Bridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS). Let by Texas DOT on March 4, 2026, Dallas, Dallas District. 9 bids received; low bid $16,606,597 by Highway 19 Construction LLC, +2.7% against the engineer's estimate of $16,165,949.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 184
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Highway 19 Construction LLC | $16,606,597 | Low | +3.0% |
| 2 | R Construction Civil, LLC | $16,856,015 | +2.0% | +4.0% |
| 3 | Indus Road & Bridge, Inc. | $17,236,229 | +4.0% | +7.0% |
| 4 | Altus Construction LLC | $17,327,418 | +4.0% | +7.0% |
| 5 | Harper Brothers Construction LLC | $18,525,942 | +12% | +15% |
| 6 | Ragle Construction, Inc. | $19,232,026 | +16% | +19% |
| 7 | Webber, LLC | $19,951,728 | +20% | +23% |
| 8 | Ed Bell Construction Company | $21,415,405 | +29% | +32% |
| 9 | Copasa Inc | $24,831,323 | +50% | +54% |
Engineer's estimate: $16,165,949.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Highway 19 Construction LLC | 2. R Construction Civil, LLC | 3. Indus Road & Bridge, Inc. | 4. Altus Construction LLC | 5. Harper Brothers Construction LLC | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 30.10 | $16,000 | $10,000 | $3,000.00 | $13,500 | $56,991 | $7,800.00 | $9,700.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 2,799 | $21.00 | $25.00 | $45.00 | $18.00 | $9.65 | $15.00 | $11.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 1,247 | $11.00 | $25.00 | $11.00 | $20.00 | $10.45 | $5.00 | $9.00 |
| 4 | Removing concrete (curb) (104-7016) | LF | 677 | $8.75 | $10.00 | $5.00 | $5.00 | $12.88 | $5.00 | $7.00 |
| 5 | Removing concrete (appr slab) (104-7030) | SY | 932 | $38.50 | $50.00 | $15.00 | $19.00 | $14.48 | $5.00 | $15.00 |
| 6 | Removing concrete (traffic barrier) (104-7035) | LF | 1,239 | $30.00 | $10.00 | $60.00 | $44.00 | $28.96 | $20.00 | $14.60 |
| 7 | Remove (18"-22") TRT/untrt base & asphalt pavement (105-7018) | SY | 7,567 | $10.50 | $10.00 | $17.00 | $17.00 | $5.64 | $15.00 | $11.50 |
| 8 | Excavation (roadway) (110-7001) | CY | 18,069 | $18.50 | $15.00 | $22.00 | $17.00 | $21.52 | $10.00 | $30.00 |
| 9 | Embankment (final)(DC)(type C1) (132-7008) | CY | 16,591 | $18.00 | $20.00 | $22.00 | $17.00 | $28.94 | $15.00 | $20.00 |
| 10 | Embankment (final)(DC)(type C2) (132-7010) | CY | 37,062 | $25.00 | $18.00 | $22.00 | $53.00 | $36.29 | $50.00 | $54.00 |
| 11 | Compost manuf topsoil (4") (161-7002) | SY | 20,905 | $2.20 | $1.00 | $1.50 | $2.00 | $10.47 | $1.25 | $0.95 |
| 12 | Block sodding (162-7002) | SY | 20,905 | $3.00 | $5.00 | $4.00 | $4.20 | $4.99 | $4.00 | $6.00 |
| 13 | Drill seed (temporary_warm_cool) (164-7015) | SY | 18,568 | $0.33 | $0.13 | $0.25 | $0.27 | $0.14 | $0.25 | $0.31 |
| 14 | Vegetative watering (168-7001) | TGL | 5,873 | $1.00 | $20.00 | $36.00 | $10.00 | $6.25 | $5.00 | $35.30 |
| 15 | FL BS (compacted in place)(type D GR 1-2) (8") (247-7079) | SY | 12,535 | $18.70 | $25.00 | $33.00 | $15.00 | $13.80 | $20.95 | $17.80 |
| 16 | Lime (com or QK)(slurry) (260-7005) | TON | 169 | $300.00 | $350.00 | $350.00 | $410.00 | $337.17 | $375.00 | $468.69 |
| 17 | Lime TRT (existing material & new base)(8") (260-7011) | SY | 12,535 | $5.00 | $8.00 | $6.00 | $6.00 | $4.97 | $10.00 | $4.00 |
| 18 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 3,762 | $4.25 | $4.50 | $5.50 | $6.00 | $5.29 | $5.20 | $6.00 |
| 19 | SP mixes SP-B PG76-22 (344-7007) | TON | 6,896 | $100.00 | $134.00 | $150.00 | $147.00 | $142.11 | $131.00 | $110.00 |
| 20 | SP mixes SP-D PG64-22 (344-7041) | TON | 1,379 | $126.00 | $143.00 | $180.00 | $137.00 | $170.30 | $121.00 | $130.00 |
| 21 | Tack coat (344-7077) | GAL | 3,289 | $4.25 | $1.50 | $3.50 | $4.50 | $3.53 | $4.00 | $6.00 |
| 22 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 1,694 | $175.00 | $200.00 | $210.00 | $177.00 | $199.66 | $158.00 | $172.00 |
| 23 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 1,994 | $3.00 | $10.00 | $5.50 | $4.00 | $5.04 | $8.00 | $7.30 |
| 24 | Planing asphalt concrete pavement(0" to 6") (354-7035) | SY | 573 | $18.00 | $15.00 | $11.00 | $4.50 | $5.04 | $14.00 | $17.40 |
| 25 | Cem stabil BKFL (400-7010) | CY | 441 | $185.00 | $180.00 | $60.00 | $290.00 | $145.04 | $275.00 | $140.00 |
| 26 | Trench excavation protection (402-7001) | LF | 702 | $17.00 | $10.00 | $2.00 | $4.50 | $7.07 | $5.00 | $16.20 |
| 27 | Temporary special shoring (403-7001) | SF | 16,064 | $30.00 | $35.00 | $54.00 | $50.00 | $47.16 | $30.00 | $39.00 |
| 28 | Drilled shaft (18 in) (416-7002) | LF | 90 | $280.00 | $350.00 | $165.00 | $100.00 | $88.18 | $100.00 | $143.00 |
| 29 | Drilled shaft (36 in) (416-7006) | LF | 10 | $296.00 | $300.00 | $800.00 | $750.00 | $217.80 | $662.00 | $662.00 |
| 30 | Drilled shaft (42 in) (416-7007) | LF | 1,706 | $285.00 | $650.00 | $420.00 | $300.00 | $283.65 | $600.00 | $334.00 |
| 31 | Drilled shaft (48 in) (416-7008) | LF | 21 | $350.00 | $600.00 | $925.00 | $850.00 | $287.45 | $765.00 | $765.00 |
| 32 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 13 | $750.00 | $521.00 | $750.00 | $720.00 | $527.78 | $647.00 | $647.00 |
| 33 | Class B concrete (flume) (420-7010) | CY | 9.81 | $675.00 | $1,000.00 | $2,000.00 | $770.00 | $685.48 | $1,500.00 | $740.00 |
| 34 | Class C concrete (abutment)(HPC) (420-7013) | CY | 117.10 | $1,220.00 | $1,400.00 | $2,000.00 | $870.00 | $960.00 | $2,000.00 | $880.00 |
| 35 | Class C concrete (cap)(HPC) (420-7023) | CY | 52.40 | $1,600.00 | $1,700.00 | $2,800.00 | $1,150.00 | $820.71 | $2,250.00 | $1,010.00 |
| 36 | Class C concrete (column)(HPC) (420-7039) | CY | 34.20 | $1,500.00 | $1,800.00 | $1,800.00 | $1,250.00 | $1,619.67 | $2,500.00 | $1,350.00 |
| 37 | Class C concrete (rail foundation) (420-7052) | CY | 274 | $665.00 | $1,000.00 | $460.00 | $475.00 | $337.94 | $675.00 | $636.00 |
| 38 | Reinforced concrete slab (HPC) (422-7002) | SF | 16,221 | $27.50 | $27.00 | $26.00 | $24.00 | $23.38 | $35.00 | $29.10 |
| 39 | Approach slab (HPC) (422-7014) | CY | 262 | $715.00 | $750.00 | $900.00 | $625.00 | $516.02 | $750.00 | $563.00 |
| 40 | Retaining wall (MSE) (423-7001) | SF | 34,821 | $84.00 | $85.00 | $60.00 | $58.00 | $54.82 | $50.00 | $45.00 |
| 41 | Prestressed concrete girder (TX62) (425-7006) | LF | 3,061.80 | $240.00 | $277.00 | $240.00 | $270.00 | $223.40 | $315.00 | $252.00 |
| 42 | Riprap (concrete)(4 in) (432-7001) | CY | 28.25 | $375.00 | $700.00 | $685.00 | $640.00 | $448.72 | $650.00 | $764.00 |
| 43 | Riprap (concrete)(5 in) (432-7002) | CY | 1 | $1,100.00 | $1,000.00 | $455.00 | $1,000.00 | $483.87 | $1,250.00 | $1,500.00 |
| 44 | Riprap (mow strip)(4 in) (432-7013) | CY | 100.28 | $720.00 | $55.00 | $475.00 | $590.00 | $575.06 | $900.00 | $691.00 |
| 45 | Riprap (stone common)(grout)(12 in) (432-7038) | CY | 77 | $285.00 | $180.00 | $195.00 | $190.00 | $92.28 | $275.00 | $223.00 |
| 46 | Rail (type T222)(HPC) (450-7007) | LF | 127 | $135.00 | $220.00 | $360.00 | $290.00 | $106.37 | $225.00 | $155.30 |
| 47 | Rail (type SSTR) (450-7024) | LF | 1,695 | $88.00 | $120.00 | $115.00 | $72.00 | $53.25 | $75.00 | $65.00 |
| 48 | Rail (type SSTR)(HPC) (450-7025) | LF | 2,285.90 | $90.00 | $160.00 | $125.00 | $80.00 | $56.21 | $50.00 | $65.00 |
| 49 | Rail (type T80PP)(HPC) (450-7052) | LF | 114 | $140.00 | $220.00 | $375.00 | $310.00 | $105.41 | $350.00 | $224.00 |
| 50 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 186 | $105.00 | $190.00 | $200.00 | $225.00 | $185.97 | $275.00 | $209.00 |
| 51 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 435 | $350.00 | $550.00 | $420.00 | $350.00 | $402.77 | $418.17 | $404.00 |
| 52 | RC pipe (CL IV)(24 in) (464-7021) | LF | 340 | $160.00 | $110.00 | $250.00 | $150.00 | $148.61 | $375.00 | $133.00 |
| 53 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 1 | $7,200.00 | $6,500.00 | $6,400.00 | $6,000.00 | $5,343.41 | $7,425.00 | $4,700.00 |
| 54 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 1 | $6,100.00 | $9,000.00 | $10,500 | $8,200.00 | $6,849.21 | $12,075 | $7,075.00 |
| 55 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 2 | $9,300.00 | $6,500.00 | $8,200.00 | $8,600.00 | $5,653.78 | $20,500 | $11,775 |
| 56 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 3 | $12,200 | $7,500.00 | $6,600.00 | $8,700.00 | $7,089.82 | $17,175 | $8,400.00 |
| 57 | Headwall (CH - FW - 0) (diameter= 24 in) (466-7005) | EACH | 1 | $7,900.00 | $4,500.00 | $8,300.00 | $11,500 | $6,035.89 | $3,090.00 | $6,200.00 |
| 58 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 1 | $27,500 | $21,000 | $35,000 | $32,000 | $23,928 | $28,160 | $31,000 |
| 59 | Wingwall (SW - 0) (HW=3 FT) (466-7202) | EACH | 1 | $8,300.00 | $9,000.00 | $8,100.00 | $21,000 | $5,185.38 | $7,762.00 | $11,200 |
| 60 | Removing structure (inlet) (496-7002) | EACH | 3 | $750.00 | $1,000.00 | $775.00 | $1,400.00 | $1,955.12 | $2,500.00 | $912.00 |
| 61 | Removing structure (set) (496-7004) | EACH | 2 | $425.00 | $500.00 | $585.00 | $1,300.00 | $749.63 | $750.00 | $610.00 |
| 62 | Removing structure (pipe) (496-7007) | LF | 326 | $25.00 | $50.00 | $1,150.00 | $80.00 | $27.66 | $30.00 | $22.00 |
| 63 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $125,000 | $100,000 | $100,000 | $100,000 | $137,771 | $650,350 | $1,000,000 |
| 64 | Mobilization (500-7001) | LS | 1 | $1,408,268 | $1,700,000 | $1,600,000 | $1,721,286 | $1,724,099 | $1,850,000 | $1,900,000 |
| 65 | Barricades, signs and traffic handling (502-7001) | MO | 27 | $25,000 | $5,000.00 | $8,400.00 | $20,000 | $32,088 | $37,000 | $83,850 |
| 66 | Portable changeable message sign (503-7002) | EACH | 4 | $14,000 | $15,000 | $2,250.00 | $20,000 | $4,558.58 | $35,000 | $25,000 |
| 67 | TMA (stationary) (505-7001) | DAY | 662 | $150.00 | $250.00 | $230.00 | $200.00 | $173.28 | $75.00 | $290.00 |
| 68 | TMA (mobile operation) (505-7003) | DAY | 24 | $300.00 | $1,000.00 | $940.00 | $550.00 | $153.63 | $700.00 | $630.00 |
| 69 | Rock filter dams (install) (type 2) (506-7002) | LF | 512 | $38.00 | $50.00 | $80.00 | $48.00 | $49.64 | $42.00 | $35.50 |
| 70 | Rock filter dams (remove) (506-7011) | LF | 512 | $10.00 | $5.00 | $13.00 | $10.00 | $10.74 | $12.00 | $12.00 |
| 71 | Construction exits (install) (type 1) (506-7020) | SY | 224 | $27.00 | $35.00 | $40.00 | $40.00 | $47.61 | $40.00 | $35.00 |
| 72 | Construction exits (remove) (506-7024) | SY | 224 | $6.00 | $10.00 | $12.00 | $12.00 | $14.89 | $12.00 | $11.00 |
| 73 | Temporary sediment control fence (install) (506-7039) | LF | 4,824 | $3.60 | $4.00 | $4.50 | $4.00 | $4.05 | $4.50 | $3.50 |
| 74 | Temporary sediment control fence (remove) (506-7041) | LF | 4,824 | $1.20 | $1.00 | $0.50 | $0.85 | $1.52 | $0.50 | $1.00 |
| 75 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 365 | $4.00 | $4.00 | $6.00 | $6.00 | $9.72 | $6.00 | $5.75 |
| 76 | Biodegradable erosion control logs (remove) (506-7046) | LF | 365 | $1.00 | $1.00 | $1.00 | $2.00 | $2.63 | $1.00 | $1.10 |
| 77 | Constructing detours (508-7001) | SY | 3,094 | $85.00 | $85.00 | $100.00 | $115.00 | $148.91 | $120.00 | $110.00 |
| 78 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 6,060 | $35.60 | $75.00 | $21.00 | $75.00 | $6.01 | $85.00 | $21.00 |
| 79 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 4,920 | $7.00 | $10.00 | $5.50 | $10.00 | $11.14 | $15.00 | $7.10 |
| 80 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 6,060 | $15.60 | $25.00 | $19.00 | $11.00 | $11.14 | $20.00 | $10.50 |
| 81 | Permanent CTB (F-shape) (mod) (514-7017) | LF | 336 | $87.50 | $180.00 | $400.00 | $400.00 | $72.18 | $250.00 | $186.00 |
| 82 | Concrete curb (type I) (529-7001) | LF | 352 | $51.45 | $35.00 | $28.00 | $27.00 | $13.81 | $15.00 | $24.00 |
| 83 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,375 | $24.00 | $25.00 | $27.00 | $23.00 | $27.66 | $22.45 | $22.50 |
| 84 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $2,560.00 | $2,035.00 | $1,900.00 | $1,900.00 | $2,000.71 | $2,035.00 | $1,850.00 |
| 85 | Short radius (28") (540-7013) | LF | 50 | $28.00 | $49.00 | $80.00 | $27.00 | $50.85 | $48.88 | $25.50 |
| 86 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,200.00 | $1,650.00 | $2,700.00 | $1,210.00 | $1,134.58 | $1,645.00 | $1,200.00 |
| 87 | Remove metal beam guard fence (542-7001) | LF | 2,733 | $2.75 | $3.00 | $3.50 | $3.00 | $3.04 | $2.55 | $2.50 |
| 88 | Remove terminal anchor section (542-7002) | EACH | 2 | $265.00 | $260.00 | $625.00 | $155.00 | $222.86 | $255.00 | $150.00 |
| 89 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $210.00 | $255.00 | $710.00 | $155.00 | $232.99 | $255.00 | $150.00 |
| 90 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 1 | $375.00 | $255.00 | $275.00 | $205.00 | $263.38 | $255.00 | $200.00 |
| 91 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $4,200.00 | $3,110.00 | $3,400.00 | $3,000.00 | $3,317.63 | $3,110.00 | $2,950.00 |
| 92 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $385.00 | $255.00 | $275.00 | $255.00 | $334.30 | $255.00 | $250.00 |
| 93 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 4 | $2,800.00 | $1,100.00 | $1,600.00 | $2,000.00 | $1,544.85 | $1,145.00 | $1,500.00 |
| 94 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $3,800.00 | $1,000.00 | $900.00 | $1,200.00 | $820.54 | $995.00 | $1,500.00 |
| 95 | Crash cushion attenuator (install)(L)(W)(TL3) (545-7008) | EACH | 1 | $52,000 | $46,500 | $47,000 | $50,000 | $39,001 | $46,500 | $42,000 |
| 96 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 5 | $9,750.00 | $7,500.00 | $8,700.00 | $14,000 | $13,862 | $7,575.00 | $15,000 |
| 97 | Pipe underdrains (type 8) (6") (556-7008) | LF | 1,900 | $45.00 | $15.00 | $55.00 | $45.00 | $12.79 | $55.00 | $56.60 |
| 98 | Remove RD IL asm (trans-base) (610-7009) | EACH | 2 | $400.00 | $1,300.00 | $1,150.00 | $1,100.00 | $1,296.66 | $941.00 | $941.00 |
| 99 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 2,466 | $19.50 | $10.00 | $16.00 | $15.00 | $9.82 | $13.35 | $13.35 |
| 100 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 1,108 | $30.00 | $28.00 | $42.00 | $42.00 | $23.77 | $37.75 | $37.75 |
| 101 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 6,752 | $25.50 | $11.00 | $12.00 | $12.00 | $10.69 | $10.25 | $10.25 |
| 102 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 924 | $50.00 | $34.00 | $40.00 | $40.00 | $34.13 | $35.50 | $35.50 |
| 103 | Conduit (prepare) (618-7090) | LF | 227 | $2.00 | $5.00 | $5.50 | $5.50 | $4.87 | $4.80 | $4.80 |
| 104 | ITS multi-duct CND (PVC-40) (619-7001) | LF | 4,222 | $27.50 | $29.00 | $35.00 | $35.00 | $28.77 | $31.00 | $31.00 |
| 105 | ITS multi-duct CND (PVC-40)(bore) (619-7002) | LF | 767 | $45.00 | $40.00 | $79.00 | $79.00 | $30.28 | $71.30 | $71.30 |
| 106 | Electrical conductor (no.12) insulated (620-7004) | LF | 1,226 | $2.85 | $1.09 | $2.00 | $1.80 | $1.10 | $1.60 | $1.60 |
| 107 | Electrical conductor (no.10) insulated (620-7006) | LF | 780 | $2.00 | $1.31 | $2.00 | $2.00 | $1.33 | $1.80 | $1.80 |
| 108 | Electrical conductor (no.8) bare (620-7007) | LF | 273 | $3.00 | $1.93 | $2.00 | $2.00 | $1.98 | $1.75 | $1.75 |
| 109 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,831 | $3.00 | $2.00 | $2.50 | $2.50 | $1.88 | $2.25 | $2.25 |
| 110 | Electrical conductor (no.6) bare (620-7009) | LF | 3,815 | $4.00 | $2.00 | $2.50 | $2.50 | $2.03 | $2.20 | $2.20 |
| 111 | Electrical conductor (no.6) insulated (620-7010) | LF | 4,384 | $7.20 | $2.00 | $3.25 | $3.20 | $2.03 | $2.80 | $2.80 |
| 112 | Electrical conductor (no.4) bare (620-7011) | LF | 1,032 | $3.00 | $3.50 | $3.30 | $3.30 | $3.55 | $2.95 | $2.95 |
| 113 | Electrical conductor (no.4) insulated (620-7012) | LF | 10,376 | $3.75 | $3.50 | $4.00 | $4.00 | $3.32 | $3.60 | $3.50 |
| 114 | ITS GND box(pcast) type 1 (243660)W/aprn (623-7006) | EACH | 12 | $7,000.00 | $4,500.00 | $7,200.00 | $7,200.00 | $4,473.48 | $6,485.00 | $6,485.00 |
| 115 | ITS GND box(pcast) type 2 (366060)W/aprn (623-7012) | EACH | 1 | $13,500 | $6,300.00 | $10,800 | $10,900 | $6,366.81 | $9,680.00 | $9,680.00 |
| 116 | Remove ITS ground box (623-7041) | EACH | 5 | $835.00 | $1,000.00 | $400.00 | $400.00 | $1,570.18 | $355.00 | $355.00 |
| 117 | Ground box type C (162911)W/apron (624-7006) | EACH | 7 | $2,915.00 | $1,400.00 | $2,400.00 | $2,400.00 | $1,365.55 | $2,090.00 | $2,090.00 |
| 118 | Aluminum signs (type A) (636-7001) | SF | 28 | $45.00 | $35.00 | $50.00 | $43.00 | $24.31 | $42.69 | $50.00 |
| 119 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $620.00 | $690.00 | $600.00 | $36.00 | $545.24 | $665.00 | $1,000.00 |
| 120 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $975.00 | $717.00 | $600.00 | $920.00 | $1,023.15 | $775.00 | $1,200.00 |
| 121 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 1 | $4,865.00 | $6,000.00 | $600.00 | $5,000.00 | $4,178.70 | $6,960.00 | $7,500.00 |
| 122 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $535.00 | $500.00 | $500.00 | $660.00 | $815.48 | $875.00 | $700.00 |
| 123 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 26 | $18.00 | $65.00 | $55.00 | $21.00 | $24.31 | $15.00 | $20.00 |
| 124 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 55 | $20.00 | $65.00 | $55.00 | $56.00 | $30.39 | $25.00 | $25.00 |
| 125 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 1,790 | $1.55 | $1.75 | $2.50 | $2.20 | $1.01 | $1.75 | $1.50 |
| 126 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 76 | $4.70 | $2.00 | $5.00 | $2.50 | $5.07 | $2.00 | $1.50 |
| 127 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 6,706 | $1.75 | $1.50 | $2.00 | $1.90 | $1.01 | $1.50 | $1.25 |
| 128 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 234 | $3.75 | $3.00 | $5.00 | $3.80 | $5.07 | $3.00 | $2.00 |
| 129 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 666 | $2.50 | $2.25 | $4.50 | $2.80 | $2.03 | $2.25 | $2.00 |
| 130 | Work zone pavement marking removing (W)12"(solid) (662-7075) | LF | 50 | $12.45 | $6.00 | $9.00 | $7.50 | $10.13 | $6.00 | $3.50 |
| 131 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 2 | $385.00 | $200.00 | $600.00 | $250.00 | $253.25 | $200.00 | $250.00 |
| 132 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 2 | $425.00 | $245.00 | $650.00 | $305.00 | $253.25 | $245.00 | $250.00 |
| 133 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 7,394 | $1.12 | $1.75 | $2.00 | $2.20 | $0.51 | $1.75 | $1.25 |
| 134 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 268 | $1.87 | $1.65 | $4.25 | $2.10 | $2.03 | $1.65 | $1.50 |
| 135 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 225 | $2.25 | $1.75 | $2.50 | $2.20 | $5.07 | $1.75 | $2.00 |
| 136 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 131 | $2.20 | $4.00 | $10.00 | $5.00 | $5.07 | $4.00 | $4.00 |
| 137 | Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060) | EACH | 2 | $680.00 | $425.00 | $650.00 | $530.00 | $607.81 | $425.00 | $350.00 |
| 138 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 1 | $1,700.00 | $1,400.00 | $2,300.00 | $1,800.00 | $709.11 | $1,400.00 | $1,500.00 |
| 139 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 1 | $1,600.00 | $1,950.00 | $2,400.00 | $2,500.00 | $709.11 | $1,950.00 | $2,000.00 |
| 140 | Pavement sler 6" (666-7347) | LF | 2,305 | $0.28 | $0.30 | $0.40 | $0.40 | $0.30 | $0.30 | $0.25 |
| 141 | Pavement sler 8" (666-7348) | LF | 225 | $1.31 | $0.60 | $0.65 | $0.80 | $1.01 | $0.60 | $0.25 |
| 142 | Pavement sler 12" (666-7350) | LF | 131 | $1.45 | $1.75 | $2.00 | $2.20 | $1.01 | $1.75 | $0.50 |
| 143 | Pavement sler (arrow) (666-7353) | EACH | 1 | $50.00 | $50.00 | $60.00 | $63.00 | $101.30 | $50.00 | $20.00 |
| 144 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,610 | $2.50 | $1.70 | $1.50 | $2.20 | $1.01 | $1.70 | $0.90 |
| 145 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,053 | $1.09 | $1.35 | $1.50 | $1.70 | $1.01 | $1.35 | $0.65 |
| 146 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,772 | $1.50 | $1.35 | $1.50 | $1.70 | $1.01 | $1.35 | $0.65 |
| 147 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 217 | $7.00 | $7.25 | $7.00 | $9.10 | $10.13 | $7.25 | $4.25 |
| 148 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,868 | $0.65 | $0.85 | $1.00 | $1.10 | $1.01 | $0.85 | $0.55 |
| 149 | Eliminating existing PM & markers (8") (677-7004) | LF | 705 | $2.50 | $125.00 | $2.00 | $1.60 | $3.04 | $1.25 | $0.65 |
| 150 | Pavement surface preparation for marking (6") (678-7002) | LF | 15,350 | $0.70 | $0.25 | $0.25 | $0.32 | $0.27 | $0.25 | $0.07 |
| 151 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,029 | $1.00 | $0.30 | $0.25 | $0.40 | $0.30 | $0.30 | $0.07 |
| 152 | Pavement surface preparation for marking (12") (678-7006) | LF | 293 | $1.30 | $1.00 | $1.00 | $1.25 | $0.30 | $1.00 | $0.14 |
| 153 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $20.00 | $45.00 | $30.00 | $56.00 | $70.91 | $45.00 | $10.00 |
| 154 | Ins traffic signal PL AM(S)1 arm(48') (686-7049) | EACH | 1 | $17,500 | $15,000 | $19,000 | $18,500 | $15,195 | $16,260 | $16,260 |
| 155 | Remove traffic signal PL (686-7313) | EACH | 1 | $4,300.00 | $2,600.00 | $3,400.00 | $3,400.00 | $2,583.19 | $3,000.00 | $3,000.00 |
| 156 | Install circuit breaker (690-7234) | EACH | 4 | $198.00 | $270.00 | $260.00 | $260.00 | $405.01 | $228.00 | $228.00 |
| 157 | Stone columns (30 in) (4052-7001) | LF | 21,270 | $50.00 | $10.00 | $41.00 | $37.00 | $38.75 | $45.00 | $51.00 |
| 158 | Barrier gate (5034-7001) | EACH | 1 | $25,000 | $5,000.00 | $11,000 | $21,000 | $3,798.82 | $29,991 | $21,500 |
| 159 | ITS RVSD (data collect & wwa) sys (6010-7001) | EACH | 1 | $26,500 | $10,000 | $15,000 | $15,000 | $10,130 | $12,715 | $12,715 |
| 160 | ITS RVSD (DC & wwa)(relocate) (6010-7004) | EACH | 6 | $3,100.00 | $3,300.00 | $1,300.00 | $1,350.00 | $3,337.89 | $1,175.00 | $1,175.00 |
| 161 | ITS pole MNT cab (type 2)(conf 2) (6011-7002) | EACH | 2 | $7,420.00 | $6,740.00 | $8,600.00 | $8,600.00 | $12,641 | $7,750.00 | $7,750.00 |
| 162 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 1 | $29,500 | $24,000 | $36,000 | $36,000 | $46,300 | $32,270 | $32,270 |
| 163 | ITS pole (40 FT)(relocate) (6011-7013) | EACH | 1 | $5,200.00 | $8,450.00 | $4,500.00 | $4,500.00 | $12,534 | $4,020.00 | $4,020.00 |
| 164 | ITS pole MNT cab (type 3)(conf 1)(rel) (6011-7026) | EACH | 1 | $8,300.00 | $1,870.00 | $1,800.00 | $1,800.00 | $1,894.34 | $1,595.00 | $1,595.00 |
| 165 | Ground box (prepare) (6013-7006) | EACH | 14 | $235.00 | $290.00 | $400.00 | $400.00 | $739.44 | $357.00 | $357.00 |
| 166 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 1 | $5,500.00 | $1,000.00 | $1,100.00 | $1,100.00 | $989.72 | $941.00 | $941.00 |
| 167 | Relocate CCTV field equipment (6018-7007) | EACH | 1 | $2,800.00 | $1,900.00 | $1,300.00 | $1,400.00 | $5,478.53 | $1,175.00 | $1,175.00 |
| 168 | CCTV mount (pedestal) (6018-7010) | EACH | 1 | $2,500.00 | $390.00 | $1,400.00 | $1,450.00 | $395.08 | $1,265.00 | $1,265.00 |
| 169 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 250 | $6.00 | $2.90 | $8.00 | $8.00 | $2.89 | $7.10 | $7.10 |
| 170 | Fiber optic CBL (single-mode)(36 fiber) (6027-7002) | LF | 660 | $5.00 | $2.40 | $10.00 | $10.00 | $2.42 | $8.80 | $8.80 |
| 171 | Fiber optic fusion splice (6027-7004) | EACH | 300 | $90.00 | $325.00 | $89.00 | $89.00 | $329.23 | $80.00 | $80.00 |
| 172 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 2 | $1,500.00 | $1,350.00 | $1,500.00 | $1,500.00 | $13,200 | $1,295.00 | $1,295.00 |
| 173 | Fiber optic patch panel (36 positions) (6027-7007) | EACH | 1 | $1,800.00 | $2,200.00 | $2,100.00 | $2,100.00 | $2,218.51 | $1,838.00 | $1,838.30 |
| 174 | FO splice enclosure (type 1) (6027-7009) | EACH | 7 | $2,800.00 | $3.00 | $1,700.00 | $1,700.00 | $2,932.69 | $1,475.00 | $1,475.00 |
| 175 | Fiber optic CBL (single-mode)(6 fiber) (6027-7011) | LF | 1,940 | $4.00 | $3.00 | $7.00 | $7.00 | $2.34 | $5.75 | $5.75 |
| 176 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 4 | $1,730.00 | $2,900.00 | $1,150.00 | $1,290.00 | $2,850.63 | $1,012.00 | $1,012.00 |
| 177 | Fiber optic CBL (SNGL-mode)(48 fiber) (6027-7013) | LF | 5,891 | $5.00 | $5.00 | $11.00 | $11.00 | $4.93 | $9.85 | $9.85 |
| 178 | Fiber optic CBL (sing-mode)(24 fiber) (6027-7019) | LF | 1,675 | $4.00 | $4.00 | $8.00 | $8.00 | $7.79 | $7.15 | $7.15 |
| 179 | Fiber optic patch panel (48 position) (6027-7038) | EACH | 3 | $2,000.00 | $8,000.00 | $2,200.00 | $2,200.00 | $12,366 | $1,985.00 | $1,985.00 |
| 180 | Fiber optic patch panel (24 position) (6027-7043) | EACH | 1 | $2,000.00 | $4,000.00 | $1,700.00 | $1,700.00 | $3,976.09 | $1,500.00 | $1,500.00 |
| 181 | Ethernet switch (install only) (6036-7001) | EACH | 4 | $2,750.00 | $10,000 | $1,500.00 | $1,400.00 | $1,519.53 | $1,245.00 | $1,245.00 |
| 182 | Installation of terminal server (6046-7001) | EACH | 1 | $1,950.00 | $1,000.00 | $175.00 | $175.00 | $1,013.02 | $155.00 | $155.00 |
| 183 | Remove hub building (6048-7001) | EACH | 1 | $4,000.00 | $23,610 | $9,000.00 | $9,000.00 | $23,917 | $8,110.00 | $7,500.00 |
| 184 | ITS GRND MNT cab (type 4) (conf 2) (6050-7004) | EACH | 1 | $19,000 | $8,690.00 | $17,000 | $16,500 | $8,803.12 | $14,891 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way