TxDOT contract A00101674 bid tabulation
State Park Improvements, EPWORTH PL (MISSION LAKE ROAD to GUADALUPE DELTA WMA). Let by Texas DOT on February 4, 2026, Calhoun, Yoakum District. 11 bids received; low bid $342,250 by Garret Shields Infrastructure, -22% against the engineer's estimate of $437,441.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 23
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $342,250 | Low | -22% |
| 2 | LCR Total Transport LLC | $398,935 | +17% | -9.0% |
| 3 | Matagorda Construction & Materials | $432,347 | +26% | -1.0% |
| 4 | STX Civil | $434,748 | +27% | -1.0% |
| 5 | Clark Construction of Texas, Inc. | $471,344 | +38% | +8.0% |
| 6 | Grey Sky Construction LLC | $497,868 | +45% | +14% |
| 7 | Presidio Contracting, LLC | $512,076 | +50% | +17% |
| 8 | Hunter Industries, LTD. | $526,458 | +54% | +20% |
| 9 | CK Newberry, LLC | $531,180 | +55% | +21% |
| 10 | Cornerstone Paving and Construction, L.L.C. | $609,781 | +78% | +39% |
| 11 | C. E. Barker, LTD. | $668,078 | +95% | +53% |
Engineer's estimate: $437,441.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. LCR Total Transport LLC | 3. Matagorda Construction & Materials | 4. STX Civil | 5. Clark Construction of Texas, Inc. | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (roadway) (110-7001) | CY | 35 | $25.00 | $40.00 | $20.00 | $125.00 | $33.00 | $14.56 | $50.00 |
| 2 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 275 | $30.00 | $40.00 | $25.00 | $38.00 | $40.00 | $17.22 | $50.00 |
| 3 | Blading (150-7002) | HR | 25 | $150.00 | $100.00 | $145.00 | $150.00 | $95.00 | $102.35 | $150.00 |
| 4 | Road grader work (ord comp) (152-7001) | STA | 135.07 | $170.00 | $100.00 | $38.00 | $26.00 | $125.00 | $256.47 | $450.00 |
| 5 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 18,009 | $0.20 | $0.10 | $0.45 | $0.40 | $0.43 | $0.35 | $0.35 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 4,502 | $0.15 | $0.10 | $0.45 | $0.30 | $0.43 | $0.30 | $0.35 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 4,502 | $0.15 | $0.10 | $0.45 | $0.30 | $0.43 | $0.50 | $0.35 |
| 8 | Vegetative watering (168-7001) | TGL | 151.59 | $20.00 | $50.00 | $65.00 | $35.00 | $65.00 | $28.50 | $20.00 |
| 9 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 3,644 | $85.00 | $60.00 | $83.00 | $98.00 | $80.00 | $87.97 | $80.00 |
| 10 | FL BS (roadway del) (type E GR 1-2) (in vehicle) (247-7235) | CY | 10 | $65.00 | $40.00 | $55.00 | $80.00 | $90.00 | $116.07 | $80.00 |
| 11 | Cem stabil BKFL (400-7010) | CY | 27 | $100.00 | $300.00 | $97.00 | $70.00 | $195.00 | $150.00 | $350.00 |
| 12 | Riprap (stone protection)(12 in) (432-7041) | CY | 28 | $175.00 | $200.00 | $254.00 | $340.00 | $235.00 | $225.00 | $150.00 |
| 13 | RC pipe (CL III)(18 in) (464-7003) | LF | 28 | $60.00 | $80.00 | $125.00 | $84.00 | $125.00 | $150.00 | $85.00 |
| 14 | RC pipe (CL III)(30 in) (464-7007) | LF | 40 | $80.00 | $200.00 | $200.00 | $68.00 | $205.00 | $185.00 | $125.00 |
| 15 | Removing structure (small) (496-7036) | EACH | 2 | $500.00 | $1,000.00 | $430.00 | $788.00 | $500.00 | $800.00 | $2,500.00 |
| 16 | Mobilization (500-7001) | LS | 1 | $31,000 | $40,000 | $19,950 | $4,000.00 | $33,400 | $39,700 | $40,000 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $8,000.00 | $6,000.00 | $1,000.00 | $500.00 | $3,300.00 | $2,500.00 | $8,500.00 |
| 18 | Portable changeable message sign (503-7002) | EACH | 2 | $7,000.00 | $1.00 | $1,900.00 | $2,000.00 | $7,500.00 | $7,500.00 | $10,000 |
| 19 | Rock filter dams (install) (type 1) (506-7001) | LF | 50 | $50.00 | $10.00 | $45.00 | $58.00 | $80.00 | $60.00 | $30.00 |
| 20 | Rock filter dams (remove) (506-7011) | LF | 50 | $20.00 | $1.00 | $15.00 | $17.00 | $10.00 | $15.00 | $20.00 |
| 21 | Sandbags for erosion control (506-7035) | EACH | 30 | $25.00 | $1.00 | $25.00 | $11.00 | $5.00 | $15.00 | $50.00 |
| 22 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $3.50 | $5.00 | $5.00 | $5.00 | $4.00 | $4.00 | $4.00 |
| 23 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.25 | $1.50 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.