TxDOT contract A00193362 bid tabulation
Hazard Elimination & Safety, IH 35 (SBFR IH 35 at Loma Vista to SBFR IH 35 at Peach Ave). Let by Texas DOT on July 1, 2026, Comal, San Antonio District. 7 bids received; low bid $12,034,296 by J3 Company, LLC, -17% against the engineer's estimate of $14,509,412.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 173
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | J3 Company, LLC | $12,034,296 | Low | -17% |
| 2 | Capital Excavation Company | $13,440,747 | +12% | -7.0% |
| 3 | E-Z Bel Construction, LLC | $14,464,111 | +20% | 0.0% |
| 4 | STX Civil | $14,479,933 | +20% | 0.0% |
| 5 | Go Underground, Limited Liability Company | $14,861,824 | +23% | +2.0% |
| 6 | Hunter Industries, LTD. | $14,906,103 | +24% | +3.0% |
| 7 | Copasa Inc | $15,689,186 | +30% | +8.0% |
Engineer's estimate: $14,509,412.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. J3 Company, LLC | 2. Capital Excavation Company | 3. E-Z Bel Construction, LLC | 4. STX Civil | 5. Go Underground, Limited Liability Company | 6. Hunter Industries, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 45 | $21,050 | $8,000.00 | $10,000 | $16,000 | $429.24 | $5,200.00 | $1,500.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 30,577 | $18.00 | $32.00 | $25.50 | $20.00 | $18.77 | $18.00 | $35.00 |
| 3 | Embankment (final)(OC)(type C) (132-7005) | CY | 4,699 | $22.00 | $40.00 | $51.00 | $37.00 | $37.34 | $24.00 | $25.00 |
| 4 | Embankment (final)(DC)(type C) (132-7006) | CY | 17 | $25.00 | $80.00 | $320.00 | $16.00 | $52.65 | $24.00 | $45.00 |
| 5 | Furn & place topsoil (6") (160-7004) | SY | 13,563 | $8.00 | $3.00 | $1.95 | $2.00 | $4.03 | $5.36 | $5.00 |
| 6 | Roll sodding (162-7008) | SY | 2,339 | $8.00 | $8.00 | $6.45 | $6.00 | $7.30 | $12.00 | $6.50 |
| 7 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 13,563 | $0.25 | $0.25 | $0.20 | $0.18 | $0.22 | $12.00 | $0.24 |
| 8 | Fertilizer (166-7001) | ACRE | 3 | $600.00 | $500.00 | $540.00 | $500.00 | $613.21 | $1,200.00 | $1,921.26 |
| 9 | Vegetative watering (168-7001) | TGL | 2,203 | $20.00 | $25.00 | $36.30 | $43.00 | $42.92 | $12.00 | $50.00 |
| 10 | Soil ret BLKT(SL_mod_clay_short) (169-7001) | SY | 96 | $2.00 | $3.00 | $3.25 | $3.00 | $3.68 | $22.00 | $3.83 |
| 11 | Soil ret BLKT(SL_steep_clay_short) (169-7005) | SY | 225 | $2.00 | $4.00 | $4.35 | $4.00 | $4.91 | $22.00 | $2.76 |
| 12 | Proof rolling (216-7001) | HR | 14 | $180.00 | $150.00 | $89.95 | $152.00 | $194.45 | $220.00 | $85.25 |
| 13 | FL BS (compacted in place)(type A GR 1-2) (247-7001) | TON | 578 | $55.00 | $35.00 | $71.25 | $64.00 | $58.41 | $104.00 | $42.00 |
| 14 | FL BS (compacted in place)(type D GR 1-2) (247-7013) | TON | 14,633 | $40.00 | $35.00 | $36.00 | $45.00 | $58.41 | $42.00 | $42.00 |
| 15 | FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188) | CY | 157 | $65.00 | $70.00 | $160.00 | $130.00 | $58.41 | $56.00 | $82.00 |
| 16 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 533 | $400.00 | $310.00 | $310.00 | $330.00 | $364.24 | $300.00 | $350.00 |
| 17 | Lime TRT (existing material)(6") (260-7006) | SY | 35,876 | $5.00 | $6.50 | $12.60 | $8.00 | $7.52 | $6.00 | $6.00 |
| 18 | CM TRT(PT MX)(CL L)(tya)(GR1-2)(in vehicle) (276-7001) | CY | 840 | $173.00 | $150.00 | $205.00 | $18.00 | $184.13 | $50.00 | $125.00 |
| 19 | Tack coat (292-7017) | GAL | 8,239 | $6.00 | $5.00 | $3.15 | $4.00 | $3.68 | $18.00 | $4.50 |
| 20 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 6,592 | $5.00 | $6.00 | $5.00 | $4.00 | $5.83 | $18.00 | $6.50 |
| 21 | D-GR HMA type-B PG64-22 (341-7001) | TON | 15,391 | $100.00 | $88.00 | $87.65 | $80.00 | $102.10 | $140.88 | $100.00 |
| 22 | SP mixes SP-C sac-B PG76-22 (344-7031) | TON | 3,256 | $95.00 | $110.00 | $113.00 | $131.00 | $131.23 | $140.88 | $110.00 |
| 23 | Flexible pavement structure repair(2") (351-7001) | SY | 716 | $40.00 | $30.00 | $52.30 | $30.00 | $34.32 | $80.00 | $20.00 |
| 24 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 958 | $2.00 | $10.00 | $3.70 | $7.50 | $4.29 | $8.00 | $3.25 |
| 25 | Concrete pavement (joint reinforced) (10") (360-7094) | SY | 2,069 | $100.00 | $110.00 | $161.00 | $160.00 | $147.99 | $212.56 | $125.00 |
| 26 | Full - depth repair CRCP (6") (361-7001) | CY | 62 | $38.00 | $650.00 | $650.00 | $450.00 | $341.38 | $1,200.00 | $2,000.00 |
| 27 | Cut & restoring pavement (400-7006) | SY | 249 | $200.00 | $200.00 | $480.00 | $200.00 | $331.19 | $90.00 | $771.83 |
| 28 | Flowable backfill (401-7001) | CY | 528 | $350.00 | $180.00 | $215.00 | $230.00 | $218.88 | $180.00 | $178.79 |
| 29 | Trench excavation protection (402-7001) | LF | 6,151 | $8.00 | $5.00 | $7.30 | $1.00 | $8.25 | $4.00 | $18.89 |
| 30 | Drilled shaft (42 in) (416-7007) | LF | 80 | $350.00 | $400.00 | $430.00 | $460.00 | $588.68 | $1,200.00 | $578.15 |
| 31 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 352 | $300.00 | $260.00 | $280.00 | $340.00 | $429.24 | $396.80 | $245.35 |
| 32 | Slab span (422-7017) | CY | 4 | $1,200.00 | $2,000.00 | $2,870.00 | $1,600.00 | $2,034.87 | $1,400.00 | $3,905.63 |
| 33 | Retaining wall (spread footing) (423-7015) | SF | 280 | $120.00 | $85.00 | $124.00 | $140.00 | $90.74 | $120.00 | $202.48 |
| 34 | Riprap (concrete)(4 in) (432-7001) | CY | 1 | $700.00 | $2,000.00 | $1,410.00 | $600.00 | $1,000.03 | $1,000.00 | $1,050.06 |
| 35 | Rail (handrail)(type C) (450-7060) | LF | 100 | $200.00 | $180.00 | $166.00 | $225.00 | $275.94 | $220.00 | $146.07 |
| 36 | Rail (handrail)(type F) (450-7063) | LF | 51 | $225.00 | $240.00 | $193.00 | $250.00 | $306.60 | $289.80 | $129.87 |
| 37 | RC pipe (CL III)(24 in) (464-7005) | LF | 2,055 | $120.00 | $130.00 | $172.00 | $220.00 | $110.26 | $117.09 | $236.63 |
| 38 | RC pipe (CL III)(30 in) (464-7007) | LF | 1,486 | $140.00 | $160.00 | $204.00 | $300.00 | $146.60 | $147.55 | $264.73 |
| 39 | RC pipe (CL III)(36 in) (464-7009) | LF | 338 | $190.00 | $220.00 | $250.00 | $370.00 | $191.43 | $191.05 | $383.39 |
| 40 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 1 | $8,000.00 | $8,800.00 | $8,300.00 | $10,000 | $11,992 | $13,000 | $12,175 |
| 41 | Manh (complete)(PRM)(60IN) (465-7003) | EACH | 5 | $10,000 | $9,400.00 | $13,500 | $22,000 | $14,819 | $17,000 | $14,106 |
| 42 | Manh (complete)(PRM)(72IN) (465-7004) | EACH | 3 | $13,000 | $11,000 | $16,900 | $33,000 | $24,311 | $24,000 | $15,979 |
| 43 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 1 | $6,500.00 | $7,800.00 | $12,100 | $25,000 | $9,447.08 | $11,804 | $11,147 |
| 44 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 4 | $8,000.00 | $6,500.00 | $11,500 | $25,000 | $11,342 | $12,572 | $12,389 |
| 45 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 3 | $11,000 | $8,900.00 | $9,700.00 | $25,000 | $12,051 | $13,336 | $14,190 |
| 46 | Inlet (complete)(pco)(5FT)(left) (465-7022) | EACH | 15 | $8,000.00 | $10,500 | $11,800 | $23,000 | $17,137 | $17,170 | $15,040 |
| 47 | Inlet (complete)(pco)(5FT)(right) (465-7023) | EACH | 12 | $10,000 | $10,500 | $11,700 | $23,000 | $17,241 | $7,575.92 | $15,040 |
| 48 | Inlet (complete)(pco)(6FT)(left) (465-7026) | EACH | 3 | $8,000.00 | $11,500 | $15,700 | $24,000 | $19,102 | $18,193 | $16,269 |
| 49 | Inlet (complete)(pcu)(6FT)(both) (465-7044) | EACH | 1 | $9,000.00 | $12,500 | $15,200 | $26,000 | $19,691 | $18,691 | $19,024 |
| 50 | Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160) | EACH | 4 | $8,000.00 | $9,500.00 | $8,200.00 | $20,000 | $11,722 | $12,572 | $11,920 |
| 51 | Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162) | EACH | 3 | $10,500 | $10,100 | $7,900.00 | $17,000 | $13,033 | $13,037 | $13,637 |
| 52 | Junct box (complete)(JB)(7FT X 5FT)(FTW) (465-7293) | EACH | 3 | $16,000 | $16,500 | $14,300 | $40,000 | $21,480 | $20,500 | $15,925 |
| 53 | Adjusting manholes (479-7001) | EACH | 3 | $2,000.00 | $3,500.00 | $2,050.00 | $3,000.00 | $1,121.37 | $6,500.00 | $2,627.48 |
| 54 | Removing structure (inlet) (496-7002) | EACH | 22 | $1,250.00 | $1,500.00 | $1,960.00 | $1,000.00 | $1,445.06 | $400.00 | $1,577.04 |
| 55 | Removing structure (manhole) (496-7003) | EACH | 3 | $1,550.00 | $3,500.00 | $1,940.00 | $1,000.00 | $1,444.93 | $400.00 | $2,102.72 |
| 56 | Removing structure (pipe) (496-7007) | LF | 543 | $20.00 | $25.00 | $23.05 | $60.00 | $25.69 | $8.00 | $34.18 |
| 57 | Mobilization (500-7001) | LS | 1 | $1,300,000 | $890,000 | $1,155,000 | $900,000 | $1,316,358 | $1,001,451 | $1,350,000 |
| 58 | Mobilization (callout) (500-7002) | EACH | 2 | $20,000 | $10,000 | $16,900 | $45,000 | $16,875 | $20,000 | $5,000.00 |
| 59 | Barricades, signs and traffic handling (502-7001) | MO | 22 | $12,000 | $12,000 | $11,000 | $3,000.00 | $10,874 | $6,500.00 | $3,236.43 |
| 60 | Portable changeable message sign (503-7001) | DAY | 1,440 | $90.00 | $30.00 | $35.55 | $100.00 | $21.25 | $200.00 | $125.00 |
| 61 | Construction exits (install) (type 1) (506-7020) | SY | 1,523 | $30.00 | $20.00 | $20.35 | $19.00 | $18.74 | $22.00 | $20.95 |
| 62 | Construction exits (remove) (506-7024) | SY | 1,523 | $10.00 | $6.00 | $5.35 | $5.00 | $4.03 | $1.00 | $5.21 |
| 63 | Temporary sediment control fence (install) (506-7039) | LF | 2,104 | $4.00 | $3.50 | $3.80 | $5.00 | $2.77 | $24.00 | $4.01 |
| 64 | Temporary sediment control fence (remove) (506-7041) | LF | 2,104 | $1.00 | $0.25 | $0.25 | $1.00 | $1.02 | $1.00 | $1.02 |
| 65 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 570 | $5.00 | $6.00 | $5.65 | $6.00 | $5.03 | $12.00 | $4.76 |
| 66 | Biodegradable erosion control logs (remove) (506-7046) | LF | 570 | $1.50 | $1.00 | $0.85 | $1.00 | $1.03 | $1.00 | $1.21 |
| 67 | Constructing detours (508-7001) | SY | 5,812 | $90.00 | $115.00 | $113.00 | $76.00 | $74.21 | $86.00 | $100.00 |
| 68 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 3,300 | $35.00 | $30.00 | $46.25 | $35.00 | $74.26 | $70.00 | $36.54 |
| 69 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 520 | $50.00 | $40.00 | $17.40 | $50.00 | $74.26 | $66.00 | $36.48 |
| 70 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 7,180 | $12.00 | $15.00 | $9.60 | $15.00 | $12.22 | $12.00 | $13.90 |
| 71 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 840 | $20.00 | $15.00 | $9.60 | $20.00 | $14.99 | $45.00 | $18.18 |
| 72 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 2,980 | $12.00 | $15.00 | $17.40 | $22.00 | $3.62 | $22.00 | $14.29 |
| 73 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 400 | $20.00 | $15.00 | $17.40 | $19.00 | $3.63 | $45.00 | $11.66 |
| 74 | Colored textured concrete (5") (527-7002) | SY | 8,043 | $125.00 | $80.00 | $85.00 | $120.00 | $134.27 | $76.52 | $111.50 |
| 75 | Concrete curb (type I) (529-7001) | LF | 14,304 | $30.00 | $15.00 | $18.10 | $20.00 | $23.13 | $18.00 | $17.10 |
| 76 | Concrete curb (type II) (529-7002) | LF | 1,010 | $30.00 | $20.00 | $51.50 | $25.00 | $15.17 | $20.00 | $11.88 |
| 77 | Concrete curb (type F3) (529-7022) | LF | 100 | $250.00 | $300.00 | $530.00 | $200.00 | $184.24 | $24.00 | $481.29 |
| 78 | Driveways (concrete) (530-7006) | SY | 300 | $100.00 | $65.00 | $110.00 | $150.00 | $182.15 | $85.00 | $756.30 |
| 79 | Driveways (concrete) (hes) (530-7007) | SY | 942 | $140.00 | $110.00 | $110.00 | $130.00 | $169.95 | $85.00 | $168.50 |
| 80 | Concrete sidewalks (4") (531-7001) | SY | 5,435 | $75.00 | $50.00 | $59.10 | $113.00 | $82.67 | $65.00 | $70.45 |
| 81 | Curb ramps (type 1) (531-7005) | EACH | 5 | $3,000.00 | $2,000.00 | $2,520.00 | $3,000.00 | $2,347.24 | $5,000.00 | $4,194.10 |
| 82 | Curb ramps (type 2) (531-7006) | EACH | 15 | $3,500.00 | $2,000.00 | $2,740.00 | $3,000.00 | $2,874.01 | $5,000.00 | $5,409.71 |
| 83 | Curb ramps (type 20) (531-7012) | EACH | 7 | $4,500.00 | $2,000.00 | $5,300.00 | $3,500.00 | $2,974.01 | $5,000.00 | $7,453.46 |
| 84 | Remove RD IL asm (trans-base) (610-7009) | EACH | 13 | $800.00 | $310.00 | $330.00 | $1,000.00 | $1,349.05 | $800.00 | $749.90 |
| 85 | In RD IL (type SA) 50T-8 (400W EQ) LED (610-7196) | EACH | 43 | $5,000.00 | $4,800.00 | $5,100.00 | $4,300.00 | $6,132.07 | $9,690.19 | $4,566.67 |
| 86 | In RD IL (type SA) 50T-8-8 (400W EQ) LED (610-7197) | EACH | 1 | $6,000.00 | $6,100.00 | $6,500.00 | $7,000.00 | $8,584.89 | $10,100 | $5,985.71 |
| 87 | Temporary RD IL setup and remove (617-7001) | EACH | 20 | $8,500.00 | $2,900.00 | $3,100.00 | $6,500.00 | $10,302 | $5,139.00 | $9,122.22 |
| 88 | Temporary RD IL maintain system (617-7002) | MO | 18 | $600.00 | $450.00 | $480.00 | $2,000.00 | $3,066.03 | $4,160.00 | $1,153.34 |
| 89 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 8,805 | $11.00 | $9.55 | $10.20 | $6.00 | $7.97 | $16.63 | $12.23 |
| 90 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 2,749 | $25.00 | $0.01 | $0.01 | $0.01 | $24.00 | $18.88 | $17.50 |
| 91 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 2,219 | $30.00 | $28.00 | $29.95 | $41.00 | $53.96 | $24.27 | $25.49 |
| 92 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,958 | $30.00 | $0.01 | $0.01 | $0.01 | $35.64 | $28.32 | $34.72 |
| 93 | Electrical conductor (no.8) bare (620-7007) | LF | 10,282 | $2.00 | $1.85 | $2.00 | $1.00 | $1.23 | $2.51 | $1.77 |
| 94 | Electrical conductor (no.8) insulated (620-7008) | LF | 21,444 | $2.50 | $1.85 | $2.00 | $1.50 | $1.96 | $2.61 | $1.89 |
| 95 | Electrical conductor (no.6) bare (620-7009) | LF | 521 | $2.50 | $2.30 | $2.45 | $1.75 | $1.84 | $2.83 | $2.23 |
| 96 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,042 | $3.00 | $2.30 | $2.45 | $2.00 | $2.45 | $2.88 | $2.38 |
| 97 | Ground box type A (122311)W/apron (624-7002) | EACH | 41 | $1,700.00 | $1,250.00 | $1,340.00 | $600.00 | $901.41 | $1,753.29 | $1,281.87 |
| 98 | Remove ground box (624-7013) | EACH | 10 | $400.00 | $74.00 | $79.10 | $300.00 | $386.32 | $554.00 | $436.06 |
| 99 | Remove electrical services (628-7002) | EACH | 2 | $2,500.00 | $380.00 | $410.00 | $300.00 | $367.93 | $758.00 | $550.15 |
| 100 | Elc SRV type A 240/480 060(NS)SS(T)TP(O) (628-7053) | EACH | 3 | $10,800 | $7,000.00 | $7,500.00 | $9,000.00 | $11,651 | $9,020.00 | $8,277.00 |
| 101 | Aluminum signs (type O) (636-7003) | SF | 821 | $35.00 | $29.00 | $31.00 | $80.00 | $120.19 | $25.00 | $38.16 |
| 102 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 68 | $700.00 | $710.71 | $730.00 | $750.00 | $550.87 | $910.71 | $717.85 |
| 103 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 8 | $850.00 | $777.52 | $800.00 | $750.00 | $600.87 | $1,500.00 | $844.58 |
| 104 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 13 | $800.00 | $826.05 | $850.00 | $750.00 | $600.24 | $1,500.00 | $734.75 |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 2 | $900.00 | $862.51 | $880.00 | $750.00 | $755.68 | $1,500.00 | $948.56 |
| 106 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $1,000.00 | $1,083.91 | $1,110.00 | $750.00 | $654.74 | $1,500.00 | $968.43 |
| 107 | Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017) | EACH | 4 | $1,350.00 | $2,360.89 | $2,420.00 | $750.00 | $849.85 | $1,500.00 | $1,446.67 |
| 108 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,250.00 | $1,049.28 | $1,070.00 | $750.00 | $915.78 | $1,500.00 | $1,291.26 |
| 109 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 1 | $1,300.00 | $1,154.21 | $1,180.00 | $750.00 | $1,007.88 | $1,500.00 | $975.77 |
| 110 | Install overhead sign support(70 FT BRDG) (650-7079) | EACH | 2 | $125,000 | $75,500 | $80,692 | $75,000 | $118,962 | $32,000 | $45,610 |
| 111 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 1,653 | $1.00 | $0.54 | $0.45 | $0.95 | $0.50 | $0.40 | $1.20 |
| 112 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 30,782 | $0.30 | $0.30 | $0.45 | $0.95 | $0.44 | $0.40 | $0.41 |
| 113 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 161 | $50.00 | $16.32 | $26.85 | $75.00 | $51.24 | $25.00 | $10.00 |
| 114 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 31,842 | $0.35 | $0.30 | $0.45 | $0.95 | $0.46 | $0.40 | $0.47 |
| 115 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 726 | $6.00 | $4.35 | $9.15 | $10.00 | $4.24 | $8.50 | $6.95 |
| 116 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 509 | $1.00 | $3.26 | $9.00 | $3.00 | $1.03 | $0.82 | $1.78 |
| 117 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 131 | $1.00 | $3.26 | $9.00 | $3.00 | $1.04 | $1.53 | $1.78 |
| 118 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 416 | $1.50 | $1.09 | $1.05 | $0.95 | $0.61 | $1.00 | $1.35 |
| 119 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,011 | $1.00 | $0.97 | $1.05 | $1.25 | $2.00 | $1.00 | $1.11 |
| 120 | Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027) | LF | 565 | $1.00 | $2.18 | $3.20 | $2.00 | $4.35 | $3.00 | $3.47 |
| 121 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,164 | $7.00 | $7.37 | $7.50 | $10.00 | $10.14 | $7.00 | $8.21 |
| 122 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 605 | $2.00 | $1.09 | $1.05 | $1.25 | $2.03 | $1.00 | $1.25 |
| 123 | Reflectorized pavement marking type I (W)6"(broken)(090MIL)(callout) (666-7144) | LF | 720 | $2.00 | $1.09 | $1.05 | $0.95 | $1.01 | $1.00 | $1.23 |
| 124 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 11,844 | $1.00 | $0.82 | $0.70 | $3.00 | $0.76 | $1.00 | $1.01 |
| 125 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 7,724 | $1.00 | $0.82 | $0.70 | $3.00 | $0.76 | $1.00 | $0.88 |
| 126 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 21 | $250.00 | $217.62 | $380.00 | $750.00 | $200.03 | $350.00 | $216.69 |
| 127 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 23 | $450.00 | $380.83 | $380.00 | $850.00 | $354.77 | $350.00 | $342.50 |
| 128 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 4 | $300.00 | $304.66 | $320.00 | $750.00 | $308.00 | $300.00 | $241.16 |
| 129 | Prefabricated PM type C (W)(symbol) (668-7109) | EACH | 22 | $300.00 | $326.43 | $215.00 | $750.00 | $245.87 | $200.00 | $200.00 |
| 130 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 84 | $40.00 | $43.52 | $37.60 | $95.00 | $61.74 | $35.00 | $37.40 |
| 131 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,043 | $1.00 | $1.09 | $1.05 | $3.00 | $1.22 | $1.00 | $1.19 |
| 132 | Eliminating existing PM & markers (24") (callout) (677-7039) | LF | 93 | $5.00 | $3.26 | $6.45 | $10.00 | $5.55 | $6.00 | $2.20 |
| 133 | Strip mowing (730-7020) | ACRE | 3 | $40.00 | $3,500.00 | $2,860.00 | $3,500.00 | $204.00 | $13,067 | $350.00 |
| 134 | Litter removal (734-7002) | CYC | 22 | $3,000.00 | $2,500.00 | $1,250.00 | $750.00 | $400.87 | $1,654.55 | $1,218.65 |
| 135 | Debris removal (CNTR medians/mainlanes) (735-7014) | CYC | 22 | $2,000.00 | $2,500.00 | $420.00 | $1,500.00 | $500.85 | $1,654.55 | $5,051.19 |
| 136 | Debris removal (spot debris) (735-7072) | MI | 2 | $3,000.00 | $2,500.00 | $910.00 | $1,500.00 | $767.87 | $3,700.00 | $2,891.19 |
| 137 | Cleaning / sweeping (center median) (738-7004) | CYC | 22 | $1,000.00 | $2,000.00 | $700.00 | $1,500.00 | $504.87 | $3,000.00 | $999.36 |
| 138 | Cleaning / sweeping (outside main lane) (738-7028) | CYC | 22 | $2,500.00 | $2,000.00 | $350.00 | $1,000.00 | $504.87 | $3,500.00 | $999.36 |
| 139 | Cleaning / sweeping (frontage road) (738-7050) | CYC | 22 | $2,500.00 | $2,000.00 | $350.00 | $500.00 | $554.25 | $4,000.00 | $999.36 |
| 140 | Bonding course (3007-7001) | GAL | 3,955 | $3.00 | $0.01 | $0.01 | $5.00 | $5.00 | $18.00 | $5.00 |
| 141 | Comm cable (undrgrnd)(19 AWG)(6 pair) (6005-7004) | LF | 254 | $2.00 | $7.00 | $7.50 | $4.00 | $4.91 | $12.00 | $1.41 |
| 142 | SDR26 PVC C900 WWL aband inc grout 8" (7101-7001) | LF | 345 | $37.00 | $12.00 | $28.75 | $3.34 | $80.00 | $44.00 | $32.00 |
| 143 | SDR26 PVC C900 WWL aband inc grout 12" (7101-7002) | LF | 163 | $50.00 | $25.00 | $61.25 | $7.52 | $100.00 | $37.87 | $45.00 |
| 144 | SDR26 PVC C900 removing exc & BKFL 6" (7101-7003) | LF | 166 | $31.00 | $25.00 | $61.40 | $25.00 | $95.00 | $12.00 | $32.00 |
| 145 | SDR26 PVC C900 WWL open cut 8" (7101-7004) | LF | 85 | $175.00 | $80.00 | $224.00 | $170.00 | $190.00 | $96.49 | $98.00 |
| 146 | SDR26 PVC C900 8" in 18" steel cas O cut (7101-7005) | LF | 50 | $370.00 | $320.00 | $380.00 | $350.00 | $320.00 | $244.89 | $330.00 |
| 147 | SDR26 PVC C900 WWL 8" in 18" steel cas JB (7101-7006) | LF | 225 | $1,100.00 | $500.00 | $730.00 | $790.00 | $600.00 | $379.69 | $350.00 |
| 148 | SDR26 PVC C900 WWL open cut 12" (7101-7007) | LF | 362 | $216.00 | $125.00 | $210.00 | $175.00 | $225.00 | $247.03 | $100.00 |
| 149 | Manhole abandonment (7101-7008) | EACH | 3 | $5,600.00 | $18.00 | $4,990.00 | $3,000.00 | $3,000.00 | $8,000.00 | $2,500.00 |
| 150 | SS manhole 6' depth 4' diameter (7101-7009) | EACH | 6 | $12,500 | $12,000 | $10,000 | $26,000 | $11,000 | $14,478 | $10,000 |
| 151 | Extra depth SS manhole>6'depth 4' diameter (7101-7010) | EACH | 50 | $750.00 | $500.00 | $450.00 | $150.00 | $850.00 | $2,666.70 | $2,000.00 |
| 152 | SS drop manhole 6' depth 4' diameter (7101-7011) | EACH | 2 | $15,000 | $15,000 | $16,800 | $21,000 | $16,000 | $25,871 | $10,000 |
| 153 | Manhole removal (7101-7012) | EACH | 2 | $4,300.00 | $3,000.00 | $4,030.00 | $2,000.00 | $3,800.00 | $4,000.00 | $2,500.00 |
| 154 | Sewer bypass pumping (7101-7013) | LS | 1 | $61,740 | $75,000 | $55,897 | $30,000 | $75,000 | $125,000 | $500,000 |
| 155 | PVC WL install open cut 8 in (7103-7001) | LF | 509 | $160.52 | $85.00 | $178.00 | $200.00 | $160.00 | $248.48 | $100.00 |
| 156 | Pve WL install open cut 16 in (7103-7002) | LF | 549 | $445.00 | $145.00 | $226.00 | $270.00 | $300.00 | $319.97 | $120.00 |
| 157 | Steel cas install open cut 30 in min (7103-7003) | LF | 70 | $581.00 | $450.00 | $480.00 | $720.00 | $800.00 | $522.77 | $550.00 |
| 158 | DI WL removing inc exc & BKFL 6 in (7103-7004) | LF | 403 | $15.00 | $25.00 | $61.35 | $22.00 | $80.00 | $44.00 | $25.00 |
| 159 | DI WL aband inc grout 6 in (7103-7005) | LF | 200 | $31.00 | $12.00 | $46.70 | $4.00 | $60.00 | $50.00 | $40.00 |
| 160 | PVC WL removing inc exc & BKFL 8 in (7103-7006) | LF | 265 | $30.87 | $22.00 | $61.35 | $25.00 | $90.00 | $50.00 | $30.00 |
| 161 | Gate valve assembly 6 in (7103-7007) | EACH | 2 | $3,710.00 | $2,800.00 | $3,070.00 | $3,500.00 | $4,500.00 | $2,557.65 | $3,000.00 |
| 162 | Gate valve assembly 8 in (7103-7008) | EACH | 5 | $4,325.00 | $3,200.00 | $3,730.00 | $4,200.00 | $5,800.00 | $3,148.94 | $3,500.00 |
| 163 | Gate valve assembly 16 in (7103-7009) | EACH | 3 | $15,435 | $10,500 | $9,900.00 | $14,000 | $18,000 | $15,503 | $5,500.00 |
| 164 | PVC WL aband inc grout 8 in (7103-7010) | LF | 358 | $37.04 | $12.00 | $30.15 | $4.00 | $60.00 | $50.00 | $42.00 |
| 165 | PVC WL 8" within 18" steel cas open cut (7103-7011) | LF | 114 | $444.53 | $300.00 | $250.00 | $300.00 | $350.00 | $396.57 | $400.00 |
| 166 | PVC WL 8" within 18" steel cas jack bore (7103-7012) | LF | 107 | $1,115.00 | $620.00 | $920.00 | $800.00 | $600.00 | $396.31 | $500.00 |
| 167 | Fire hydrant assembly (7103-7013) | EACH | 2 | $11,115 | $8,000.00 | $9,100.00 | $11,000 | $11,500 | $13,645 | $5,500.00 |
| 168 | Remove fire hydrant assembly (7103-7014) | EACH | 1 | $2,100.00 | $2,000.00 | $3,280.00 | $1,000.00 | $3,000.00 | $1,200.00 | $1,500.00 |
| 169 | Tie into existing WL (7103-7015) | EACH | 6 | $6,174.00 | $6,000.00 | $6,200.00 | $7,500.00 | $8,000.00 | $9,196.08 | $7,500.00 |
| 170 | Air release valve 2 in (7103-7016) | EACH | 2 | $9,880.00 | $9,500.00 | $8,600.00 | $8,500.00 | $7,000.00 | $6,192.38 | $3,500.00 |
| 171 | Temporary water service (7103-7017) | EACH | 1 | $12,350 | $7,000.00 | $25,700 | $4,000.00 | $25,000 | $6,794.91 | $5,000.00 |
| 172 | WL fittings and accessories (7103-7018) | TON | 3.12 | $11,113 | $10,000 | $2,820.00 | $1.00 | $13,000 | $12,879 | $15,000 |
| 173 | Hydrostatic testing (7103-7019) | EACH | 4 | $1,300.00 | $4,500.00 | $7,200.00 | $3,000.00 | $4,000.00 | $5,200.00 | $1,750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way