TxDOT letting results, June 4, 2025
45 contracts let by Texas DOT on June 4, 2025, $374,272,412 in low bids, a median of 5 bidders per contract. On the 45 with an engineer's estimate, the low bid came in under it 39 times; median low bid -16% against the estimate.
- Owner
- Texas DOT
- Contracts
- 45
- Low bids, total
- $374,272,412
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00132273 | Widen Road - Add Lanes And Shoulders, FM 2185 (750 feet south of Looney Spur Road to Junction with FM 3541) | El Paso District | 4 | A. L. Helmcamp, Inc. | $123,682,484 | $135,926,769 | +10% | +17% | TxDOT |
| A00060771 | Highway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE) | Austin District | 9 | Jordan Foster Construction, LLC | $58,558,559 | $59,399,863 | +1.0% | -13% | TxDOT |
| A00124412 | Rehabilitate Existing Roadway, US 60 (DIVIDED 4 LANE to US 385) | Amarillo District | 2 of 3 | J. Lee Milligan, Inc. | $44,993,689 | $58,615,088 | +30% | -17% | TxDOT |
| A00187423 | Rehabilitate Existing Roadway, SH 78 (150' South of FM 273 to Oklahoma State Line) | Paris District | 8 | D. L. Lennon Incorporated - Contractor | $15,468,983 | $16,831,519 | +9.0% | -18% | TxDOT |
| A00059543 | Highway Improvement, SL 287 (BU 59-G to COPELAND STREET) | Lufkin District | 4 | Longview Bridge and Road, LTD. | $11,124,512 | $11,886,780 | +7.0% | -16% | TxDOT |
| A00130760 | Surfacing/Roadway Restoration, SH 275 (IH 45 to 14th Street) | Houston District | 5 | Posillico Civil, Inc. | $9,764,259 | $10,770,222 | +10% | -23% | TxDOT |
| A00190666 | Total Maintenance, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area) | Houston District | 3 | Hazmat International, Inc. | $7,981,349 | $9,290,685 | +16% | -5.0% | TxDOT |
| A00190263 | Highway Improvement, FM 812 (0.19 MI NW Old San Antonio/Watts Lane to 0.19 MI SE of Artesian Drive) | Austin District | 7 | Dan Williams Company | $7,601,604 | $7,755,026 | +2.0% | -4.0% | TxDOT |
| A00194689 | Widen Road - Add Shoulders, FM 373 (Dry Elm Creek to CR 485) | Wichita Falls District | 6 | Jagoe-Public Company | $7,282,548 | $7,436,891 | +2.0% | -3.0% | TxDOT |
| A00184365 | Hazard Elimination & Safety, SH 158 (ASTER AVE to MIDLAND COUNTY LINE) | Odessa District | 3 | Jones Bros. Dirt & Paving Contractors, Inc. | $5,970,353 | $7,330,797 | +23% | -44% | TxDOT |
| A00138761 | Hazard Elimination & Safety, SH 16 (Tilley St. to Draper St.) | Pharr District | 4 | Anderson Columbia Co., Inc. | $5,520,580 | $5,742,692 | +4.0% | +45% | TxDOT |
| A00214381 | CONCRETE SPALL REPAIR, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area) | Houston District | 4 | Isi Contracting, Inc. | $5,144,698 | $6,228,714 | +21% | +36% | TxDOT |
| A00136607 | Bridge Replacement, CR 216 (STR. (AA0156001) Salt Creek to Approx. .70 MI E of SH 72) | Corpus Christi District | 7 | Relmco, Inc. | $4,876,307 | $5,221,047 | +7.0% | -32% | TxDOT |
| A00201726 | Reconstruct Existing Roadway, 704540 (Clear Creek Rd to West Range Rd) | Waco District | 4 | TTG Utilities, LP | $4,647,464 | $5,425,874 | +17% | -16% | TxDOT |
| A00184729 | Traffic Signal Improvements, US 75 (At Renner Rd to in Richardson) | Dallas District | 3 | WG Engineering & Construction, LLC | $4,580,162 | $5,081,328 | +11% | -1.0% | TxDOT |
| A00215301 | DEBRIS REMOVAL, IH0010 (Districtwide to Districtwide) | Maintenance Division District | 4 | Global Emergency Services, LLC. | $4,444,220 | $4,982,336 | +12% | -22% | TxDOT |
| A00184778 | Traffic Signal Improvements, SL 12 (At Peavy to In the City of Dallas) | Dallas District | 6 | WG Engineering & Construction, LLC | $4,223,543 | $4,445,283 | +5.0% | -1.0% | TxDOT |
| A00180852 | Bridge Replacement, COUNTY ROAD 203 (0.1 Mi S of Leon River to 0.1 Mi N of Leon River) | Waco District | 11 | Coppell Construction Co., Inc. | $4,196,407 | $4,206,593 | 0.0% | +2.0% | TxDOT |
| A00207367 | REHABILITATION OF EXISTING ROADWAY, MR0682 (US 80 to 2ND STREET) | Dallas District | 3 | Granite Construction Company | $4,164,553 | $4,424,423 | +6.0% | -5.0% | TxDOT |
| A00196407 | Preventive Maintenance, Various (Various Locations Districtwide to .) | San Antonio District | 7 | Interstate Barricades & Markings, Inc. | $3,977,770 | $4,085,283 | +3.0% | -34% | TxDOT |
| A00213018 | MILL AND INLAY, IH0045 (SH 21 to OSR) | Bryan District | 5 | Big Creek Construction, LTD. | $3,461,710 | $3,533,505 | +2.0% | -15% | TxDOT |
| A00209350 | Surfacing/Roadway Restoration, IH 10 (SL 8 East to Monmouth Road) | Houston District | 5 | Texas Materials Group, Inc. | $3,413,667 | $3,734,804 | +9.0% | -19% | TxDOT |
| A00194712 | SWEEPING AND DEBRIS REMOVAL, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area) | Houston District | 2 | Sweeping Corporation of America, LLC | $2,832,039 | $3,592,225 | +27% | -27% | TxDOT |
| A00197665 | Install/Upgrade Roadway Lighting, IH 14 (SS172 to Jasper Drive) | Waco District | 11 | E-Z Bel Construction, LLC | $2,645,698 | $2,939,939 | +11% | -18% | TxDOT |
| A00213849 | REHABILITATION OF EXISTING ROADWAY, US 96 (US 96 RM 410+1.642, SOUTH to US 96 RM 412+0.990) | Beaumont District | 2 | Cornerstone Paving and Construction, L.L.C. | $2,469,559 | $2,838,930 | +15% | -13% | TxDOT |
| A00065080 | Bridge Replacement, FM 4 (AT WEAVER BRANCH to .) | Fort Worth District | 7 | STX Civil | $2,382,295 | $2,879,977 | +21% | -11% | TxDOT |
| A00210017 | Preventive Maintenance, SH 347 (HOGABOOM ROAD, EAST to SH 73 FR) | Beaumont District | 5 | Isi Contracting, Inc. | $2,363,295 | $2,516,553 | +6.0% | -5.0% | TxDOT |
| A00189031 | ASPHALT PAVEMENT REPAIR, IH0045 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area) | Houston District | 4 | Elite Kings Construction, LLC | $1,718,248 | $2,077,813 | +21% | -13% | TxDOT |
| A00209324 | Intersection Improvement, FM 1138 (FM 1138 at CR 541 to .) | Dallas District | 7 | Jagoe-Public Company | $1,429,322 | $1,471,330 | +3.0% | -43% | TxDOT |
| A00184204 | Bridge Replacement, CARGILL RD E (At Eight Mile Creek to .) | Atlanta District | 6 | True Roads Construction, LLC | $1,320,898 | $1,532,225 | +16% | -27% | TxDOT |
| A00197972 | Construct Pedestrian Infrastructure, Various (Districtwide to .) | Odessa District | 6 | Pathfield Investments LLC | $1,271,684 | $1,288,450 | +1.0% | -16% | TxDOT |
| A00206865 | Construct Pedestrian Infrastructure, FM 2790 (In Lytle, on FM2790 from SH132(Main St) to 0.5 Mi. East 0f IH 35) | San Antonio District | 7 | Acee Construction LLC. | $1,236,296 | $1,724,746 | +40% | -35% | TxDOT |
| A00213948 | CRACK SEAL, SH0036 (VARIOUS ROADWAYS to ACROSS WACO DISTRICT) | Waco District | 3 | Rhino Equity, LLC | $1,218,599 | $1,422,222 | +17% | +1.0% | TxDOT |
| A00130805 | Bridge Replacement, GEBHARD RD (AT HAW CREEK to STR#AA04-89-001) | Yoakum District | 10 | Acme Bridge Company, Inc. | $1,169,874 | $1,210,697 | +3.0% | -13% | TxDOT |
| A00203943 | Landscape Development, Various (EL PASO COUNTYWIDE to .) | El Paso District | 1 | Horizone Construction I, LTD | $1,100,233 | +68% | TxDOT | ||
| A00184613 | Hazard Elimination & Safety, FM 3024 (1000 FT N OF FM 534 to 1000 S OF FM 534) | Corpus Christi District | 9 | Austin Traffic Signal Construction Co., Inc. | $1,021,498 | $1,081,601 | +6.0% | -19% | TxDOT |
| A00187950 | Bridge Replacement, COUNTY ROAD 241 (CR 241 @ Borrego Creek to .) | San Antonio District | 10 | Dean Word Company, LTD. | $723,241 | $724,882 | 0.0% | -13% | TxDOT |
| A00190494 | Bicycle And Pedestrian Improvements, FM 908 (US 79 to Milam Ave.) | Bryan District | 7 | Garret Shields Infrastructure | $714,789 | $730,136 | +2.0% | -24% | TxDOT |
| A00214073 | MOWING HIGHWAY RIGHT OF WAY, IH0820 (Various Locations In to North Tarrant County) | Fort Worth District | 3 | T&L Cleaning Services LLC | $681,913 | $958,566 | +41% | -34% | TxDOT |
| A00212523 | METAL BEAM GUARD FENCE REPAIR, US0096 (US 96 to VARIOUS LOCATIONS) | Beaumont District | 4 | Ross Sa Enterprise LLC | $671,470 | $780,811 | +16% | -53% | TxDOT |
| A00187770 | Resurface Roadway, IH 20 (West of FM 148 to West of SS 557) | Dallas District | 4 | Foutsco Paving Company, LLC | $645,552 | $811,017 | +26% | -30% | TxDOT |
| A00213969 | METAL BEAM GUARD FENCE REPAIR, IH0010 (Various Locations in to Jefferson, Hardin and Tyler Counties) | Beaumont District | 4 | Ross Sa Enterprise LLC | $622,654 | $859,628 | +38% | -42% | TxDOT |
| A00197321 | Install Advanced Traffic Management System, Various (Various locations on US 290 along IH 35 to to LP1) | Austin District | 7 | Elecnor Belco Electric, Inc. | $619,888 | $843,828 | +36% | -38% | TxDOT |
| A00214775 | DENSE GRADED HOT MIX, US0081 (VARIOUS LOCATIONS WITHIN to S. Tarrant) | Fort Worth District | 4 | Austin Asphalt, Inc. | $194,000 | $243,500 | +26% | -16% | TxDOT |
| A00206546 | Install/Replace Signs, Various (Various roads to in City of Jacksonville) | Tyler District | 5 | Rhino Equity, LLC | $139,946 | $145,910 | +4.0% | -24% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.