Coast Services LLC4. Structural Integrity Group LLC5. Creacom, Inc.6. Traf-Tex, Inc.
1Backfill (type B) (134-7002)STA10.65$200.00$355.00$350.00$211.83$63.40$402.12$173.00
2Drilled shaft (high mast pole) (60 in) (416-7037)LF270$850.00$748.89$695.00$640.26$761.01$633.36$981.35
3Riprap (concrete)(4 in) (432-7001)CY16$600.00$450.60$800.00$1,481.76$645.05$1,429.95$1,985.00
4Riprap (mow strip)(4 in) (432-7013)CY59$640.00$501.83$975.00$732.00$585.30$1,206.15$615.00
5Mobilization (500-7001)LS1$110,230$86,500$100,000$108,263$96,259$79,687$96,478
6Barricades, signs and traffic handling (502-7001)MO3$4,000.00$6,657.00$2,250.00$18,879$11,359$3,163.16$1,242.00
7TMA (stationary) (505-7001)DAY36$200.00$200.00$250.00$413.63$200.00$455.80$410.00
8Temporary sediment control fence (install) (506-7039)LF150$4.00$5.00$11.00$6.71$1.00$4.90$6.60
9Temporary sediment control fence (remove) (506-7041)LF150$4.00$2.00$1.00$7.52$0.10$2.01$1.00
10Biodegradable erosion control logs (install) (12") (506-7044)LF58$7.00$5.75$7.00$27.57$1.00$17.06$12.30
11Biodegradable erosion control logs (remove) (506-7046)LF58$3.00$2.00$1.00$19.45$0.10$17.35$5.05
12Metal W-beam guard fence (timber post) (540-7001)LF825$28.00$23.10$28.00$28.15$21.00$36.80$25.55
13Downstream anchor terminal section (540-7015)EACH4$1,700.00$1,738.00$1,900.00$1,447.11$1,580.00$1,524.23$2,375.00
14Guardrail end treatment (install) (544-7001)EACH4$3,320.00$3,190.00$3,500.00$3,265.84$2,900.00$4,357.83$3,800.00
15HI MST IL pole (150 FT)(100 MPH) (613-7006)EACH6$57,000$59,716$58,250$53,185$59,298$64,186$58,188
16LED HI MST IL asm (6 fixt) (type A) (614-7002)EACH6$37,000$35,520$37,750$36,754$35,747$41,459$40,475
17Conduit (PVC) (schedule 80) (2") (618-7054)LF2,667$15.00$12.90$8.95$7.32$15.74$7.79$13.70
18Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF315$15.20$15.90$12.00$9.96$27.95$16.84$28.00
19Electrical conductor (no.6) bare (620-7009)LF2,982$1.80$2.36$1.85$1.51$1.76$1.37$2.50
20Electrical conductor (no.6) insulated (620-7010)LF5,964$2.00$2.66$2.15$1.73$2.23$1.72$2.65
21Ground box type A (122311)W/apron (624-7002)EACH13$1,600.00$1,145.00$952.00$728.04$1,272.61$929.73$1,159.00
22Elc SRV type A 240/480 100(SS)SS(E)SP(O) (628-7091)EACH2$6,000.00$9,380.00$7,500.00$13,428$5,369.35$9,824.22$11,640
23Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH12$28.00$49.50$48.45$37.16$45.00$42.97$50.00
TxDOT contract A00192970: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy