Preventive Maintenance, SH 347 (HOGABOOM ROAD, EAST to SH 73 FR). Let by Texas DOT on June 4, 2025, Jefferson, Beaumont District. 5 bids received; low bid $2,363,295 by Isi Contracting, Inc., -5.1% against the engineer's estimate of $2,491,550.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Isi Contracting, Inc. | $2,363,295 | Low | -5.0% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $2,516,553 | +6.0% | +1.0% |
| 3 | Texas Materials Group, Inc. | $2,597,966 | +10% | +4.0% |
| 4 | O. Trevino Construction, LLC | $2,687,155 | +14% | +8.0% |
| 5 | Select Maintenance, L.L.C. | $2,796,968 | +18% | +12% |
Engineer's estimate: $2,491,550.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Isi Contracting, Inc. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Texas Materials Group, Inc. | 4. O. Trevino Construction, LLC | 5. Select Maintenance, L.L.C. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb) (104-7016) | LF | 600 | $30.00 | $3.10 | $50.00 | $38.68 | $66.00 | $8.00 |
| 2 | Asphalt (AC-20-5TR) (316-7007) | GAL | 13,757 | $4.63 | $6.50 | $5.10 | $3.70 | $3.90 | $3.70 |
| 3 | Aggregate (type-PB or PL, GR-4)(sac-A) (316-7241) | CY | 353 | $228.00 | $293.00 | $184.00 | $240.00 | $248.00 | $240.00 |
| 4 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 3,966 | $210.00 | $203.00 | $221.00 | $250.00 | $258.00 | $300.00 |
| 5 | Tack coat (346-7028) | GAL | 2,752 | $5.00 | $7.20 | $3.50 | $4.00 | $4.20 | $4.00 |
| 6 | Plan & text concrete pavement(0" to 0.5") (354-7023) | SY | 5,751 | $6.00 | $5.30 | $4.50 | $6.75 | $7.00 | $5.20 |
| 7 | Plan & text concrete pavement(0" to 1.5") (354-7026) | SY | 1,962 | $3.20 | $12.00 | $12.00 | $14.00 | $14.50 | $13.20 |
| 8 | Full - depth repair CRCP (7") (361-7002) | CY | 186.25 | $600.00 | $325.00 | $1,800.00 | $1,902.24 | $1,650.00 | $1,240.00 |
| 9 | Full - depth repair CRCP (10") (361-7005) | CY | 324 | $1,080.00 | $725.00 | $1,700.00 | $1,741.45 | $1,700.00 | $1,240.00 |
| 10 | Cleaning and sealing existing joints (438-7001) | LF | 30,030 | $15.00 | $9.00 | $2.40 | $2.57 | $2.50 | $6.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $256,456 | $190,000 | $200,000 | $123,635 | $200,000 | $200,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $5,000.00 | $5,000.00 | $5,000.00 | $753.06 | $4,000.00 | $25,000 |
| 13 | Portable changeable message sign (503-7002) | EACH | 2 | $4,500.00 | $183.08 | $10,000 | $5,800.00 | $5,000.00 | $23,000 |
| 14 | TMA (stationary) (505-7001) | DAY | 60 | $120.00 | $5,500.00 | $150.00 | $321.36 | $200.00 | $200.00 |
| 15 | TMA (mobile operation) (505-7003) | DAY | 13 | $110.00 | $570.74 | $150.00 | $762.52 | $100.00 | $300.00 |
| 16 | Temporary SDMT cont fence (inlet protection) (506-7040) | LF | 1,000 | $10.00 | $5.11 | $4.00 | $10.71 | $6.00 | $8.00 |
| 17 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $5.00 | $0.91 | $1.00 | $2.14 | $6.00 | $1.00 |
| 18 | Concrete curb (type I) (529-7001) | LF | 350 | $63.00 | $10.75 | $100.00 | $103.40 | $110.00 | $40.00 |
| 19 | Concrete curb (type II) (529-7002) | LF | 250 | $65.00 | $10.75 | $100.00 | $103.40 | $110.00 | $40.00 |
| 20 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 16 | $773.00 | $800.52 | $750.00 | $642.72 | $780.00 | $600.00 |
| 21 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $879.00 | $893.10 | $850.00 | $776.62 | $870.00 | $800.00 |
| 22 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $943.00 | $1,165.38 | $1,200.00 | $1,151.54 | $1,135.00 | $1,500.00 |
| 23 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 1 | $908.00 | $1,355.98 | $1,500.00 | $1,339.00 | $1,321.00 | $1,500.00 |
| 24 | Remove SM RD SN sup&AM (644-7073) | EACH | 22 | $235.00 | $136.14 | $150.00 | $101.76 | $132.00 | $85.00 |
| 25 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 4,060 | $0.82 | $1.44 | $0.50 | $0.55 | $0.50 | $1.00 |
| 26 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 14 | $152.00 | $212.31 | $120.00 | $128.54 | $127.00 | $300.00 |
| 27 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 8 | $194.00 | $217.76 | $150.00 | $160.68 | $159.00 | $300.00 |
| 28 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 1,500 | $0.71 | $2.12 | $0.50 | $0.54 | $0.50 | $1.00 |
| 29 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 7,140 | $1.50 | $0.98 | $0.50 | $0.54 | $0.50 | $1.00 |
| 30 | Work zone pavement marking removing (W)36"(yld tri) (662-7094) | EACH | 6 | $88.00 | $217.76 | $35.00 | $37.49 | $37.00 | $75.00 |
| 31 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,480 | $2.30 | $2.72 | $1.00 | $1.00 | $12.00 | $1.50 |
| 32 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 860 | $1.80 | $2.72 | $1.25 | $1.68 | $1.50 | $1.50 |
| 33 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 1,375 | $12.00 | $3.27 | $1.50 | $1.61 | $1.50 | $1.00 |
| 34 | Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089) | EACH | 6 | $42.00 | $114.32 | $55.00 | $58.92 | $58.00 | $300.00 |
| 35 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 4,050 | $1.65 | $1.36 | $0.95 | $1.02 | $1.00 | $1.00 |
| 36 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 1,520 | $1.25 | $1.52 | $1.00 | $1.07 | $1.00 | $1.00 |
| 37 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 8,050 | $0.68 | $1.36 | $0.95 | $1.02 | $1.00 | $1.00 |
| 38 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 562 | $16.50 | $21.23 | $22.00 | $23.57 | $23.00 | $20.00 |
| 39 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 14 | $275.00 | $299.42 | $275.00 | $294.58 | $290.00 | $300.00 |
| 40 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 8 | $300.00 | $353.85 | $350.00 | $374.92 | $370.00 | $300.00 |
| 41 | Reflectorized pavement marker type I-C (672-7002) | EACH | 230 | $7.00 | $8.17 | $7.00 | $7.50 | $7.00 | $6.00 |
| 42 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 200 | $6.50 | $8.17 | $7.00 | $7.50 | $7.00 | $6.00 |
| 43 | Spalling repair (hydraulic cement) (720-7001) | CF | 100 | $315.00 | $165.00 | $350.00 | $342.58 | $210.00 | $500.00 |
| 44 | Spalling repair (polymeric) (flexible) (720-7002) | GAL | 150 | $315.00 | $285.00 | $200.00 | $166.11 | $176.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.