Presidio Contracting, LLC: TxDOT bid record
Presidio Contracting, LLC submitted 26 bids on Texas DOT contracts in the data, from 03 APR 2025 to 03 NOV 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $5,235,020
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 10 | 3 | 30% |
| 2026 | 16 | 1 | 6% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Yoakum District | 9 | 1 | 11% |
| San Antonio District | 6 | 0 | 0% |
| Corpus Christi District | 5 | 1 | 20% |
| Laredo District | 2 | 1 | 50% |
| Pharr District | 1 | 0 | 0% |
| San Angelo District | 1 | 1 | 100% |
| Bryan District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 22 | 6 (27%) | $1.00 | $1.00 |
| Class C concrete (abutment) | 420-7012 | CY | 20 | 5 (25%) | $1,162.50 | $1,315.00 |
| Rail (type T223) | 450-7008 | LF | 18 | 4 (22%) | $137.50 | $160.00 |
| Blading | 150-7002 | HR | 11 | 4 (36%) | $50.00 | $148.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 16 | 3 (19%) | $100.00 | $110.00 |
| Riprap (stone protection)(18 in) | 432-7043 | CY | 15 | 3 (20%) | $191.00 | $200.00 |
| Approach slab | 422-7013 | CY | 6 | 3 (50%) | $667.50 | $750.00 |
| Vegetative watering | 168-7001 | TGL | 21 | 2 (10%) | $80.00 | $37.73 |
| Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) | 658-7013 | EACH | 17 | 2 (12%) | $25.00 | $30.00 |
| Rock filter dams (remove) | 506-7011 | LF | 14 | 2 (14%) | $13.75 | $12.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 14 | 2 (14%) | $48.25 | $35.00 |
| Embankment (final)(OC)(type C) | 132-7005 | CY | 9 | 2 (22%) | $15.00 | $37.17 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| STX Civil | 20 | 10 of 20 |
| E-Z Bel Construction, LLC | 20 | 5 of 20 |
| Acme Bridge Company, Inc. | 12 | 4 of 12 |
| CK Newberry, LLC | 12 | 1 of 12 |
| Texas Steel Industrial Placing, LLC | 10 | 6 of 10 |
| J. Carroll Weaver, Inc. | 8 | 2 of 8 |
| Dean Word Company, LTD. | 8 | 2 of 8 |
| Hodges and Son Construction Company, Inc. | 8 | 2 of 8 |
| Trevway, Inc. | 8 | 6 of 8 |
| Delgado'S Contractors, LLC | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 8 of 15 | $843,422 | +17% |
| 07 OCT 2026 | A00209154 | Laredo District | Bridge Replacement, BROWN RD (BROWN RD to .) | 1 of 6 | $485,016 | Low, 23% under the second |
| 02 SEP 2026 | A00184856 | San Antonio District | Bridge Replacement, CR 33 (On Waring-Welfare Road to at Joshua Creek) | 2 of 8 | $670,257 | +2.0% |
| 02 SEP 2026 | A00207409 | Yoakum District | Bridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001) | 8 of 12 | $3,174,902 | +19% |
| 05 AUG 2026 | A00206283 | Yoakum District | Bridge Replacement, FREYBURG ENGLE RD (@ ROCKY CREEK to STR# AA02-75-002 (FREYBURG-ENGLE RD)) | 3 of 9 | $1,731,015 | +7.0% |
| 01 JUL 2026 | A00131299 | Waco District | Bridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82)) | 7 of 8 | $2,881,522 | +38% |
| 03 JUN 2026 | A00190949 | Corpus Christi District | Bridge Replacement, LAZY F (0.1 Mi S of FM 883 to FM 883) | 3 of 10 | $969,472 | +17% |
| 03 JUN 2026 | A00190176 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 308 (AA03-08 Agua Dulce Creek to 1.10 MI S of FM 624) | 5 of 8 | $980,494 | +12% |
| 03 JUN 2026 | A00193431 | San Antonio District | Hazard Elimination & Safety, US 281 (SH 97 to FM 1334) | 8 of 10 | $1,265,505 | +22% |
| 02 JUN 2026 | A00190177 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 230 (AA02-30 Draw to 0.5 MI SE of CR 237) | 2 of 10 | $862,084 | +5.0% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 2 of 17 | $1,007,380 | +6.0% |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 4 of 13 | $1,171,268 | +3.0% |
| 07 APR 2026 | A00186521 | Laredo District | Bridge Replacement, LA PALOMA (LA PALOMA AT GALLINA SLOUGH CREEK to .) | 2 of 5 | $1,591,656 | +5.0% |
| 04 MAR 2026 | A00191889 | Pharr District | Bridge Replacement, CR 115 (On Browne Ave, 0.35 Mi N of SH 4 to STR# 210310AA0284001 @ Drainage Ditch) | 3 of 6 | $1,565,865 | +13% |
| 04 FEB 2026 | A00101674 | Yoakum District | State Park Improvements, EPWORTH PL (MISSION LAKE ROAD to GUADALUPE DELTA WMA) | 7 of 11 | $512,076 | +50% |
| 06 JAN 2026 | A00206284 | Yoakum District | Bridge Replacement, COUNTY ROAD 281 (@ PONTON CREEK to STR# AA01-72-001) | 5 of 10 | $1,318,015 | +14% |
| 06 NOV 2025 | A00184978 | Yoakum District | Bridge Replacement, CLARK SCHOOL (SPRING CREEK to STR# B001-40-002&B001-40-001 BRIGGS BLVD) | 1 of 9 | $2,877,575 | Low, 1.0% under the second |
| 04 SEP 2025 | A00190970 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 18 (CR 18 Drainage Ditch to 0.55MI E of FM 892) | 1 of 9 | $1,410,757 | Low, 3.0% under the second |
| 04 SEP 2025 | A00134791 | Yoakum District | Bridge Replacement, COUNTY ROAD 177 (CR 177 at BOGGY CREEK to STR# AA01-32-001) | 6 of 10 | $1,668,845 | +11% |
| 26 AUG 2025 | A00215787 | San Angelo District | STRUCTURE MATERIALS, RM 3235 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 1 of 2 | $461,672 | Low, 33% under the second |
| 23 JUL 2025 | A00206740 | San Antonio District | CULVERT REPLACEMENT, MR0681 (MR0681 to MR0681) | 3 of 3 | $127,181 | +29% |
| 02 JUL 2025 | A00134793 | Yoakum District | Bridge Replacement, COUNTY ROAD 130 (CR 130 AT RICKAWAY BRANCH to STR# AA05-61-001) | 4 of 7 | $1,696,763 | +10% |
| 04 JUN 2025 | A00206865 | San Antonio District | Construct Pedestrian Infrastructure, FM 2790 (In Lytle, on FM2790 from SH132(Main St) to 0.5 Mi. East 0f IH 35) | 5 of 7 | $1,904,230 | +54% |
| 04 JUN 2025 | A00187950 | San Antonio District | Bridge Replacement, COUNTY ROAD 241 (CR 241 @ Borrego Creek to .) | 2 of 10 | $724,882 | 0.0% |
| 01 MAY 2025 | A00194194 | Yoakum District | Bridge Replacement, COLOGNE RD (At Draw to STR# AA01-02-001 (Cologne Rd)) | 5 of 7 | $2,226,203 | +16% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.