Cornerstone Paving and Construction, L.L.C.: TxDOT bid record

Cornerstone Paving and Construction, L.L.C. submitted 152 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 02 JUL 2026, and was the low bidder on 55 of them (36%). When it was not low, its total sat a median +11% above the low bid.

Owner
Texas DOT
Low bid volume
$86,531,277
Latest bid
02 JUL 2026
Data through
19 NOV 2026
152Bids
55Low bids
36Win rate, percent
+11%Median gap to the low bid when not low, 97 bids

By year

YearBidsLow bidsWin rate
2020400%
202121838%
202217741%
2023201050%
202416425%
2025542037%
202620630%
Cornerstone Paving and Construction, L.L.C., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Beaumont District532649%
Bryan District391538%
Houston District31826%
Yoakum District18317%
Austin District4125%
Waco District300%
Tyler District2150%
Lufkin District11100%
Brownwood District100%
Cornerstone Paving and Construction, L.L.C., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY141105 (74%)$125.00$230.00
TMA (mobile operation)505-7003DAY11076 (69%)$125.00$291.17
Reflectorized pavement marker type II-A-A672-7004EACH11160 (54%)$6.00$5.00
Work zone pavement marking SHT terminal (tab)type Y-2662-7114EACH9450 (53%)$1.00$1.41
Reflectorized pavement marker type I-C672-7002EACH6334 (54%)$6.00$5.00
Portable changeable message sign503-7001DAY5631 (55%)$75.00$100.00
Work zone pavement marking non-removing (Y)6"(solid)662-7038LF4429 (66%)$0.41$0.40
Remove SM RD SN sup&AM644-7073EACH7028 (40%)$100.00$110.00
Biodegradable erosion control logs (remove)506-7046LF4227 (64%)$2.00$1.40
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH7326 (36%)$625.00$710.00
Temporary sediment control fence (remove)506-7041LF5124 (47%)$1.15$1.00
Reflectorized pavement marking type I (W)8"(solid)(090MIL)666-7023LF3524 (69%)$1.20$1.05
Cornerstone Paving and Construction, L.L.C., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Cornerstone Paving and Construction, L.L.C., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
02 JUL 2026A00222320Bryan DistrictMILL AND INLAY, IH0045 (Various to Various)3 of 4$1,586,975+11%
02 JUL 2026A00210045Beaumont DistrictPreventive Maintenance, IH 10 (END OF CONCRETE SH 99, EAST to 0.17 MILES EAST of FM 565)2 of 3$3,335,4950.0%
01 JUL 2026A00222317Bryan DistrictMILL AND INLAY, SH0036 (Various to Various)4 of 5$1,219,563+12%
23 JUN 2026A00220510Beaumont DistrictBASE REPAIR WITH SEAL COAT AND/OR OVERLAY, IH0010 (SH 99 Grand Pkwy to FM 3180)2 of 2$595,155+4.0%
10 JUN 2026A00220509Beaumont DistrictBASE REPAIR WITH SEAL COAT AND/OR OVERLAY, FM2090 (Montgomery County Line to FM 1010)1 of 3$726,406Low, 20% under the second
03 JUN 2026A00216480Houston DistrictResurface Roadway, FM 1640 (SS 529 to W of FM 2218)2 of 5$3,397,769+11%
02 JUN 2026A00206629Bryan DistrictIntersection Improvements With Right And/Or Left Turn Lanes, SH 90 (0.16 Mi N of FM 244 to 0.31 Mi S of FM 244)4 of 7$1,335,711+8.0%
02 JUN 2026A00139363Houston DistrictSurfacing/Roadway Restoration, BU 290L (W of Fry Road to US 290 EB Frontage Road)1 of 4$733,755Low, 11% under the second
02 JUN 2026A00219996Houston DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, SH0288 (VARIOUS LOCATIONS IN BRAZORIA COUNTY to VARIOUS LOCATIONS IN BRAZORIA COUNTY)1 of 4$1,369,590Low, 14% under the second
05 MAR 2026A00193004Beaumont DistrictHazard Elimination & Safety, FM 365 (US 90 to LNVA CANAL)1 of 3$1,134,406Low, 16% under the second
05 MAR 2026A00217747Bryan DistrictMILL AND INLAY, US0079 (9th St to Anderson St.)3 of 7$2,413,153+4.0%
04 MAR 2026A00188698Houston DistrictSurfacing/Roadway Restoration, FM 517 (SH 146 to FM 646)3 of 7$3,484,454+5.0%
04 MAR 2026A00129761Waco DistrictSurfacing/Roadway Restoration, SH 171 (N Second St., Hubbard to Limestone CL)3 of 3$4,420,114+31%
05 FEB 2026A00188002Beaumont DistrictSurfacing/Roadway Restoration, SH 105 (US 59, EAST to SH 321)1 of 5$2,780,143Low, 1.0% under the second
05 FEB 2026A00192964Bryan DistrictIntersection Improvements With Right And/Or Left Turn Lanes, US 84 (0.3 Mi E of FM 489 to 0.3 Mi W of FM 489)2 of 5$1,798,042+5.0%
04 FEB 2026A00043255Beaumont DistrictState Park Improvements, ALMA DR (VILLAGE CREEK STATE PARK (PR 74) to .)2 of 2$258,152+35%
04 FEB 2026A00188781Houston DistrictSurfacing/Roadway Restoration, FM 529 (Brazos River to FM 362)2 of 7$3,720,352+14%
04 FEB 2026A00101674Yoakum DistrictState Park Improvements, EPWORTH PL (MISSION LAKE ROAD to GUADALUPE DELTA WMA)10 of 11$609,781+78%
07 JAN 2026A00210033Beaumont DistrictPreventive Maintenance, US 59 (SL 573(S) to DUDLEY STREET)1 of 4$859,788Low, 17% under the second
06 JAN 2026A00209445Houston DistrictSurfacing/Roadway Restoration, FM 1097 (SH 75 to Walker County Line)3 of 7$5,483,663+13%
02 DEC 2025A00196657Beaumont DistrictSurfacing/Roadway Restoration, FM 2799 (FM 777, EAST to US 96)2 of 2$1,612,922+17%
02 DEC 2025A00102904Houston DistrictSurfacing/Roadway Restoration, PR 138 (In Sheldon Lake State Park to .)1 of 5$1,740,088Low, 4.0% under the second
06 NOV 2025A00196627Beaumont DistrictSurfacing/Roadway Restoration, US 90 (TRINITY RIVER BRIDGE, EAST to 0.08 MILES EAST OF SH 146 N.)1 of 4$4,088,177Low, 0.0% under the second
06 NOV 2025A00192965Bryan DistrictIntersection Improvements With Right And/Or Left Turn Lanes, SH 21 (0.14 Mi E of IH 45 to 1.17 Mi E of IH 45)3 of 8$2,399,584+19%
05 NOV 2025A00187743Beaumont DistrictPreventive Maintenance, US 90 (0.37 mi E of FM 365 to 3.22 mi East (Eastbound))2 of 5$3,207,458+2.0%
Cornerstone Paving and Construction, L.L.C.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy