TxDOT contract A00207409 bid tabulation

Bridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001). Let by Texas DOT on September 2, 2026, Wharton, Yoakum District. 12 bids received; low bid $2,677,071 by Rucoba & Maya Construction, LLC, +14% against the engineer's estimate of $2,343,468.

Owner
Texas DOT
Letting
02 SEP 2026
Pay items
45
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Rucoba & Maya Construction, LLC$2,677,071Low+14%
2Texas Steel Industrial Placing, LLC$2,699,424+1.0%+15%
3R Construction Civil, LLC$2,793,376+4.0%+19%
4E-Z Bel Construction, LLC$2,914,243+9.0%+24%
5STX Civil$2,946,216+10%+26%
6Trevway, Inc.$2,997,035+12%+28%
7John Reed and Company, LLC$3,040,317+14%+30%
8Presidio Contracting, LLC$3,174,902+19%+35%
9Hodges and Son Construction Company, Inc.$3,464,249+29%+48%
10Forde Construction Company, Inc.$3,484,017+30%+49%
11Jfo Services, LLC$3,493,872+31%+49%
12Castillo Aranda LLC$4,378,721+64%+87%
TxDOT contract A00207409: bids by rank

Engineer's estimate: $2,343,468.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Rucoba & Maya Construction, LLC2. Texas Steel Industrial Placing, LLC3. R Construction Civil, LLC4. E-Z Bel Construction, LLC5. STX Civil6. Trevway, Inc.
1Preparing row (100-7002)STA11.75$2,000.00$1,500.00$1,000.00$1,600.00$4,000.00$1,766.51$1,000.00
2Excavation (roadway) (110-7001)CY2,178$19.00$18.00$12.00$16.00$24.00$41.79$6.00
3Excavation (channel) (110-7002)CY1,269$22.00$18.00$12.00$16.00$17.70$18.81$11.37
4Embankment (final)(OC)(type C) (132-7005)CY1,047$25.00$27.00$18.00$22.00$9.70$62.28$13.78
5Blading (150-7002)HR24$75.00$5.00$125.00$120.00$150.00$110.17$43.00
6Broadcast seed (permanent_rural_clay) (164-7002)SY3,483$0.25$0.24$0.22$0.39$0.25$0.26$0.75
7Broadcast seed (temporary_warm) (164-7005)SY872$0.25$0.22$0.20$0.35$0.20$0.24$0.25
8Broadcast seed (temporary_cool) (164-7006)SY872$0.25$0.22$0.20$0.35$0.20$0.24$0.25
9Vegetative watering (168-7001)TGL30$35.00$30.80$28.00$50.00$85.00$32.98$100.00
10FL BS (compacted in place)(type E GR 5)(final pos) (247-7196)CY912$90.00$110.00$90.00$134.00$138.00$138.36$150.00
11Asphalt (RC-250) (316-7016)GAL691$6.00$9.50$19.75$11.50$20.00$22.09$24.95
12Aggregate (type-E, GR-5)(sac-B) (316-7194)CY25$110.00$119.48$1,450.00$1,825.00$1,450.00$1,465.26$1,831.58
13Aggregate (type-PE, GR-4)(sac-B) (316-7232)CY26$115.00$115.58$1,450.00$1,825.00$1,425.00$1,365.10$1,800.00
14Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264)GAL1,177$6.00$10.00$17.50$14.00$17.50$16.43$22.11
15Cem stabil BKFL (400-7010)CY152$200.00$220.00$180.00$87.00$215.00$118.99$100.00
16Drilled shaft (24 in) (416-7004)LF360$190.00$219.44$265.00$206.00$169.00$193.53$265.00
17Drilled shaft (30 in) (416-7005)LF930$245.00$295.14$275.00$272.00$265.00$300.09$439.00
18Class C concrete (abutment) (420-7012)CY82.60$525.00$1,300.00$1,250.00$650.00$1,200.00$1,307.56$706.00
19Class C concrete (cap) (420-7022)CY17$1,500.00$1,600.00$1,500.00$950.00$1,830.00$2,022.56$1,080.00
20Class C concrete (column) (420-7038)CY7.60$600.00$2,400.00$1,500.00$1,050.00$1,160.00$1,606.53$1,751.00
21Reinforced concrete slab (box beam) (422-7005)SF3,922$23.00$22.00$17.00$20.15$29.33$17.80
22Reinforced concrete slab (slab beam) (422-7007)SF4,095$16.00$23.00$22.00$17.00$19.05$30.64$16.00
23Prestressed concrete slab beam (4SB12) (425-7016)LF711$125.00$241.25$290.00$180.00$182.80$211.25$220.00
24Prestressed concrete slab beam (5SB12) (425-7017)LF237$210.00$241.25$290.00$200.00$185.70$280.93$206.00
25Prestressed concrete box beam (5B20) (425-7027)LF774$364.68$290.00$275.00$305.00$309.75$354.00
26Riprap (stone protection)(18 in) (432-7043)CY4,711$145.00$150.00$135.00$208.00$193.00$141.35$175.00
27Rail (type T223) (450-7008)LF588$120.00$135.00$140.00$190.00$109.00$174.51$120.00
28Armor joint (sealed) (454-7003)LF170$125.00$150.00$100.00$74.00$129.00$174.79$100.00
29Set (type II) (24 in) (TP) (6: 1) (P) (467-7332)EACH5$2,900.00$2,000.00$2,900.00$1,650.00$1,918.80$1,200.00
30Thermoplastic pipe (PP) (24") (468-7002)LF240$125.00$65.00$61.00$69.00$82.11$45.00
31Removing structure (bridge 0 - 99 FT length) (496-7009)EACH3$18,000$12,000$25,000$28,000$18,000$22,038$25,000
32Removing structure (small) (496-7036)EACH3$900.00$1,300.00$830.00$650.00$762.64$200.00
33Mobilization (500-7001)LS1$247,300$195,000$269,918$60,000$280,000$223,281$300,000
34Barricades, signs and traffic handling (502-7001)MO14$3,000.00$600.00$1,500.00$8,200.00$1,560.00$2,543.11$2,000.00
35Temporary sediment control fence (install) (506-7039)LF2,010$5.50$3.58$3.25$3.25$3.50$3.83$2.00
36Temporary sediment control fence (remove) (506-7041)LF2,010$1.20$1.10$1.00$1.00$1.00$1.18$0.10
37Driveways (surface treat) (530-7016)SY144$65.00$65.00$124.00$62.00$67.45$50.00
38Metal W-beam guard fence (timber post) (540-7001)LF300$30.00$27.30$23.45$26.00$23.50$31.21$34.64
39Metal beam guard fence trans (thrie-beam) (540-7005)EACH12$2,000.00$1,852.20$1,890.00$1,650.00$1,890.00$2,208.14$1,848.00
40Guardrail end treatment (install) (544-7001)EACH12$2,500.00$3,517.50$3,150.00$3,650.00$3,150.00$3,768.56$3,405.00
41Wire fence (type A) (552-7001)LF567$20.00$15.00$20.00$13.50$35.00$35.14$18.00
42Gate (type 1) (552-7006)EACH1$650.00$1,500.00$1,500.00$3,500.00$2,474.14$5,400.00
43Wire fence (water gap) (552-7010)LF148$40.00$50.00$50.00$35.00$50.00$55.17$47.00
44Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH12$20.00$22.05$30.00$21.00$11.00$37.87$6.00
45Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH24$25.00$32.55$45.00$27.00$45.00$97.14$14.00
TxDOT contract A00207409: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy