TxDOT contract A00209144 bid tabulation

Install/Rehabilitate Its, Various (Various Locations to In the Dallas District). Let by Texas DOT on July 1, 2025, Dallas, Dallas District. 5 bids received; low bid $497,235 by Light It Up Electric, -36% against the engineer's estimate of $782,870.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
21
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Light It Up Electric$497,235Low-36%
2Sice, Inc.$628,708+26%-20%
3Highway Intelligent Traffic Solutions, Inc.$719,960+45%-8.0%
4Lumin8 Transportation Technologies, LLC$783,590+58%0.0%
5Mica Corporation$920,678+85%+18%
TxDOT contract A00209144: bids by rank

Engineer's estimate: $782,870.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Light It Up Electric2. Sice, Inc.3. Highway Intelligent Traffic Solutions, Inc.4. Lumin8 Transportation Technologies, LLC5. Mica Corporation
1Mobilization (500-7001)LS1$120,000$50,000$62,189$68,551$71,500$87,200
2Barricades, signs and traffic handling (502-7001)MO3$35,000$12,000$20,368$41,641$37,500$29,350
3TMA (stationary) (505-7001)DAY60$275.00$400.00$664.28$559.89$615.00$550.00
4Biodegradable erosion control logs (install) (12") (506-7044)LF40$12.00$5.00$3.75$15.12$40.00$29.00
5Biodegradable erosion control logs (remove) (506-7046)LF40$8.00$1.00$0.90$11.29$9.00$23.00
6Conduit (PVC) (schedule 40) (3") (618-7036)LF70$30.00$20.00$54.73$95.72$41.50$70.00
7Conduit (prepare) (618-7090)LF925$17.00$3.00$2.02$2.62$6.90$8.65
8Electrical conductor (no.6) bare (620-7009)LF1,225$3.70$1.60$4.10$6.73$7.40$3.55
9Electrical conductor (no.6) insulated (620-7010)LF3,780$3.70$1.75$4.42$6.44$7.90$3.75
10Install DMS (pole MTD cabinet) (6004-7001)EACH2$19,000$22,000$15,376$21,111$24,845$36,365
11Install DMS (foundation MTD cabinet) (6004-7002)EACH3$25,000$22,000$25,193$25,720$26,450$46,050
12ITS com CBL (ethernet) (6005-7001)LF325$8.00$5.00$3.31$21.70$3.36$16.90
13Ground box (prepare) (6013-7006)EACH7$1,230.00$400.00$898.78$644.63$1,635.00$900.00
14Remove ITS radio (6014-7007)EACH3$3,000.00$1,000.00$1,423.72$1,096.83$2,742.00$2,350.00
15Fiber optic patch panel (6 position) (6027-7012)EACH12$1,745.00$1,200.00$3,130.07$3,444.40$2,758.00$1,465.00
16Fiber optic CBL (multi-mode)(6 fiber) (6027-7025)LF630$15.00$4.00$21.84$22.95$53.50$41.00
17Ethernet switch (install only) (6036-7001)EACH2$1,500.00$800.00$270.25$2,063.73$770.00$2,630.00
18Coaxial cable (6043-7002)LF60$2.70$5.00$5.14$24.85$3.37$24.00
19Remove and replace DMS (6054-7001)EACH7$25,000$23,000$24,193$26,649$26,137$32,935
20Remove and relocate DMS (6054-7002)EACH5$30,000$13,000$15,680$10,941$15,866$31,325
21Gigabit ethernet/fiber media conv (SM) (6077-7002)EACH4$3,116.00$3,000.00$5,018.22$3,308.41$7,970.00$2,980.00
TxDOT contract A00209144: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy