TxDOT contract A00193362 bid tabulation

Hazard Elimination & Safety, IH 35 (SBFR IH 35 at Loma Vista to SBFR IH 35 at Peach Ave). Let by Texas DOT on July 1, 2026, Comal, San Antonio District. 7 bids received; low bid $12,034,296 by J3 Company, LLC, -17% against the engineer's estimate of $14,509,412.

Owner
Texas DOT
Letting
01 JUL 2026
Pay items
173
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J3 Company, LLC$12,034,296Low-17%
2Capital Excavation Company$13,440,747+12%-7.0%
3E-Z Bel Construction, LLC$14,464,111+20%0.0%
4STX Civil$14,479,933+20%0.0%
5Go Underground, Limited Liability Company$14,861,824+23%+2.0%
6Hunter Industries, LTD.$14,906,103+24%+3.0%
7Copasa Inc$15,689,186+30%+8.0%
TxDOT contract A00193362: bids by rank

Engineer's estimate: $14,509,412.

Bid tabulation

LinePay itemUnitQuantityEstimate1. J3 Company, LLC2. Capital Excavation Company3. E-Z Bel Construction, LLC4. STX Civil5. Go Underground, Limited Liability Company6. Hunter Industries, LTD.
1Preparing row (100-7002)STA45$21,050$8,000.00$10,000$16,000$429.24$5,200.00$1,500.00
2Excavation (roadway) (110-7001)CY30,577$18.00$32.00$25.50$20.00$18.77$18.00$35.00
3Embankment (final)(OC)(type C) (132-7005)CY4,699$22.00$40.00$51.00$37.00$37.34$24.00$25.00
4Embankment (final)(DC)(type C) (132-7006)CY17$25.00$80.00$320.00$16.00$52.65$24.00$45.00
5Furn & place topsoil (6") (160-7004)SY13,563$8.00$3.00$1.95$2.00$4.03$5.36$5.00
6Roll sodding (162-7008)SY2,339$8.00$8.00$6.45$6.00$7.30$12.00$6.50
7Broadcast seed (temporary_warm_cool) (164-7007)SY13,563$0.25$0.25$0.20$0.18$0.22$12.00$0.24
8Fertilizer (166-7001)ACRE3$600.00$500.00$540.00$500.00$613.21$1,200.00$1,921.26
9Vegetative watering (168-7001)TGL2,203$20.00$25.00$36.30$43.00$42.92$12.00$50.00
10Soil ret BLKT(SL_mod_clay_short) (169-7001)SY96$2.00$3.00$3.25$3.00$3.68$22.00$3.83
11Soil ret BLKT(SL_steep_clay_short) (169-7005)SY225$2.00$4.00$4.35$4.00$4.91$22.00$2.76
12Proof rolling (216-7001)HR14$180.00$150.00$89.95$152.00$194.45$220.00$85.25
13FL BS (compacted in place)(type A GR 1-2) (247-7001)TON578$55.00$35.00$71.25$64.00$58.41$104.00$42.00
14FL BS (compacted in place)(type D GR 1-2) (247-7013)TON14,633$40.00$35.00$36.00$45.00$58.41$42.00$42.00
15FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188)CY157$65.00$70.00$160.00$130.00$58.41$56.00$82.00
16Lime (com or QK)(slurry) or QK(dry) (260-7001)TON533$400.00$310.00$310.00$330.00$364.24$300.00$350.00
17Lime TRT (existing material)(6") (260-7006)SY35,876$5.00$6.50$12.60$8.00$7.52$6.00$6.00
18CM TRT(PT MX)(CL L)(tya)(GR1-2)(in vehicle) (276-7001)CY840$173.00$150.00$205.00$18.00$184.13$50.00$125.00
19Tack coat (292-7017)GAL8,239$6.00$5.00$3.15$4.00$3.68$18.00$4.50
20Prime coat(MC-30 or AE-P) (310-7013)GAL6,592$5.00$6.00$5.00$4.00$5.83$18.00$6.50
21D-GR HMA type-B PG64-22 (341-7001)TON15,391$100.00$88.00$87.65$80.00$102.10$140.88$100.00
22SP mixes SP-C sac-B PG76-22 (344-7031)TON3,256$95.00$110.00$113.00$131.00$131.23$140.88$110.00
23Flexible pavement structure repair(2") (351-7001)SY716$40.00$30.00$52.30$30.00$34.32$80.00$20.00
24Planing asphalt concrete pavement(0" to 2") (354-7032)SY958$2.00$10.00$3.70$7.50$4.29$8.00$3.25
25Concrete pavement (joint reinforced) (10") (360-7094)SY2,069$100.00$110.00$161.00$160.00$147.99$212.56$125.00
26Full - depth repair CRCP (6") (361-7001)CY62$38.00$650.00$650.00$450.00$341.38$1,200.00$2,000.00
27Cut & restoring pavement (400-7006)SY249$200.00$200.00$480.00$200.00$331.19$90.00$771.83
28Flowable backfill (401-7001)CY528$350.00$180.00$215.00$230.00$218.88$180.00$178.79
29Trench excavation protection (402-7001)LF6,151$8.00$5.00$7.30$1.00$8.25$4.00$18.89
30Drilled shaft (42 in) (416-7007)LF80$350.00$400.00$430.00$460.00$588.68$1,200.00$578.15
31Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF352$300.00$260.00$280.00$340.00$429.24$396.80$245.35
32Slab span (422-7017)CY4$1,200.00$2,000.00$2,870.00$1,600.00$2,034.87$1,400.00$3,905.63
33Retaining wall (spread footing) (423-7015)SF280$120.00$85.00$124.00$140.00$90.74$120.00$202.48
34Riprap (concrete)(4 in) (432-7001)CY1$700.00$2,000.00$1,410.00$600.00$1,000.03$1,000.00$1,050.06
35Rail (handrail)(type C) (450-7060)LF100$200.00$180.00$166.00$225.00$275.94$220.00$146.07
36Rail (handrail)(type F) (450-7063)LF51$225.00$240.00$193.00$250.00$306.60$289.80$129.87
37RC pipe (CL III)(24 in) (464-7005)LF2,055$120.00$130.00$172.00$220.00$110.26$117.09$236.63
38RC pipe (CL III)(30 in) (464-7007)LF1,486$140.00$160.00$204.00$300.00$146.60$147.55$264.73
39RC pipe (CL III)(36 in) (464-7009)LF338$190.00$220.00$250.00$370.00$191.43$191.05$383.39
40Manh (complete)(PRM)(48IN) (465-7002)EACH1$8,000.00$8,800.00$8,300.00$10,000$11,992$13,000$12,175
41Manh (complete)(PRM)(60IN) (465-7003)EACH5$10,000$9,400.00$13,500$22,000$14,819$17,000$14,106
42Manh (complete)(PRM)(72IN) (465-7004)EACH3$13,000$11,000$16,900$33,000$24,311$24,000$15,979
43Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH1$6,500.00$7,800.00$12,100$25,000$9,447.08$11,804$11,147
44Junction box(complete)(PJB)(4FTX4FT) (465-7006)EACH4$8,000.00$6,500.00$11,500$25,000$11,342$12,572$12,389
45Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH3$11,000$8,900.00$9,700.00$25,000$12,051$13,336$14,190
46Inlet (complete)(pco)(5FT)(left) (465-7022)EACH15$8,000.00$10,500$11,800$23,000$17,137$17,170$15,040
47Inlet (complete)(pco)(5FT)(right) (465-7023)EACH12$10,000$10,500$11,700$23,000$17,241$7,575.92$15,040
48Inlet (complete)(pco)(6FT)(left) (465-7026)EACH3$8,000.00$11,500$15,700$24,000$19,102$18,193$16,269
49Inlet (complete)(pcu)(6FT)(both) (465-7044)EACH1$9,000.00$12,500$15,200$26,000$19,691$18,691$19,024
50Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160)EACH4$8,000.00$9,500.00$8,200.00$20,000$11,722$12,572$11,920
51Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162)EACH3$10,500$10,100$7,900.00$17,000$13,033$13,037$13,637
52Junct box (complete)(JB)(7FT X 5FT)(FTW) (465-7293)EACH3$16,000$16,500$14,300$40,000$21,480$20,500$15,925
53Adjusting manholes (479-7001)EACH3$2,000.00$3,500.00$2,050.00$3,000.00$1,121.37$6,500.00$2,627.48
54Removing structure (inlet) (496-7002)EACH22$1,250.00$1,500.00$1,960.00$1,000.00$1,445.06$400.00$1,577.04
55Removing structure (manhole) (496-7003)EACH3$1,550.00$3,500.00$1,940.00$1,000.00$1,444.93$400.00$2,102.72
56Removing structure (pipe) (496-7007)LF543$20.00$25.00$23.05$60.00$25.69$8.00$34.18
57Mobilization (500-7001)LS1$1,300,000$890,000$1,155,000$900,000$1,316,358$1,001,451$1,350,000
58Mobilization (callout) (500-7002)EACH2$20,000$10,000$16,900$45,000$16,875$20,000$5,000.00
59Barricades, signs and traffic handling (502-7001)MO22$12,000$12,000$11,000$3,000.00$10,874$6,500.00$3,236.43
60Portable changeable message sign (503-7001)DAY1,440$90.00$30.00$35.55$100.00$21.25$200.00$125.00
61Construction exits (install) (type 1) (506-7020)SY1,523$30.00$20.00$20.35$19.00$18.74$22.00$20.95
62Construction exits (remove) (506-7024)SY1,523$10.00$6.00$5.35$5.00$4.03$1.00$5.21
63Temporary sediment control fence (install) (506-7039)LF2,104$4.00$3.50$3.80$5.00$2.77$24.00$4.01
64Temporary sediment control fence (remove) (506-7041)LF2,104$1.00$0.25$0.25$1.00$1.02$1.00$1.02
65Biodegradable erosion control logs (install) (8") (506-7043)LF570$5.00$6.00$5.65$6.00$5.03$12.00$4.76
66Biodegradable erosion control logs (remove) (506-7046)LF570$1.50$1.00$0.85$1.00$1.03$1.00$1.21
67Constructing detours (508-7001)SY5,812$90.00$115.00$113.00$76.00$74.21$86.00$100.00
68Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF3,300$35.00$30.00$46.25$35.00$74.26$70.00$36.54
69Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF520$50.00$40.00$17.40$50.00$74.26$66.00$36.48
70Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF7,180$12.00$15.00$9.60$15.00$12.22$12.00$13.90
71Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF840$20.00$15.00$9.60$20.00$14.99$45.00$18.18
72Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF2,980$12.00$15.00$17.40$22.00$3.62$22.00$14.29
73Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF400$20.00$15.00$17.40$19.00$3.63$45.00$11.66
74Colored textured concrete (5") (527-7002)SY8,043$125.00$80.00$85.00$120.00$134.27$76.52$111.50
75Concrete curb (type I) (529-7001)LF14,304$30.00$15.00$18.10$20.00$23.13$18.00$17.10
76Concrete curb (type II) (529-7002)LF1,010$30.00$20.00$51.50$25.00$15.17$20.00$11.88
77Concrete curb (type F3) (529-7022)LF100$250.00$300.00$530.00$200.00$184.24$24.00$481.29
78Driveways (concrete) (530-7006)SY300$100.00$65.00$110.00$150.00$182.15$85.00$756.30
79Driveways (concrete) (hes) (530-7007)SY942$140.00$110.00$110.00$130.00$169.95$85.00$168.50
80Concrete sidewalks (4") (531-7001)SY5,435$75.00$50.00$59.10$113.00$82.67$65.00$70.45
81Curb ramps (type 1) (531-7005)EACH5$3,000.00$2,000.00$2,520.00$3,000.00$2,347.24$5,000.00$4,194.10
82Curb ramps (type 2) (531-7006)EACH15$3,500.00$2,000.00$2,740.00$3,000.00$2,874.01$5,000.00$5,409.71
83Curb ramps (type 20) (531-7012)EACH7$4,500.00$2,000.00$5,300.00$3,500.00$2,974.01$5,000.00$7,453.46
84Remove RD IL asm (trans-base) (610-7009)EACH13$800.00$310.00$330.00$1,000.00$1,349.05$800.00$749.90
85In RD IL (type SA) 50T-8 (400W EQ) LED (610-7196)EACH43$5,000.00$4,800.00$5,100.00$4,300.00$6,132.07$9,690.19$4,566.67
86In RD IL (type SA) 50T-8-8 (400W EQ) LED (610-7197)EACH1$6,000.00$6,100.00$6,500.00$7,000.00$8,584.89$10,100$5,985.71
87Temporary RD IL setup and remove (617-7001)EACH20$8,500.00$2,900.00$3,100.00$6,500.00$10,302$5,139.00$9,122.22
88Temporary RD IL maintain system (617-7002)MO18$600.00$450.00$480.00$2,000.00$3,066.03$4,160.00$1,153.34
89Conduit (PVC) (schedule 40) (2") (618-7030)LF8,805$11.00$9.55$10.20$6.00$7.97$16.63$12.23
90Conduit (PVC) (schedule 40) (3") (618-7036)LF2,749$25.00$0.01$0.01$0.01$24.00$18.88$17.50
91Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF2,219$30.00$28.00$29.95$41.00$53.96$24.27$25.49
92Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF1,958$30.00$0.01$0.01$0.01$35.64$28.32$34.72
93Electrical conductor (no.8) bare (620-7007)LF10,282$2.00$1.85$2.00$1.00$1.23$2.51$1.77
94Electrical conductor (no.8) insulated (620-7008)LF21,444$2.50$1.85$2.00$1.50$1.96$2.61$1.89
95Electrical conductor (no.6) bare (620-7009)LF521$2.50$2.30$2.45$1.75$1.84$2.83$2.23
96Electrical conductor (no.6) insulated (620-7010)LF1,042$3.00$2.30$2.45$2.00$2.45$2.88$2.38
97Ground box type A (122311)W/apron (624-7002)EACH41$1,700.00$1,250.00$1,340.00$600.00$901.41$1,753.29$1,281.87
98Remove ground box (624-7013)EACH10$400.00$74.00$79.10$300.00$386.32$554.00$436.06
99Remove electrical services (628-7002)EACH2$2,500.00$380.00$410.00$300.00$367.93$758.00$550.15
100Elc SRV type A 240/480 060(NS)SS(T)TP(O) (628-7053)EACH3$10,800$7,000.00$7,500.00$9,000.00$11,651$9,020.00$8,277.00
101Aluminum signs (type O) (636-7003)SF821$35.00$29.00$31.00$80.00$120.19$25.00$38.16
102Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH68$700.00$710.71$730.00$750.00$550.87$910.71$717.85
103Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH8$850.00$777.52$800.00$750.00$600.87$1,500.00$844.58
104Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH13$800.00$826.05$850.00$750.00$600.24$1,500.00$734.75
105Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH2$900.00$862.51$880.00$750.00$755.68$1,500.00$948.56
106Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH6$1,000.00$1,083.91$1,110.00$750.00$654.74$1,500.00$968.43
107Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017)EACH4$1,350.00$2,360.89$2,420.00$750.00$849.85$1,500.00$1,446.67
108Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,250.00$1,049.28$1,070.00$750.00$915.78$1,500.00$1,291.26
109Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032)EACH1$1,300.00$1,154.21$1,180.00$750.00$1,007.88$1,500.00$975.77
110Install overhead sign support(70 FT BRDG) (650-7079)EACH2$125,000$75,500$80,692$75,000$118,962$32,000$45,610
111Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF1,653$1.00$0.54$0.45$0.95$0.50$0.40$1.20
112Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF30,782$0.30$0.30$0.45$0.95$0.44$0.40$0.41
113Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH161$50.00$16.32$26.85$75.00$51.24$25.00$10.00
114Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF31,842$0.35$0.30$0.45$0.95$0.46$0.40$0.47
115Work zone pavement marking removing (W)24"(solid) (662-7077)LF726$6.00$4.35$9.15$10.00$4.24$8.50$6.95
116Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH509$1.00$3.26$9.00$3.00$1.03$0.82$1.78
117Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH131$1.00$3.26$9.00$3.00$1.04$1.53$1.78
118Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF416$1.50$1.09$1.05$0.95$0.61$1.00$1.35
119Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF2,011$1.00$0.97$1.05$1.25$2.00$1.00$1.11
120Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF565$1.00$2.18$3.20$2.00$4.35$3.00$3.47
121Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,164$7.00$7.37$7.50$10.00$10.14$7.00$8.21
122Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF605$2.00$1.09$1.05$1.25$2.03$1.00$1.25
123Reflectorized pavement marking type I (W)6"(broken)(090MIL)(callout) (666-7144)LF720$2.00$1.09$1.05$0.95$1.01$1.00$1.23
124Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF11,844$1.00$0.82$0.70$3.00$0.76$1.00$1.01
125Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF7,724$1.00$0.82$0.70$3.00$0.76$1.00$0.88
126Prefabricated PM type C (W)(arrow) (668-7091)EACH21$250.00$217.62$380.00$750.00$200.03$350.00$216.69
127Prefabricated PM type C (W)(double arrow) (668-7093)EACH23$450.00$380.83$380.00$850.00$354.77$350.00$342.50
128Prefabricated PM type C (W)(word) (668-7103)EACH4$300.00$304.66$320.00$750.00$308.00$300.00$241.16
129Prefabricated PM type C (W)(symbol) (668-7109)EACH22$300.00$326.43$215.00$750.00$245.87$200.00$200.00
130Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH84$40.00$43.52$37.60$95.00$61.74$35.00$37.40
131Eliminating existing PM & markers (6") (677-7002)LF3,043$1.00$1.09$1.05$3.00$1.22$1.00$1.19
132Eliminating existing PM & markers (24") (callout) (677-7039)LF93$5.00$3.26$6.45$10.00$5.55$6.00$2.20
133Strip mowing (730-7020)ACRE3$40.00$3,500.00$2,860.00$3,500.00$204.00$13,067$350.00
134Litter removal (734-7002)CYC22$3,000.00$2,500.00$1,250.00$750.00$400.87$1,654.55$1,218.65
135Debris removal (CNTR medians/mainlanes) (735-7014)CYC22$2,000.00$2,500.00$420.00$1,500.00$500.85$1,654.55$5,051.19
136Debris removal (spot debris) (735-7072)MI2$3,000.00$2,500.00$910.00$1,500.00$767.87$3,700.00$2,891.19
137Cleaning / sweeping (center median) (738-7004)CYC22$1,000.00$2,000.00$700.00$1,500.00$504.87$3,000.00$999.36
138Cleaning / sweeping (outside main lane) (738-7028)CYC22$2,500.00$2,000.00$350.00$1,000.00$504.87$3,500.00$999.36
139Cleaning / sweeping (frontage road) (738-7050)CYC22$2,500.00$2,000.00$350.00$500.00$554.25$4,000.00$999.36
140Bonding course (3007-7001)GAL3,955$3.00$0.01$0.01$5.00$5.00$18.00$5.00
141Comm cable (undrgrnd)(19 AWG)(6 pair) (6005-7004)LF254$2.00$7.00$7.50$4.00$4.91$12.00$1.41
142SDR26 PVC C900 WWL aband inc grout 8" (7101-7001)LF345$37.00$12.00$28.75$3.34$80.00$44.00$32.00
143SDR26 PVC C900 WWL aband inc grout 12" (7101-7002)LF163$50.00$25.00$61.25$7.52$100.00$37.87$45.00
144SDR26 PVC C900 removing exc & BKFL 6" (7101-7003)LF166$31.00$25.00$61.40$25.00$95.00$12.00$32.00
145SDR26 PVC C900 WWL open cut 8" (7101-7004)LF85$175.00$80.00$224.00$170.00$190.00$96.49$98.00
146SDR26 PVC C900 8" in 18" steel cas O cut (7101-7005)LF50$370.00$320.00$380.00$350.00$320.00$244.89$330.00
147SDR26 PVC C900 WWL 8" in 18" steel cas JB (7101-7006)LF225$1,100.00$500.00$730.00$790.00$600.00$379.69$350.00
148SDR26 PVC C900 WWL open cut 12" (7101-7007)LF362$216.00$125.00$210.00$175.00$225.00$247.03$100.00
149Manhole abandonment (7101-7008)EACH3$5,600.00$18.00$4,990.00$3,000.00$3,000.00$8,000.00$2,500.00
150SS manhole 6' depth 4' diameter (7101-7009)EACH6$12,500$12,000$10,000$26,000$11,000$14,478$10,000
151Extra depth SS manhole>6'depth 4' diameter (7101-7010)EACH50$750.00$500.00$450.00$150.00$850.00$2,666.70$2,000.00
152SS drop manhole 6' depth 4' diameter (7101-7011)EACH2$15,000$15,000$16,800$21,000$16,000$25,871$10,000
153Manhole removal (7101-7012)EACH2$4,300.00$3,000.00$4,030.00$2,000.00$3,800.00$4,000.00$2,500.00
154Sewer bypass pumping (7101-7013)LS1$61,740$75,000$55,897$30,000$75,000$125,000$500,000
155PVC WL install open cut 8 in (7103-7001)LF509$160.52$85.00$178.00$200.00$160.00$248.48$100.00
156Pve WL install open cut 16 in (7103-7002)LF549$445.00$145.00$226.00$270.00$300.00$319.97$120.00
157Steel cas install open cut 30 in min (7103-7003)LF70$581.00$450.00$480.00$720.00$800.00$522.77$550.00
158DI WL removing inc exc & BKFL 6 in (7103-7004)LF403$15.00$25.00$61.35$22.00$80.00$44.00$25.00
159DI WL aband inc grout 6 in (7103-7005)LF200$31.00$12.00$46.70$4.00$60.00$50.00$40.00
160PVC WL removing inc exc & BKFL 8 in (7103-7006)LF265$30.87$22.00$61.35$25.00$90.00$50.00$30.00
161Gate valve assembly 6 in (7103-7007)EACH2$3,710.00$2,800.00$3,070.00$3,500.00$4,500.00$2,557.65$3,000.00
162Gate valve assembly 8 in (7103-7008)EACH5$4,325.00$3,200.00$3,730.00$4,200.00$5,800.00$3,148.94$3,500.00
163Gate valve assembly 16 in (7103-7009)EACH3$15,435$10,500$9,900.00$14,000$18,000$15,503$5,500.00
164PVC WL aband inc grout 8 in (7103-7010)LF358$37.04$12.00$30.15$4.00$60.00$50.00$42.00
165PVC WL 8" within 18" steel cas open cut (7103-7011)LF114$444.53$300.00$250.00$300.00$350.00$396.57$400.00
166PVC WL 8" within 18" steel cas jack bore (7103-7012)LF107$1,115.00$620.00$920.00$800.00$600.00$396.31$500.00
167Fire hydrant assembly (7103-7013)EACH2$11,115$8,000.00$9,100.00$11,000$11,500$13,645$5,500.00
168Remove fire hydrant assembly (7103-7014)EACH1$2,100.00$2,000.00$3,280.00$1,000.00$3,000.00$1,200.00$1,500.00
169Tie into existing WL (7103-7015)EACH6$6,174.00$6,000.00$6,200.00$7,500.00$8,000.00$9,196.08$7,500.00
170Air release valve 2 in (7103-7016)EACH2$9,880.00$9,500.00$8,600.00$8,500.00$7,000.00$6,192.38$3,500.00
171Temporary water service (7103-7017)EACH1$12,350$7,000.00$25,700$4,000.00$25,000$6,794.91$5,000.00
172WL fittings and accessories (7103-7018)TON3.12$11,113$10,000$2,820.00$1.00$13,000$12,879$15,000
173Hydrostatic testing (7103-7019)EACH4$1,300.00$4,500.00$7,200.00$3,000.00$4,000.00$5,200.00$1,750.00
TxDOT contract A00193362: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way