Copasa Inc: TxDOT bid record
Copasa Inc submitted 38 bids on Texas DOT contracts in the data, from 05 AUG 2020 to 01 JUL 2026, and was the low bidder on 5 of them (13%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $90,307,901
- Latest bid
- 01 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 13 | 3 | 23% |
| 2022 | 5 | 1 | 20% |
| 2025 | 6 | 1 | 17% |
| 2026 | 9 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 9 | 2 | 22% |
| Yoakum District | 5 | 1 | 20% |
| Austin District | 5 | 0 | 0% |
| Dallas District | 5 | 1 | 20% |
| Tyler District | 4 | 1 | 25% |
| Beaumont District | 2 | 0 | 0% |
| Atlanta District | 2 | 0 | 0% |
| San Antonio District | 2 | 0 | 0% |
| Corpus Christi District | 2 | 0 | 0% |
| Wichita Falls District | 1 | 0 | 0% |
| Fort Worth District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 28 | 13 (46%) | $4.50 | $5.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 38 | 11 (29%) | $15,208 | $5,000.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 31 | 11 (35%) | $680.00 | $710.00 |
| Electrical conductor (no.6) bare | 620-7009 | LF | 21 | 11 (52%) | $1.80 | $2.10 |
| Remove metal beam guard fence | 542-7001 | LF | 29 | 10 (34%) | $2.61 | $3.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 28 | 10 (36%) | $87.84 | $110.00 |
| Crash cushion attenuator (remove) | 545-7004 | EACH | 25 | 10 (40%) | $750.00 | $1,000.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 18 | 10 (56%) | $0.38 | $0.60 |
| Electrical conductor (no.8) insulated | 620-7008 | LF | 18 | 10 (56%) | $1.83 | $2.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 37 | 8 (22%) | $0.93 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 37 | 8 (22%) | $3.85 | $4.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 30 | 8 (27%) | $3,052.50 | $3,245.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ragle Construction, Inc. | 16 | 10 of 16 |
| James Construction Group, LLC | 13 | 12 of 13 |
| Harper Brothers Construction LLC | 11 | 7 of 11 |
| Webber, LLC | 9 | 8 of 9 |
| Zachry Construction Corporation | 8 | 5 of 8 |
| Hunter Industries, LTD. | 8 | 7 of 8 |
| Angel Brothers Holdings Corp. | 6 | 6 of 6 |
| Isi Contracting, Inc. | 6 | 2 of 6 |
| East Texas Bridge, Inc. | 6 | 4 of 6 |
| Altus Construction LLC | 6 | 4 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 11 of 11 | $29,615,658 | +52% |
| 01 JUL 2026 | A00193362 | San Antonio District | Hazard Elimination & Safety, IH 35 (SBFR IH 35 at Loma Vista to SBFR IH 35 at Peach Ave) | 7 of 7 | $15,689,186 | +30% |
| 03 JUN 2026 | A00062698 | San Antonio District | Widen Road - Add Lanes, SH 123 (Cordova Ln. to IH 10) | 6 of 6 | $52,249,858 | +28% |
| 02 JUN 2026 | A00064555 | Fort Worth District | Widen Road - Add Lanes, SH 174 (Wicker Hill Rd to North of Elk Dr.) | 8 of 8 | $24,437,942 | +23% |
| 06 MAY 2026 | A00176646 | Corpus Christi District | Bridge Replacement, OCEAN DR (On Ocean Drive to At Cayo Del Oso Bridge) | 6 of 7 | $20,053,645 | +35% |
| 08 APR 2026 | A00186409 | Corpus Christi District | Bridge Replacement, YORKTOWN BLVD (3.7 MI E OF FM 2444 to .) | 4 of 5 | $27,146,162 | +28% |
| 04 MAR 2026 | A00132533 | Dallas District | Bridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS) | 9 of 9 | $24,831,323 | +50% |
| 04 FEB 2026 | A00205634 | Dallas District | Construct New Road, SS 394 (IH 35E to FM 877) | 11 of 11 | $34,327,526 | +81% |
| 04 FEB 2026 | A00045441 | Dallas District | Widen Road - Add Lanes, FM 549 (SH 205 to SH 276) | 12 of 12 | $44,776,051 | +50% |
| 02 DEC 2025 | A00188972 | Yoakum District | Bridge Replacement, SH 35 (AT CARANCAHUA BAY to STR# 0179-09-062) | 1 of 6 | $21,288,202 | Low, 12% under the second |
| 06 NOV 2025 | A00062085 | Austin District | Construct Bridge, SL 360 (AT COURTYARD DRIVE to .) | 6 of 8 | $72,992,878 | +7.0% |
| 05 SEP 2025 | A00063821 | Tyler District | Bridge Replacement, IH 20 (.955 MI W OF SABINE RIVER to .842 MI E OF SABINE RIVER) | 10 of 10 | $48,556,554 | +31% |
| 08 AUG 2025 | A00063966 | Austin District | Highway Improvement, SH 95 (SL 230 to SOUTH OF FM 535) | 6 of 6 | $24,123,724 | +28% |
| 07 AUG 2025 | A00135447 | Austin District | Bridge Replacement, US 77 (0.10 MILES SOUTH OF N. JAEGER STREET to NORTH OF INDEPENDENCE STREET) | 6 of 10 | $16,819,807 | +27% |
| 02 JUL 2025 | A00058519 | Tyler District | Widen Road - Add Lanes, SL 485 (US 271, IN S GLADEWATER, NORTHERLY to US 80 IN EAST GLADEWATER) | 6 of 6 | $48,433,712 | +52% |
| 02 DEC 2022 | 12223214 | Tyler District | FM 316 Rehabilitate existing roadway from VAN ZANDT C/L (FM 1861) to US 175 | 5 of 5 | $15,612,620 | +97% |
| 01 DEC 2022 | 12223004 | Dallas District | IH 35E Highway operations program from FRANKFORD RD to CORPORATE DR | 1 of 5 | $17,598,675 | Low, 10% under the second |
| 02 NOV 2022 | 11223010 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 8 of 8 | $12,996,672 | +19% |
| 06 OCT 2022 | 10223005 | Yoakum District | FM 1301 Highway improvement from SH 60 IN WHARTON to US 59 | 5 of 5 | $17,852,745 | +23% |
| 08 SEP 2022 | 09223211 | Houston District | IH 69 Bridge replacement from AT OYSTER CREEK | 5 of 5 | $9,436,080 | +60% |
| 04 NOV 2021 | 11213204 | Austin District | FM 110 Construct new road from SH 21 to EAST OF IH 35 | 7 of 7 | $45,266,711 | +24% |
| 04 NOV 2021 | 11213228 | Atlanta District | US 271 Replace bridges and approaches from AT DICKSON CREEK AND BIG SLOUGH | 4 of 6 | $25,300,502 | +14% |
| 03 NOV 2021 | 11213019 | Atlanta District | IH 30 Rehabilitate and widen existing ramps from AT US 259 | 2 of 3 | $35,626,957 | +7.0% |
| 02 SEP 2021 | 09213202 | Beaumont District | US 69 Highway improvement from AT SH 73 | 5 of 5 | $83,384,490 | +19% |
| 05 AUG 2021 | 08213208 | Houston District | FM 1495 Bridge replacement from AT OLD BRAZOS RIVER/E 2ND/RR | 2 of 6 | $29,221,175 | +2.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.