R Construction Civil, LLC: TxDOT bid record
R Construction Civil, LLC submitted 81 bids on Texas DOT contracts in the data, from 03 SEP 2020 to 04 NOV 2026, and was the low bidder on 15 of them (19%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $81,579,270
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 8 | 1 | 13% |
| 2023 | 16 | 5 | 31% |
| 2024 | 10 | 4 | 40% |
| 2025 | 14 | 0 | 0% |
| 2026 | 29 | 5 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 30 | 7 | 23% |
| Bryan District | 15 | 4 | 27% |
| Yoakum District | 12 | 2 | 17% |
| Dallas District | 6 | 0 | 0% |
| Beaumont District | 4 | 2 | 50% |
| Waco District | 3 | 0 | 0% |
| Lufkin District | 2 | 0 | 0% |
| San Antonio District | 2 | 0 | 0% |
| Atlanta District | 2 | 0 | 0% |
| Corpus Christi District | 2 | 0 | 0% |
| Fort Worth District | 1 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Cem stabil BKFL | 400-7010 | CY | 73 | 41 (56%) | $78.00 | $200.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 75 | 20 (27%) | $1.00 | $1.00 |
| Class C concrete (abutment) | 420-7012 | CY | 45 | 18 (40%) | $1,200.00 | $1,315.00 |
| Preparing row | 100-7002 | STA | 71 | 16 (23%) | $3,500.00 | $2,750.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 79 | 12 (15%) | $5,000.00 | $5,000.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 57 | 12 (21%) | $28.00 | $27.00 |
| Class C concrete (cap) | 420-7022 | CY | 36 | 12 (33%) | $1,546.50 | $1,557.98 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 42 | 11 (26%) | $580.00 | $643.00 |
| Trench excavation protection | 402-7001 | LF | 34 | 11 (32%) | $5.00 | $10.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 74 | 10 (14%) | $4.00 | $4.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 38 | 10 (26%) | $0.10 | $0.18 |
| Armor joint (sealed) | 454-7003 | LF | 17 | 10 (59%) | $100.00 | $150.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 25 | 8 of 25 |
| James Construction Group, LLC | 22 | 9 of 22 |
| Isi Contracting, Inc. | 21 | 6 of 21 |
| Ser Construction Partners, LLC | 20 | 11 of 20 |
| C. E. Barker, LTD. | 18 | 8 of 18 |
| Harper Brothers Construction LLC | 17 | 11 of 17 |
| Texas Materials Group, Inc. | 17 | 5 of 17 |
| MC2 Civil, LLC | 16 | 7 of 16 |
| Ragle Construction, Inc. | 15 | 3 of 15 |
| E-Z Bel Construction, LLC | 15 | 10 of 15 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 4 of 12 | $34,862,676 | +15% |
| 07 OCT 2026 | A00132124 | Lufkin District | Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475) | 4 of 7 | $39,358,349 | +24% |
| 03 SEP 2026 | A00189990 | Bryan District | Bridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK) | 2 of 7 | $1,146,635 | 0.0% |
| 02 SEP 2026 | A00192185 | Houston District | Bridge Replacement, FM 2004 (At Highland Bayou to .) | 1 of 11 | $3,199,825 | Low, 13% under the second |
| 02 SEP 2026 | A00207409 | Yoakum District | Bridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001) | 3 of 12 | $2,793,376 | +4.0% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 3 of 9 | $33,897,764 | +4.0% |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 6 of 8 | $29,643,710 | +14% |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 5 of 7 | $51,891,161 | +6.0% |
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 4 of 11 | $20,052,430 | +3.0% |
| 03 JUN 2026 | A00183477 | Beaumont District | Bridge Replacement, ERIE ST (AT LNVA CANAL to STR#201240AA0336002) | 1 of 4 | $3,062,119 | Low, 8.0% under the second |
| 02 JUN 2026 | A00184211 | Atlanta District | Bridge Replacement, COUNTY ROAD 430 (At McFaddin Creek Tributary to .) | 4 of 7 | $2,647,645 | +13% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 4 of 17 | $1,098,822 | +16% |
| 07 MAY 2026 | A00130461 | Atlanta District | Transportation Non-Roadway, IH 30 (1.6 Mi W of US 67, WB to 1.0 Mi W of US 67, WB) | 5 of 6 | $11,291,701 | +19% |
| 07 MAY 2026 | A00208023 | Houston District | Rehabilitate Bridge, IH 45 (At McKinney Ramp to .) | 7 of 8 | $10,546,202 | +170% |
| 06 MAY 2026 | A00209252 | Beaumont District | Regional Goods Movement Program, SH 146 (AT IH 10 to .) | 1 of 6 | $4,355,659 | Low, 1.0% under the second |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 3 of 13 | $1,149,885 | +1.0% |
| 08 APR 2026 | A00212486 | Tyler District | Construct Bridge, SL 323 (0.12 mi S of US 271 to UPRR) | 4 of 9 | $1,572,840 | +4.0% |
| 08 APR 2026 | A00131274 | Waco District | Bridge Replacement, COUNTY ROAD 104 (@ WILLIAMS CREEK to (MAP #2)) | 7 of 10 | $2,052,482 | +13% |
| 07 APR 2026 | A00189999 | Bryan District | Bridge Replacement, ARTESIAN PARK RD (ON CR 830 (ARTESIAN PARK LANE, F-CR 419) to AT EAST FORK OF MILL CREEK) | 3 of 9 | $779,787 | +7.0% |
| 07 APR 2026 | A00186047 | Waco District | Bridge Replacement, COUNTY ROAD 325 (FCR 461 @ Hog Creek to (MAP #2064)) | 7 of 12 | $1,328,617 | +27% |
| 05 MAR 2026 | A00200904 | Beaumont District | Bridge Replacement, COUNTY ROAD 2018 (AT HACKBERRY BRANCH to STR# 201760AA0367001) | 2 of 8 | $1,744,495 | +17% |
| 05 MAR 2026 | A00195344 | Paris District | Bridge Replacement, FM 816 (At Loring Creek Relief to .) | 9 of 12 | $2,564,064 | +23% |
| 04 MAR 2026 | A00132533 | Dallas District | Bridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS) | 2 of 9 | $16,856,015 | +2.0% |
| 05 FEB 2026 | A00194041 | Dallas District | Bridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .) | 2 of 15 | $1,245,823 | +2.0% |
| 05 FEB 2026 | A00183903 | Yoakum District | Bridge Replacement, FM 1093 (AT SAN BERNARD RIVER to STR #446-06-035) | 1 of 12 | $4,981,962 | Low, 4.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.