TxDOT contract A00192906 bid tabulation
Hazard Elimination & Safety, SH 4 (0.20 Miles West of LBJ Blvd. to 0.05 Miles East of LBJ Blvd.). Let by Texas DOT on September 5, 2025, Cameron, Pharr District. 6 bids received; low bid $1,285,170 by Austin Traffic Signal Construction Co., Inc., -15% against the engineer's estimate of $1,513,548.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 21
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Traffic Signal Construction Co., Inc. | $1,285,170 | Low | -15% |
| 2 | Traf-Tex, Inc. | $1,289,392 | 0.0% | -15% |
| 3 | Structural Integrity Group LLC | $1,488,035 | +16% | -2.0% |
| 4 | The Levy Company, Inc. | $1,498,723 | +17% | -1.0% |
| 5 | Light It Up Electric | $1,631,680 | +27% | +8.0% |
| 6 | Sice, Inc. | $1,901,429 | +48% | +26% |
Engineer's estimate: $1,513,548.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Traffic Signal Construction Co., Inc. | 2. Traf-Tex, Inc. | 3. Structural Integrity Group LLC | 4. The Levy Company, Inc. | 5. Light It Up Electric | 6. Sice, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 40 | $860.00 | $1,100.00 | $741.21 | $1,100.00 | $800.00 | $1,241.37 | |
| 2 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 685 | $320.00 | $255.00 | $229.00 | $255.78 | $300.00 | $225.00 | $437.14 |
| 3 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 33.10 | $400.00 | $750.00 | $1,255.00 | $826.86 | $1,700.00 | $1,200.00 | $746.27 |
| 4 | Mobilization (500-7001) | LS | 1 | $147,005 | $74,100 | $86,457 | $101,903 | $149,872 | $150,000 | $153,122 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $4,800.00 | $3,800.00 | $2,610.00 | $5,152.41 | $5,200.00 | $6,000.00 | $4,180.65 |
| 6 | Portable changeable message sign (503-7002) | EACH | 2 | $350.00 | $3,145.00 | $6,000.00 | $5,200.00 | $10,000 | $13,176 | |
| 7 | TMA (stationary) (505-7001) | DAY | 221 | $150.00 | $300.00 | $190.00 | $200.00 | $60.00 | $275.00 | $513.90 |
| 8 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,280 | $5.20 | $12.00 | $5.60 | $1.00 | $5.00 | $5.00 | $3.79 |
| 9 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,280 | $1.30 | $1.40 | $2.20 | $0.01 | $1.50 | $1.50 | $0.98 |
| 10 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 32 | $4,900.00 | $4,500.00 | $4,132.50 | $5,064.47 | $4,200.00 | $5,785.00 | $4,862.47 |
| 11 | In RD IL (type SA) 40T-12 (250W EQ) LED (610-7128) | EACH | 3 | $4,600.00 | $4,284.50 | $5,092.64 | $4,300.00 | $6,050.00 | $4,915.46 | |
| 12 | In RD IL (type SA) 50T-12 (400W EQ) LED (610-7200) | EACH | 27 | $5,100.00 | $4,408.00 | $5,374.88 | $4,900.00 | $6,550.00 | $5,220.11 | |
| 13 | In RD IL (type AL) 50T-8 (400W EQ) LED (610-7212) | EACH | 9 | $4,800.00 | $4,085.00 | $5,320.93 | $4,900.00 | $6,450.00 | $5,184.35 | |
| 14 | HI MST IL pole (150 FT)(100 MPH) (613-7006) | EACH | 1 | $65,500 | $57,478 | $68,656 | $71,300 | $64,550 | $77,262 | |
| 15 | LED HI MST IL asm (6 fixt) (type A) (614-7002) | EACH | 1 | $45,400 | $38,727 | $55,096 | $56,700 | $39,400 | $45,243 | |
| 16 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 14,154 | $11.00 | $8.00 | $9.30 | $13.78 | $9.25 | $14.00 | $23.09 |
| 17 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,387 | $33.00 | $31.80 | $16.98 | $36.00 | $32.00 | $35.28 | |
| 18 | Electrical conductor (no.6) bare (620-7009) | LF | 16,643 | $2.28 | $1.35 | $2.30 | $1.74 | $2.00 | $2.00 | $1.42 |
| 19 | Electrical conductor (no.6) insulated (620-7010) | LF | 33,286 | $2.40 | $1.65 | $2.65 | $2.13 | $2.30 | $2.25 | $1.90 |
| 20 | Ground box type A (122311)W/apron (624-7002) | EACH | 56 | $1,500.00 | $850.00 | $1,115.00 | $1,525.90 | $1,200.00 | $1,400.00 | $1,902.13 |
| 21 | Elc SRV type A 240/480 100(SS)SS(T)TP(O) (628-7094) | EACH | 13 | $6,000.00 | $7,725.00 | $7,800.00 | $10,428 | $10,200 | $9,000.00 | $9,525.74 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.