TxDOT contract A00063966 bid tabulation
Highway Improvement, SH 95 (SL 230 to SOUTH OF FM 535). Let by Texas DOT on August 8, 2025, Bastrop, Austin District. 6 bids received; low bid $18,841,535 by C. E. Barker, LTD., +10% against the engineer's estimate of $17,087,050.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 411
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | C. E. Barker, LTD. | $18,841,535 | Low | +10% |
| 2 | Posillico Civil, Inc. | $19,958,427 | +6.0% | +17% |
| 3 | Texas Road LLC | $21,358,537 | +13% | +25% |
| 4 | Larry Young Paving, Inc. | $21,764,590 | +16% | +27% |
| 5 | Aaron Concrete Contractors, LLC | $22,747,071 | +21% | +33% |
| 6 | Copasa Inc | $24,123,724 | +28% | +41% |
Engineer's estimate: $17,087,050.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. C. E. Barker, LTD. | 2. Posillico Civil, Inc. | 3. Texas Road LLC | 4. Larry Young Paving, Inc. | 5. Aaron Concrete Contractors, LLC | 6. Copasa Inc |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 55.90 | $2,250.00 | $33,300 | $13,000 | $7,500.00 | $19,250 | $376.00 | $47,474 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 136 | $25.00 | $56.76 | $28.00 | $31.00 | $34.00 | $16.00 | $30.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 53 | $50.00 | $56.76 | $65.00 | $31.00 | $34.00 | $35.00 | $40.00 |
| 4 | Remove (12") TRT/untrt base & asphalt pavement (105-7032) | SY | 13,953 | $12.00 | $10.43 | $5.00 | $14.00 | $17.00 | $14.00 | $7.57 |
| 5 | Excavation (roadway) (110-7001) | CY | 12,228 | $20.00 | $28.11 | $10.00 | $31.00 | $27.00 | $30.00 | $18.06 |
| 6 | Embankment (final)(OC)(type B) (132-7003) | CY | 4,311 | $20.00 | $28.11 | $16.00 | $20.00 | $28.00 | $29.00 | $19.80 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 9,417 | $1.00 | $3.78 | $3.00 | $2.50 | $4.75 | $10.00 | $3.09 |
| 8 | Block sodding (162-7002) | SY | 9,381 | $5.00 | $11.40 | $6.00 | $7.00 | $6.00 | $12.00 | $4.65 |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 9,401 | $1.00 | $0.17 | $1.00 | $0.60 | $0.50 | $0.17 | $0.30 |
| 10 | Broadcast seed (temporary_cool) (164-7006) | SY | 9,401 | $1.00 | $0.21 | $1.00 | $0.60 | $0.25 | $0.22 | $0.28 |
| 11 | Drill seed (permanent_urban_sand) (164-7011) | SY | 9,417 | $0.20 | $0.28 | $1.00 | $0.60 | $0.50 | $0.27 | $0.32 |
| 12 | Vegetative watering (168-7001) | TGL | 315.60 | $10.00 | $56.76 | $34.00 | $40.00 | $41.00 | $68.00 | $35.00 |
| 13 | Soil ret BLKT(SL_mod_sand_long) (169-7004) | SY | 9,417 | $2.00 | $1.03 | $2.00 | $1.80 | $1.75 | $1.00 | $1.40 |
| 14 | Proof rolling (216-7001) | HR | 15 | $155.00 | $113.53 | $238.00 | $140.00 | $140.00 | $662.00 | $74.61 |
| 15 | FL BS (compacted in place)(type A GR 5)(final pos) (247-7179) | CY | 2,480 | $87.50 | $85.43 | $75.00 | $140.00 | $130.00 | $84.00 | $94.39 |
| 16 | Prime coat (AE-P) (310-7001) | GAL | 1,786 | $6.50 | $3.95 | $5.00 | $9.00 | $7.25 | $5.00 | $8.40 |
| 17 | D-GR HMA type-B PG64-22 (341-7001) | TON | 9,579 | $115.00 | $135.15 | $108.00 | $190.00 | $150.00 | $169.00 | $141.30 |
| 18 | D-GR HMA type D sac-B PG76-22 (341-7058) | TON | 2,610 | $145.00 | $200.02 | $150.00 | $160.00 | $200.00 | $250.00 | $172.00 |
| 19 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 2,094 | $145.00 | $151.37 | $197.00 | $150.00 | $190.00 | $189.00 | $164.90 |
| 20 | Tom-C PG76-22 sac-B (347-7002) | TON | 2,239 | $165.00 | $210.83 | $228.00 | $230.00 | $230.00 | $269.00 | $221.25 |
| 21 | Cut & restoring pavement (400-7006) | SY | 1,158 | $125.00 | $324.36 | $100.00 | $570.00 | $130.00 | $88.00 | $303.00 |
| 22 | Cem stabil BKFL (400-7010) | CY | 2,914 | $165.00 | $141.64 | $55.00 | $140.00 | $150.00 | $144.00 | $247.80 |
| 23 | Flowable backfill (401-7001) | CY | 1,999 | $270.00 | $141.64 | $134.00 | $200.00 | $270.00 | $231.00 | $543.00 |
| 24 | Trench excavation protection (402-7001) | LF | 6,793 | $2.50 | $25.41 | $8.00 | $7.00 | $4.50 | $13.00 | $9.50 |
| 25 | Temporary special shoring (403-7001) | SF | 2,233 | $27.50 | $27.31 | $41.00 | $17.00 | $35.00 | $11.00 | $60.00 |
| 26 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 256 | $275.00 | $190.85 | $411.00 | $470.00 | $270.00 | $272.00 | $150.27 |
| 27 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 11 | $350.00 | $259.10 | $390.00 | $445.00 | $380.00 | $302.00 | $213.39 |
| 28 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $450.00 | $265.71 | $432.00 | $495.00 | $380.00 | $664.00 | $219.50 |
| 29 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 22 | $550.00 | $507.20 | $632.00 | $720.00 | $620.00 | $845.00 | $443.85 |
| 30 | Riprap (concrete)(4 in) (432-7001) | CY | 16 | $800.00 | $601.42 | $847.00 | $690.00 | $840.00 | $948.00 | $695.00 |
| 31 | Riprap (concrete)(5 in) (432-7002) | CY | 107 | $650.00 | $588.86 | $808.00 | $530.00 | $840.00 | $1,023.00 | $715.00 |
| 32 | Riprap (mow strip)(4 in) (432-7013) | CY | 6 | $675.00 | $940.64 | $873.00 | $1,200.00 | $970.00 | $737.00 | $1,200.00 |
| 33 | Riprap (stone type R)(grout)(24 in) (432-7028) | CY | 99 | $207.00 | $573.04 | $515.00 | $380.00 | $190.00 | $950.00 | $800.00 |
| 34 | Riprap (stone protection)(12 in) (432-7041) | CY | 371 | $215.00 | $221.65 | $436.00 | $260.00 | $170.00 | $579.00 | $230.00 |
| 35 | Rail (handrail)(type F) (450-7063) | LF | 494 | $180.00 | $137.31 | $136.00 | $160.00 | $170.00 | $156.00 | $181.57 |
| 36 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 174 | $775.00 | $652.25 | $938.00 | $1,700.00 | $540.00 | $976.00 | $631.79 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 346 | $105.00 | $98.33 | $135.00 | $150.00 | $100.00 | $118.00 | $90.97 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 2,010 | $100.00 | $109.01 | $146.00 | $170.00 | $120.00 | $149.00 | $106.31 |
| 39 | RC pipe (CL III)(30 in) (464-7007) | LF | 429 | $175.00 | $126.44 | $167.00 | $210.00 | $150.00 | $181.00 | $154.18 |
| 40 | RC pipe (CL III)(36 in) (464-7009) | LF | 968 | $185.00 | $161.29 | $207.00 | $260.00 | $190.00 | $246.00 | $225.80 |
| 41 | RC pipe (CL III)(42 in) (464-7010) | LF | 703 | $255.00 | $201.78 | $314.00 | $340.00 | $250.00 | $311.00 | $271.71 |
| 42 | RC pipe (CL III)(48 in) (464-7011) | LF | 1,105 | $290.00 | $231.01 | $365.00 | $360.00 | $280.00 | $378.00 | $329.22 |
| 43 | RC pipe (CL V)(18 in) (464-7032) | LF | 378 | $140.00 | $98.33 | $115.00 | $190.00 | $120.00 | $128.00 | $115.72 |
| 44 | RC pipe (CL V)(24 in) (464-7034) | LF | 187 | $240.00 | $109.01 | $218.00 | $220.00 | $120.00 | $160.00 | $140.03 |
| 45 | RC pipe (CL V)(48 in) (464-7039) | LF | 281 | $450.00 | $201.78 | $555.00 | $530.00 | $410.00 | $517.00 | $521.70 |
| 46 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 1 | $7,500.00 | $4,007.20 | $13,928 | $4,000.00 | $3,600.00 | $4,134.00 | $6,897.25 |
| 47 | Manh (complete)(PRM)(72IN) (465-7004) | EACH | 1 | $12,000 | $9,202.37 | $22,486 | $6,900.00 | $11,000 | $11,427 | $14,480 |
| 48 | Junction box(complete)(PJB)(6FTX6FT) (465-7011) | EACH | 6 | $14,725 | $10,944 | $19,460 | $15,000 | $15,000 | $20,649 | $12,934 |
| 49 | Junction box(complete)(PJB)(8FTX8FT) (465-7012) | EACH | 2 | $25,000 | $24,885 | $34,998 | $27,000 | $24,000 | $54,847 | $32,569 |
| 50 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 3 | $8,000.00 | $3,931.24 | $8,960.00 | $5,600.00 | $5,600.00 | $9,667.00 | $6,755.60 |
| 51 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 1 | $8,000.00 | $4,427.51 | $10,824 | $6,300.00 | $6,200.00 | $11,473 | $7,328.00 |
| 52 | Inlet (complete)(pco)(4FT)(left) (465-7018) | EACH | 1 | $8,500.00 | $4,937.03 | $12,008 | $7,100.00 | $6,800.00 | $12,637 | $7,752.00 |
| 53 | Inlet (complete)(pco)(5FT)(right) (465-7023) | EACH | 1 | $9,500.00 | $5,499.80 | $12,208 | $11,000 | $7,100.00 | $13,088 | $8,128.30 |
| 54 | Inlet (complete)(pco)(6FT)(left) (465-7026) | EACH | 1 | $10,500 | $6,865.35 | $13,092 | $12,000 | $8,100.00 | $14,208 | $12,331 |
| 55 | Inlet (complete)(pcu)(3FT)(left) (465-7030) | EACH | 18 | $9,500.00 | $4,445.89 | $10,012 | $6,400.00 | $6,200.00 | $11,413 | $7,418.10 |
| 56 | Inlet (complete)(pcu)(3FT)(right) (465-7031) | EACH | 22 | $9,500.00 | $4,505.64 | $7,000.00 | $6,400.00 | $6,200.00 | $11,521 | $7,328.00 |
| 57 | Inlet (complete)(pcu)(4FT)(left) (465-7034) | EACH | 9 | $10,800 | $5,814.69 | $12,045 | $8,900.00 | $7,700.00 | $13,895 | $8,764.30 |
| 58 | Inlet (complete)(pcu)(4FT)(right) (465-7035) | EACH | 2 | $10,800 | $4,881.89 | $11,458 | $6,900.00 | $6,000.00 | $11,549 | $7,688.40 |
| 59 | Inlet (complete)(pcu)(5FT)(left) (465-7038) | EACH | 2 | $12,500 | $5,894.98 | $18,085 | $9,000.00 | $7,300.00 | $13,865 | $8,584.10 |
| 60 | Inlet (complete)(pcu)(5FT)(right) (465-7039) | EACH | 1 | $12,500 | $6,019.04 | $13,715 | $9,300.00 | $7,600.00 | $14,237 | $8,727.20 |
| 61 | Inlet (complete)(pcu)(6FT)(left) (465-7042) | EACH | 5 | $13,250 | $7,756.80 | $16,276 | $11,000 | $8,900.00 | $16,620 | $13,359 |
| 62 | Inlet (complete)(pcu)(6FT)(right) (465-7043) | EACH | 4 | $13,250 | $7,756.80 | $16,276 | $11,000 | $8,900.00 | $16,467 | $13,359 |
| 63 | Inlet(complete)(PSL)(SFG)(3FTX3FT-3FTX3FT) (465-7146) | EACH | 1 | $9,200.00 | $2,878.97 | $9,076.00 | $5,200.00 | $6,600.00 | $10,736 | $5,541.90 |
| 64 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 5 | $8,500.00 | $3,568.24 | $10,064 | $6,600.00 | $5,600.00 | $10,357 | $6,336.90 |
| 65 | Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160) | EACH | 10 | $9,750.00 | $4,500.50 | $11,501 | $7,000.00 | $5,700.00 | $11,260 | $7,248.50 |
| 66 | Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162) | EACH | 2 | $10,250 | $6,150.14 | $12,473 | $8,900.00 | $7,300.00 | $14,854 | $9,151.20 |
| 67 | Inlet (comp)(type sidewalk bridge) (465-7336) | EACH | 7 | $10,500 | $13,249 | $16,000 | $9,300.00 | $20,000 | $31,304 | $13,142 |
| 68 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 1 | $9,600.00 | $13,245 | $19,285 | $9,600.00 | $23,000 | $16,596 | $20,000 |
| 69 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 1 | $38,500 | $27,517 | $40,190 | $18,000 | $33,000 | $32,437 | $22,000 |
| 70 | Wingwall (SW - 0) (HW=9 FT) (466-7208) | EACH | 1 | $24,500 | $28,734 | $23,237 | $21,000 | $22,000 | $30,103 | $22,000 |
| 71 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 14 | $2,000.00 | $1,436.11 | $3,946.00 | $2,100.00 | $1,200.00 | $2,651.00 | $2,283.76 |
| 72 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 2 | $2,200.00 | $1,610.72 | $5,213.00 | $3,000.00 | $1,300.00 | $2,610.00 | $2,893.29 |
| 73 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,100.00 | $5,700.36 | $5,313.00 | $5,800.00 | $1,300.00 | $2,989.00 | $3,806.59 |
| 74 | Set (type II) (48 in) (RCP) (3: 1) (C) (467-7389) | EACH | 3 | $4,250.00 | $3,076.01 | $11,334 | $11,000 | $4,300.00 | $5,508.00 | $8,172.02 |
| 75 | Jack bor or tun pipe (36")(RC)(E-80 LD) (476-7077) | LF | 70 | $645.00 | $2,558.12 | $2,288.00 | $1,500.00 | $4,000.00 | $2,154.00 | $1,841.00 |
| 76 | Adjusting inlets (479-7002) | EACH | 28 | $2,500.00 | $113.53 | $1,064.00 | $1,700.00 | $750.00 | $2,759.00 | $2,002.00 |
| 77 | Clean existing culverts (480-7001) | EACH | 1 | $3,100.00 | $7,568.40 | $6,686.00 | $5,400.00 | $5,300.00 | $16,234 | $4,500.00 |
| 78 | Remove STR (bollard) (496-7028) | EACH | 6 | $400.00 | $227.05 | $361.00 | $120.00 | $150.00 | $337.00 | $2,500.00 |
| 79 | Mobilization (500-7001) | LS | 1 | $1,514,310 | $1,640,000 | $1,900,000 | $2,000,000 | $2,100,000 | $1,681,209 | $2,650,000 |
| 80 | Barricades, signs and traffic handling (502-7001) | MO | 33 | $12,500 | $5,541.15 | $12,300 | $1,900.00 | $12,000 | $2,847.00 | $27,350 |
| 81 | Portable changeable message sign (503-7002) | EACH | 6 | $10,500 | $21,624 | $7,500.00 | $35,000 | $23,000 | $13,651 | $6,000.00 |
| 82 | TMA (stationary) (505-7001) | DAY | 796 | $175.00 | $810.90 | $82.00 | $75.00 | $260.00 | $227.00 | $300.00 |
| 83 | TMA (mobile operation) (505-7003) | DAY | 5 | $450.00 | $810.90 | $1,370.00 | $140.00 | $260.00 | $227.00 | $800.00 |
| 84 | Rock filter dams (install) (type 2) (506-7002) | LF | 142 | $50.00 | $56.22 | $40.00 | $41.00 | $53.00 | $57.00 | $40.00 |
| 85 | Rock filter dams (remove) (506-7011) | LF | 142 | $20.00 | $28.65 | $15.00 | $23.00 | $26.00 | $29.00 | $20.00 |
| 86 | Temporary sediment control fence (install) (506-7039) | LF | 5,002 | $3.00 | $3.29 | $3.00 | $3.50 | $6.00 | $3.00 | $4.50 |
| 87 | Temporary sediment control fence (remove) (506-7041) | LF | 5,002 | $1.20 | $1.08 | $1.00 | $1.50 | $2.00 | $1.00 | $1.50 |
| 88 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,400 | $7.25 | $7.03 | $8.00 | $7.00 | $14.00 | $7.00 | $11.00 |
| 89 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,400 | $2.00 | $1.08 | $3.00 | $1.00 | $5.25 | $1.00 | $4.00 |
| 90 | Constructing detours (508-7001) | SY | 4,019 | $90.00 | $49.74 | $88.00 | $99.00 | $60.00 | $62.00 | $110.00 |
| 91 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,840 | $45.00 | $65.41 | $70.00 | $150.00 | $27.00 | $109.00 | $64.00 |
| 92 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 400 | $50.00 | $65.41 | $68.00 | $97.00 | $23.00 | $107.00 | $100.00 |
| 93 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,840 | $12.00 | $16.76 | $17.00 | $15.00 | $27.00 | $14.00 | $15.00 |
| 94 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 400 | $12.00 | $16.76 | $23.00 | $11.00 | $23.00 | $16.00 | $15.00 |
| 95 | Concrete curb (type II) (529-7002) | LF | 1,181 | $30.00 | $4.93 | $28.00 | $40.00 | $9.00 | $32.00 | $23.50 |
| 96 | Concrete curb & gutter (type I) (529-7008) | LF | 474 | $50.00 | $5.26 | $41.00 | $38.00 | $39.00 | $33.00 | $26.00 |
| 97 | Concrete curb & gutter (type II) (529-7009) | LF | 7,673 | $35.00 | $5.22 | $20.00 | $21.00 | $39.00 | $31.00 | $35.00 |
| 98 | Concrete curb (type F2) (529-7015) | LF | 206 | $250.00 | $7.20 | $68.00 | $180.00 | $180.00 | $203.00 | $200.00 |
| 99 | Driveways (concrete) (530-7006) | SY | 72 | $100.00 | $78.39 | $118.00 | $250.00 | $190.00 | $212.00 | $120.00 |
| 100 | Driveways (ACP) (530-7010) | SY | 1,720 | $65.00 | $77.85 | $171.00 | $84.00 | $110.00 | $119.00 | $97.15 |
| 101 | Concrete sidewalks (5") (531-7002) | SY | 5,200 | $70.00 | $11.51 | $90.00 | $72.00 | $92.00 | $148.00 | $95.00 |
| 102 | Curb ramps (type 1) (531-7005) | EACH | 7 | $2,500.00 | $1,081.20 | $11,898 | $2,600.00 | $2,200.00 | $2,547.00 | $2,700.00 |
| 103 | Curb ramps (type 2) (531-7006) | EACH | 1 | $3,200.00 | $1,081.20 | $11,156 | $4,500.00 | $3,500.00 | $2,681.00 | $3,500.00 |
| 104 | Curb ramps (type 7) (531-7010) | EACH | 2 | $2,700.00 | $1,081.20 | $7,668.00 | $3,000.00 | $2,600.00 | $2,113.00 | $2,600.00 |
| 105 | Curb ramps (type 10) (531-7011) | EACH | 13 | $2,100.00 | $1,081.20 | $7,310.00 | $2,700.00 | $2,500.00 | $3,296.00 | $3,000.00 |
| 106 | Metal W-beam guard fence (timber post) (540-7001) | LF | 262.50 | $30.00 | $33.47 | $30.00 | $34.00 | $38.00 | $34.00 | $27.53 |
| 107 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | $2,400.00 | $2,270.52 | $2,143.00 | $6,200.00 | $2,700.00 | $2,453.00 | $2,022.00 |
| 108 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,550.00 | $1,621.80 | $1,607.00 | $2,500.00 | $2,100.00 | $1,839.00 | $1,497.00 |
| 109 | Remove metal beam guard fence (542-7001) | LF | 400 | $5.00 | $5.68 | $1.00 | $5.50 | $1.25 | $1.00 | $4.00 |
| 110 | Remove terminal anchor section (542-7002) | EACH | 5 | $600.00 | $162.18 | $214.00 | $910.00 | $270.00 | $245.00 | $250.00 |
| 111 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,400.00 | $3,973.41 | $3,429.00 | $6,200.00 | $4,400.00 | $3,924.00 | $3,381.00 |
| 112 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 8 | $400.00 | $648.72 | $295.00 | $340.00 | $380.00 | $300.00 | $340.00 |
| 113 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 11 | $700.00 | $1,189.32 | $750.00 | $770.00 | $970.00 | $764.00 | $725.00 |
| 114 | Remove RD IL asm (trans-base) (610-7009) | EACH | 3 | $950.00 | $167.66 | $495.00 | $566.00 | $3,700.00 | $1,207.00 | $155.07 |
| 115 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 32 | $4,750.00 | $4,863.94 | $4,317.00 | $5,000.00 | $5,600.00 | $5,793.00 | $4,498.65 |
| 116 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,895 | $22.50 | $18.16 | $15.00 | $16.00 | $16.00 | $19.00 | $16.79 |
| 117 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 1,181 | $32.50 | $27.32 | $40.00 | $45.00 | $28.00 | $76.00 | $25.26 |
| 118 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 235 | $30.00 | $19.95 | $31.00 | $35.00 | $16.00 | $24.00 | $18.45 |
| 119 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 1,295 | $42.50 | $29.56 | $28.00 | $32.00 | $30.00 | $78.00 | $27.34 |
| 120 | Electrical conductor (no.8) bare (620-7007) | LF | 6,246 | $1.75 | $2.59 | $2.00 | $2.50 | $2.00 | $2.00 | $2.40 |
| 121 | Electrical conductor (no.8) insulated (620-7008) | LF | 11,846 | $2.00 | $2.71 | $2.00 | $2.50 | $2.25 | $2.00 | $2.51 |
| 122 | Electrical conductor (no.6) bare (620-7009) | LF | 250 | $3.50 | $2.98 | $3.00 | $3.30 | $2.25 | $4.00 | $2.65 |
| 123 | Electrical conductor (no.6) insulated (620-7010) | LF | 500 | $4.75 | $3.57 | $3.00 | $3.30 | $2.50 | $5.00 | $3.30 |
| 124 | Ground box type A (122311) (624-7001) | EACH | 3 | $1,250.00 | $961.23 | $1,369.00 | $1,600.00 | $860.00 | $966.00 | $899.04 |
| 125 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $1,500.00 | $1,382.85 | $1,790.00 | $2,000.00 | $1,700.00 | $1,448.00 | $1,279.00 |
| 126 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $2,000.00 | $1,452.05 | $2,316.00 | $2,600.00 | $1,800.00 | $2,655.00 | $1,343.00 |
| 127 | Elc SRV type A 120/240 060(NS)AL(E)PS(U) (628-7003) | EACH | 3 | $6,200.00 | $8,114.80 | $9,581.00 | $11,000 | $6,000.00 | $10,742 | $7,505.37 |
| 128 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 55 | $750.00 | $843.34 | $520.00 | $820.00 | $670.00 | $530.00 | $725.00 |
| 129 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 20 | $1,000.00 | $1,064.98 | $670.00 | $971.00 | $860.00 | $683.00 | $743.00 |
| 130 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,000.00 | $1,189.32 | $750.00 | $1,080.00 | $970.00 | $764.00 | $743.00 |
| 131 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,200.00 | $1,508.27 | $916.00 | $1,100.00 | $1,200.00 | $934.00 | $1,006.00 |
| 132 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 1 | $1,250.00 | $1,654.24 | $1,071.00 | $1,200.00 | $1,400.00 | $1,092.00 | $1,562.00 |
| 133 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,250.00 | $1,800.20 | $1,179.00 | $1,200.00 | $1,400.00 | $1,201.00 | $2,500.00 |
| 134 | Remove SM RD SN sup&AM (644-7073) | EACH | 67 | $200.00 | $162.18 | $70.00 | $100.00 | $90.00 | $71.00 | $120.00 |
| 135 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 9 | $60.00 | $54.60 | $33.00 | $34.00 | $69.00 | $55.00 | $52.00 |
| 136 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 13 | $90.00 | $124.34 | $76.00 | $90.00 | $140.00 | $109.00 | $160.00 |
| 137 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 33,007 | $0.50 | $0.83 | $1.00 | $1.00 | $1.25 | $0.37 | $0.34 |
| 138 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 1,490 | $0.80 | $0.92 | $1.00 | $1.00 | $5.50 | $1.00 | $0.43 |
| 139 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 38 | $2.75 | $2.70 | $3.00 | $2.50 | $8.25 | $3.00 | $2.50 |
| 140 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 582 | $7.00 | $5.41 | $5.00 | $5.70 | $14.00 | $7.00 | $3.40 |
| 141 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 13 | $100.00 | $118.93 | $110.00 | $125.00 | $150.00 | $120.00 | $77.00 |
| 142 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 5 | $250.00 | $243.27 | $225.00 | $250.00 | $330.00 | $273.00 | $250.00 |
| 143 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 12 | $100.00 | $118.93 | $110.00 | $125.00 | $160.00 | $120.00 | $77.00 |
| 144 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 90 | $1.50 | $1.08 | $1.00 | $1.10 | $1.75 | $2.00 | $0.34 |
| 145 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 32,873 | $0.50 | $0.83 | $1.00 | $0.80 | $1.25 | $0.37 | $0.34 |
| 146 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 10 | $10.00 | $7.03 | $7.00 | $7.50 | $14.00 | $4.00 | $5.75 |
| 147 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 638 | $5.00 | $7.03 | $7.00 | $7.50 | $11.00 | $4.00 | $5.75 |
| 148 | Work zone pavement marking removing (reflectorized) type II-C-R (662-7053) | EACH | 9 | $15.00 | $7.03 | $7.00 | $7.50 | $14.00 | $4.00 | $8.00 |
| 149 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 521 | $1.90 | $3.24 | $3.00 | $5.70 | $0.75 | $6.00 | $2.00 |
| 150 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,113 | $1.90 | $3.24 | $2.00 | $5.70 | $0.75 | $5.00 | $2.00 |
| 151 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 48 | $2.50 | $2.16 | $2.00 | $2.30 | $3.00 | $2.00 | $2.05 |
| 152 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,547 | $1.70 | $1.19 | $1.00 | $1.20 | $2.25 | $2.00 | $1.60 |
| 153 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 136 | $5.00 | $3.52 | $3.00 | $3.70 | $12.00 | $4.00 | $3.40 |
| 154 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 874 | $11.00 | $7.03 | $7.00 | $7.40 | $21.00 | $10.00 | $7.00 |
| 155 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 26 | $200.00 | $189.21 | $175.00 | $200.00 | $340.00 | $186.00 | $176.00 |
| 156 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 12 | $250.00 | $216.24 | $200.00 | $225.00 | $370.00 | $197.00 | $250.00 |
| 157 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 4 | $600.00 | $540.60 | $500.00 | $571.00 | $990.00 | $639.00 | $725.00 |
| 158 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 98 | $2.50 | $2.70 | $3.00 | $2.80 | $4.00 | $5.00 | $3.00 |
| 159 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,163 | $0.50 | $1.36 | $1.00 | $1.40 | $1.25 | $2.00 | $2.50 |
| 160 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 6,522 | $1.10 | $0.94 | $1.00 | $1.00 | $1.25 | $1.00 | $0.70 |
| 161 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 1,180 | $1.00 | $0.94 | $1.00 | $1.00 | $1.25 | $2.00 | $0.70 |
| 162 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 13,735 | $1.10 | $0.94 | $1.00 | $1.00 | $1.25 | $1.00 | $0.70 |
| 163 | Reflectorized pavement marker type I-C (672-7002) | EACH | 116 | $7.00 | $7.03 | $7.00 | $7.40 | $13.00 | $5.00 | $6.10 |
| 164 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 418 | $8.50 | $7.03 | $7.00 | $7.40 | $11.00 | $5.00 | $6.10 |
| 165 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 9 | $8.00 | $7.03 | $7.00 | $7.40 | $15.00 | $5.00 | $6.10 |
| 166 | Eliminating existing PM & markers (4") (677-7001) | LF | 23,730 | $1.25 | $0.72 | $1.00 | $1.00 | $1.25 | $1.00 | $0.52 |
| 167 | Eliminating existing PM & markers (6") (677-7002) | LF | 17,460 | $1.75 | $0.84 | $1.00 | $1.00 | $1.50 | $1.00 | $0.52 |
| 168 | Eliminating existing PM & markers (8") (677-7004) | LF | 600 | $2.50 | $0.94 | $1.00 | $1.00 | $1.75 | $1.00 | $0.52 |
| 169 | Eliminating existing PM & markers (24") (677-7008) | LF | 90 | $6.00 | $4.32 | $4.00 | $4.50 | $11.00 | $4.00 | $2.50 |
| 170 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 4 | $100.00 | $108.12 | $100.00 | $114.00 | $140.00 | $60.00 | $25.00 |
| 171 | Eliminating existing PM & markers (word) (677-7015) | EACH | 4 | $100.00 | $108.12 | $100.00 | $114.00 | $160.00 | $60.00 | $25.00 |
| 172 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 2 | $215.00 | $216.24 | $200.00 | $225.00 | $310.00 | $273.00 | $160.00 |
| 173 | Pavement surface preparation for marking (12") (678-7006) | LF | 98 | $1.00 | $1.08 | $1.00 | $1.00 | $4.00 | $2.00 | $0.50 |
| 174 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $35,000 | $16,979 | $16,371 | $18,000 | $68,000 | $9,656.00 | $15,704 |
| 175 | Removing traffic signals (680-7004) | EACH | 1 | $6,000.00 | $3,353.10 | $8,528.00 | $9,700.00 | $7,900.00 | $4,828.00 | $3,101.27 |
| 176 | Temporary traffic signals (681-7001) | EACH | 1 | $70,000 | $59,685 | $73,698 | $84,000 | $75,000 | $114,662 | $55,203 |
| 177 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 9 | $350.00 | $300.96 | $400.00 | $450.00 | $270.00 | $422.00 | $278.36 |
| 178 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $350.00 | $300.88 | $400.00 | $450.00 | $270.00 | $422.00 | $278.28 |
| 179 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 9 | $350.00 | $300.96 | $400.00 | $450.00 | $270.00 | $422.00 | $278.36 |
| 180 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $350.00 | $300.88 | $400.00 | $450.00 | $270.00 | $422.00 | $278.28 |
| 181 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 9 | $350.00 | $300.96 | $400.00 | $450.00 | $270.00 | $422.00 | $278.36 |
| 182 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $350.00 | $300.85 | $400.00 | $450.00 | $270.00 | $422.00 | $278.25 |
| 183 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 2 | $870.00 | $798.94 | $990.00 | $1,100.00 | $830.00 | $713.00 | $738.93 |
| 184 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 7 | $175.00 | $176.28 | $179.00 | $200.00 | $180.00 | $175.00 | $163.04 |
| 185 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 4 | $200.00 | $249.50 | $263.00 | $300.00 | $210.00 | $241.00 | $230.66 |
| 186 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,279 | $3.00 | $3.21 | $3.00 | $3.10 | $2.00 | $4.00 | $2.97 |
| 187 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 812 | $3.50 | $3.80 | $3.00 | $3.70 | $2.25 | $5.00 | $3.52 |
| 188 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 390 | $2.00 | $2.85 | $2.00 | $2.30 | $1.50 | $2.00 | $2.63 |
| 189 | Reloct RDSD FLSH BCN AM (solar PWRD) (685-7005) | EACH | 3 | $3,000.00 | $2,309.99 | $3,895.00 | $4,500.00 | $2,600.00 | $7,000.00 | $2,136.51 |
| 190 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $13,000 | $13,423 | $10,844 | $12,000 | $14,000 | $18,105 | $12,415 |
| 191 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $16,000 | $15,928 | $13,897 | $16,000 | $16,000 | $20,519 | $14,731 |
| 192 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $45,000 | $40,905 | $45,166 | $51,000 | $34,000 | $39,830 | $37,833 |
| 193 | Pedestrian detect push button (APS) (688-7001) | EACH | 2 | $1,500.00 | $928.82 | $105.00 | $1,200.00 | $770.00 | $1,448.00 | $859.07 |
| 194 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,000.00 | $4,181.04 | $3,895.00 | $4,500.00 | $4,300.00 | $3,621.00 | $3,867.04 |
| 195 | Bonding course (3007-7001) | GAL | 8,496 | $4.75 | $3.90 | $22.00 | $5.70 | $7.50 | $5.00 | $3.75 |
| 196 | ITS com CBL (ethernet) (6005-7001) | LF | 180 | $3.00 | $2.67 | $2.00 | $2.00 | $3.00 | $5.00 | $2.47 |
| 197 | VIVDS temporary (6006-7006) | EACH | 1 | $36,000 | $54,559 | $21,162 | $24,000 | $39,000 | $8,449.00 | $50,461 |
| 198 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,600.00 | $10,257 | $9,265.00 | $10,000 | $8,900.00 | $10,863 | $9,486.63 |
| 199 | RVDS (presence detection only) (6008-7001) | EACH | 4 | $8,750.00 | $8,442.80 | $5,685.00 | $5,500.00 | $8,500.00 | $9,052.00 | $7,808.63 |
| 200 | RVDS (advance detection only) (6008-7002) | EACH | 3 | $8,750.00 | $901.20 | $5,475.00 | $5,200.00 | $9,100.00 | $9,052.00 | $8,333.52 |
| 201 | Subsurface util locate (outside rdbed) (7019-7001) | EACH | 20 | $1,000.00 | $1,081.20 | $753.00 | $1,800.00 | $2,300.00 | $3,428.00 | $2,000.00 |
| 202 | Subsurface util locate (within rdbed) (7019-7002) | EACH | 10 | $2,500.00 | $1,081.20 | $4,050.00 | $4,000.00 | $2,300.00 | $5,695.00 | $2,500.00 |
| 203 | Acsr (6/1) pri /sec only (7061-7005) | EACH | 378 | $1.48 | $108.12 | $150.00 | $100.00 | $4.75 | $10.00 | $3.75 |
| 204 | XLP triplex sec only (7061-7006) | EACH | 247 | $2.95 | $108.12 | $180.00 | $1,005.00 | $7.00 | $13.00 | $5.37 |
| 205 | Aac conductor (7061-7007) | EACH | 1,486 | $2.60 | $8.11 | $120.00 | $25.00 | $5.50 | $10.00 | $4.35 |
| 206 | Pole (35') CL 4 wood (7061-7008) | EACH | 1 | $840.19 | $5,406.00 | $850.00 | $1,000.00 | $3,300.00 | $1,518.00 | $2,548.51 |
| 207 | Pole (40') CL 4 wood (7061-7009) | EACH | 7 | $1,158.12 | $5,406.00 | $950.00 | $2,000.00 | $4,000.00 | $1,434.00 | $3,066.28 |
| 208 | Pole (40') CL 5 wood (7061-7010) | EACH | 2 | $1,158.12 | $5,406.00 | $1,050.00 | $3,000.00 | $4,000.00 | $1,434.00 | $3,066.28 |
| 209 | Pole (45') CL 2 wood (7061-7011) | EACH | 3 | $1,583.41 | $5,406.00 | $1,050.00 | $4,000.00 | $5,500.00 | $1,598.00 | $4,247.73 |
| 210 | Pole (45)' CL 4 wood (7061-7012) | EACH | 3 | $1,298.53 | $5,406.00 | $1,050.00 | $5,000.00 | $5,200.00 | $1,598.00 | $4,032.73 |
| 211 | Pole (50') CL 2 & 3 dist only (7061-7013) | EACH | 3 | $2,416.21 | $5,406.00 | $1,150.00 | $6,000.00 | $5,700.00 | $1,774.00 | $4,402.73 |
| 212 | Pole (60') CL 1 wood (7061-7014) | EACH | 1 | $3,662.81 | $5,406.00 | $1,250.00 | $7,000.00 | $6,700.00 | $2,912.00 | $5,225.50 |
| 213 | Pole (65') CL 2 wood (7061-7015) | EACH | 1 | $5,289.18 | $5,406.00 | $1,350.00 | $8,000.00 | $6,700.00 | $3,623.00 | $5,200.50 |
| 214 | PH take-off (7061-7016) | EACH | 4 | $266.71 | $540.60 | $120.00 | $500.00 | $1,400.00 | $137.00 | $1,098.09 |
| 215 | PH take-off (link extension) (7061-7017) | EACH | 2 | $301.48 | $540.60 | $120.00 | $750.00 | $1,400.00 | $137.00 | $1,098.09 |
| 216 | PH transf on tangent line/X-arm M (7061-7018) | EACH | 3 | $830.59 | $540.60 | $150.00 | $1,500.00 | $2,100.00 | $129.00 | $1,628.08 |
| 217 | PH(2) single X-arm (7061-7019) | EACH | 4 | $362.76 | $540.60 | $250.00 | $1,500.00 | $1,500.00 | $728.00 | $1,155.44 |
| 218 | PH(2) single deadend on X-arms (7061-7020) | EACH | 2 | $765.56 | $540.60 | $250.00 | $2,000.00 | $1,800.00 | $1,514.00 | $1,387.16 |
| 219 | PH(3) gang operated switch (7061-7021) | EACH | 1 | $7,677.68 | $540.60 | $800.00 | $2,500.00 | $17,000 | $10,395 | $13,213 |
| 220 | PH(3) single X-arm const (7061-7022) | EACH | 3 | $245.34 | $540.60 | $250.00 | $3,000.00 | $1,600.00 | $559.00 | $1,212.78 |
| 221 | PH(3) support staggered (7061-7023) | EACH | 1 | $546.77 | $540.60 | $250.00 | $3,500.00 | $1,600.00 | $1,093.00 | $1,212.78 |
| 222 | PH(3) X-arm deadend (7061-7024) | EACH | 3 | $35.08 | $540.60 | $250.00 | $4,000.00 | $2,200.00 | $1,437.00 | $1,676.22 |
| 223 | LNP double deadend (5' narrow profile) (7061-7025) | EACH | 1 | $1,118.19 | $540.60 | $700.00 | $195.00 | $2,200.00 | $3,383.00 | $1,676.22 |
| 224 | Single phase conv transf/cutout on (7061-7026) | EACH | 6 | $847.89 | $540.60 | $2,800.00 | $750.00 | $940.00 | $3,926.00 | $1,628.08 |
| 225 | Grounding assembly - ground rod type (7061-7027) | EACH | 10 | $217.14 | $540.60 | $250.00 | $1,000.00 | $2,100.00 | $268.00 | $730.95 |
| 226 | Service deadend rigid clevis (7061-7028) | EACH | 17 | $71.22 | $540.60 | $120.00 | $1,500.00 | $940.00 | $137.00 | $592.62 |
| 227 | Swinging clevis sec deadend assemb pole (7061-7029) | EACH | 1 | $53.03 | $540.60 | $150.00 | $3,500.00 | $760.00 | $137.00 | $592.62 |
| 228 | X-arm pin and insulator (7061-7030) | EACH | 2 | $40.21 | $540.60 | $1,200.00 | $2,000.00 | $760.00 | $764.00 | $592.62 |
| 229 | Pole protection ground assy/butt plate (7061-7031) | EACH | 11 | $186.61 | $540.60 | $25.00 | $1,500.00 | $760.00 | $764.00 | $623.73 |
| 230 | Secondary metering (120/240V) (7061-7032) | EACH | 1 | $2,769.27 | $540.60 | $500.00 | $7,500.00 | $820.00 | $2,492.00 | $635.40 |
| 231 | LED 230 (12' arm) (7061-7033) | EACH | 8 | $1,194.68 | $1,621.80 | $1,200.00 | $10,000 | $1,100.00 | $2,555.00 | $881.71 |
| 232 | Pole secondary cable terminal (7061-7034) | EACH | 5 | $881.23 | $540.60 | $150.00 | $11,000 | $4,800.00 | $596.00 | $3,688.41 |
| 233 | Single down guy (thru bolt type) (7061-7035) | EACH | 17 | $371.83 | $540.60 | $700.00 | $3,500.00 | $980.00 | $399.00 | $756.53 |
| 234 | Anchor 7' single eye rod (7061-7036) | EACH | 8 | $207.46 | $540.60 | $400.00 | $5,000.00 | $1,400.00 | $905.00 | $1,092.63 |
| 235 | Vertical narrow profile (tangent) (7061-7037) | EACH | 1 | $450.43 | $54.06 | $900.00 | $1,000.00 | $1,600.00 | $798.00 | $1,212.78 |
| 236 | Double support on X-arm (7061-7038) | EACH | 1 | $913.77 | $540.60 | $1,200.00 | $2,000.00 | $1,600.00 | $1,177.00 | $1,212.78 |
| 237 | 1N narrow prof double supp construction (7061-7039) | EACH | 3 | $631.13 | $540.60 | $600.00 | $3,000.00 | $1,600.00 | $550.00 | $1,212.78 |
| 238 | LNP deadend (5' narrow profile) (7061-7040) | EACH | 4 | $768.13 | $540.60 | $800.00 | $3,500.00 | $2,200.00 | $1,515.00 | $1,676.22 |
| 239 | Cutout X-arm (7061-7041) | EACH | 8 | $320.56 | $540.60 | $700.00 | $7,500.00 | $890.00 | $390.00 | $692.11 |
| 240 | Remove acsr 6/1 pri /sec (7061-7042) | EACH | 347 | $0.58 | $10.81 | $115.00 | $195.00 | $2.50 | $6.00 | $1.99 |
| 241 | Remove XLP triplex sec (7061-7043) | EACH | 223 | $0.95 | $10.81 | $50.00 | $205.00 | $6.25 | $9.00 | $4.79 |
| 242 | Removal of pole (30') wood (7061-7044) | EACH | 2 | $170.00 | $1,621.80 | $800.00 | $1,000.00 | $1,100.00 | $845.00 | $836.94 |
| 243 | Remove aac conductor (7061-7045) | EACH | 1,477 | $1.00 | $10.81 | $5.00 | $25.00 | $2.50 | $14.00 | $1.99 |
| 244 | Removal of pole (35') wood (7061-7046) | EACH | 6 | $241.69 | $1,621.80 | $850.00 | $500.00 | $1,100.00 | $1,290.00 | $836.94 |
| 245 | Removal of pole (40') wood (7061-7047) | EACH | 5 | $275.88 | $1,621.80 | $850.00 | $750.00 | $1,700.00 | $1,429.00 | $1,304.71 |
| 246 | Removal of pole (45') wood (7061-7048) | EACH | 7 | $276.15 | $1,621.80 | $900.00 | $1,000.00 | $1,700.00 | $1,569.00 | $1,304.71 |
| 247 | Removal of pole (50') dist. only (7061-7049) | EACH | 2 | $345.00 | $1,621.80 | $950.00 | $1,500.00 | $1,700.00 | $1,720.00 | $1,324.85 |
| 248 | Remove single X-arm const (7061-7050) | EACH | 3 | $58.05 | $108.12 | $180.00 | $2,000.00 | $700.00 | $625.00 | $545.08 |
| 249 | Remove support staggered (7061-7051) | EACH | 1 | $90.53 | $108.12 | $220.00 | $3,500.00 | $700.00 | $1,138.00 | $545.08 |
| 250 | Remove X-arm deadend (7061-7052) | EACH | 3 | $165.23 | $108.12 | $190.00 | $5,000.00 | $190.00 | $1,432.00 | $545.08 |
| 251 | Remove guy anchor (7061-7053) | EACH | 2 | $86.53 | $108.12 | $330.00 | $3,000.00 | $220.00 | $980.00 | $147.17 |
| 252 | Remove single down guy (7061-7054) | EACH | 9 | $105.11 | $108.12 | $160.00 | $1,500.00 | $1,400.00 | $549.00 | $172.69 |
| 253 | Removal of transf on tanget line/X-arm (7061-7055) | EACH | 3 | $281.40 | $108.12 | $250.00 | $2,000.00 | $1,400.00 | $2,556.00 | $1,097.68 |
| 254 | Removal of single phase conv transf/cutout (7061-7056) | EACH | 6 | $281.40 | $108.12 | $240.00 | $5,000.00 | $260.00 | $1,711.00 | $1,097.68 |
| 255 | Remove grounding assembly (7061-7057) | EACH | 10 | $48.28 | $108.12 | $800.00 | $20.00 | $40.00 | $241.00 | $200.55 |
| 256 | Remove service deadend rigid clevis (7061-7058) | EACH | 21 | $17.26 | $108.12 | $100.00 | $25.00 | $40.00 | $201.00 | $31.07 |
| 257 | Remove swinging clevis deadend assemb (7061-7059) | EACH | 1 | $26.22 | $108.12 | $110.00 | $30.00 | $56.00 | $201.00 | $31.07 |
| 258 | Remove ground assemb/butt plate (7061-7060) | EACH | 11 | $33.06 | $108.12 | $100.00 | $35.00 | $140.00 | $241.00 | $43.51 |
| 259 | Remove secondary metering (7061-7061) | EACH | 1 | $494.48 | $108.12 | $200.00 | $25.00 | $250.00 | $1,183.00 | $105.00 |
| 260 | Removal of LED 230 (12' arm) (7061-7062) | EACH | 8 | $137.19 | $108.12 | $1,300.00 | $1,200.00 | $360.00 | $1,138.00 | $190.10 |
| 261 | Remove secondary cable terminal pole (7061-7063) | EACH | 5 | $94.33 | $108.12 | $250.00 | $1,500.00 | $700.00 | $201.00 | $280.72 |
| 262 | Remove single X-arm (7061-7064) | EACH | 4 | $55.74 | $108.12 | $200.00 | $1,000.00 | $1,300.00 | $686.00 | $545.08 |
| 263 | Remove single deadend on X-arms (7061-7065) | EACH | 2 | $190.48 | $108.12 | $220.00 | $1,200.00 | $700.00 | $1,432.00 | $545.08 |
| 264 | Removing vertical narrow profile (tangent) (7061-7066) | EACH | 1 | $89.63 | $108.12 | $350.00 | $10.00 | $700.00 | $620.00 | $545.08 |
| 265 | Remove narrow profile large conductor (7061-7067) | EACH | 2 | $60.35 | $108.12 | $350.00 | $15.00 | $700.00 | $1,445.00 | $545.08 |
| 266 | Remove double supp on X-arms (7061-7068) | EACH | 1 | $130.00 | $108.12 | $260.00 | $20.00 | $700.00 | $948.00 | $545.08 |
| 267 | Remove narrow profile double supp (7061-7069) | EACH | 2 | $241.40 | $108.12 | $260.00 | $25.00 | $700.00 | $948.00 | $545.08 |
| 268 | Remove deadend narrow profile (7061-7070) | EACH | 4 | $226.31 | $108.12 | $230.00 | $30.00 | $700.00 | $1,412.00 | $545.08 |
| 269 | Remove cutout X-arm (7061-7071) | EACH | 8 | $66.20 | $108.12 | $190.00 | $35.00 | $120.00 | $542.00 | $94.20 |
| 270 | Remove gang operated switch (7061-7072) | EACH | 1 | $1,266.31 | $108.12 | $2,500.00 | $50.00 | $4,600.00 | $10,939 | $3,571.55 |
| 271 | Cut & restore asphalt paving (lines) (7063-7001) | SQ | 1,246 | $90.00 | $54.06 | $93.00 | $33.00 | $130.00 | $88.00 | $124.95 |
| 272 | Cut & restore asphalt paving (bores) (7063-7002) | SQ | 502 | $90.00 | $54.06 | $148.00 | $58.00 | $130.00 | $89.00 | $116.55 |
| 273 | Cut & restore concrete paving (lines) (7063-7003) | SQ | 74 | $100.00 | $54.06 | $406.00 | $180.00 | $240.00 | $227.00 | $177.45 |
| 274 | Cut & restore flex base (lines) (7063-7004) | SQ | 134 | $45.00 | $54.06 | $70.00 | $93.00 | $23.00 | $67.00 | $92.40 |
| 275 | Pipe SS(6")DR26(0'-6')(nup) (7063-7005) | LF | 11 | $70.00 | $68.04 | $88.00 | $120.00 | $140.00 | $156.00 | $181.65 |
| 276 | Pipe SS(6")DR26(8'-10')(nup) (7063-7006) | LF | 32 | $85.00 | $82.23 | $81.00 | $99.00 | $150.00 | $164.00 | $182.70 |
| 277 | Pipe SS(6")DR26(12'-14')(nup) (7063-7007) | LF | 21 | $100.00 | $105.89 | $92.00 | $120.00 | $170.00 | $175.00 | $185.85 |
| 278 | Pipe SS(6")DR26(14'-16')(nup) (7063-7008) | LF | 11 | $110.00 | $153.18 | $113.00 | $120.00 | $180.00 | $189.00 | $190.05 |
| 279 | Pipe SS(6")DR26(8'-10')(P) (7063-7009) | LF | 10 | $95.00 | $82.23 | $87.00 | $120.00 | $310.00 | $247.00 | $237.30 |
| 280 | Pipe SS(6")DR26(10'-12')(P) (7063-7010) | LF | 40 | $105.00 | $105.89 | $91.00 | $120.00 | $310.00 | $303.00 | $287.70 |
| 281 | Pipe SS(6")DR26(12'-14')(P) (7063-7011) | LF | 50 | $110.00 | $105.89 | $92.00 | $120.00 | $380.00 | $348.00 | $292.95 |
| 282 | Pipe SS(4")DR26(0'-12')(P)(8"steel)open (7063-7012) | LF | 237 | $180.00 | $157.65 | $195.00 | $200.00 | $390.00 | $331.00 | $308.70 |
| 283 | Pipe SS(6")DR26(0'-6')(P)(12"steel)open (7063-7013) | LF | 18 | $200.00 | $196.31 | $270.00 | $240.00 | $390.00 | $356.00 | $280.35 |
| 284 | Pipe SS(6")DR26(14'-16')(P)(12"steel)open (7063-7014) | LF | 22 | $230.00 | $269.46 | $316.00 | $240.00 | $560.00 | $450.00 | $368.55 |
| 285 | Pipe SS(4")DR26(8" steel)bore (7063-7015) | LF | 379 | $425.00 | $438.80 | $970.00 | $990.00 | $460.00 | $1,143.00 | $391.65 |
| 286 | Pipe SS(6")DR26(12" steel)bore (7063-7016) | LF | 82 | $470.00 | $296.81 | $1,026.00 | $1,000.00 | $540.00 | $1,271.00 | $423.15 |
| 287 | Pipe SS(8")DR26(0'-6')(nup) (7063-7017) | LF | 298 | $80.00 | $297.63 | $75.00 | $120.00 | $150.00 | $165.00 | $141.75 |
| 288 | Pipe SS(8")DR26(6'-8')(nup) (7063-7018) | LF | 415 | $85.00 | $249.24 | $72.00 | $120.00 | $150.00 | $170.00 | $154.35 |
| 289 | Pipe SS(8")DR26(8'-10')(nup) (7063-7019) | LF | 249 | $100.00 | $379.86 | $76.00 | $120.00 | $160.00 | $174.00 | $192.15 |
| 290 | Pipe SS(8")DR26(12'-14')(nup) (7063-7020) | LF | 26 | $110.00 | $160.36 | $102.00 | $120.00 | $170.00 | $185.00 | $183.75 |
| 291 | Pipe SS(8")DR26(0'-6')nup(12" PVC)open (7063-7021) | LF | 360 | $170.00 | $329.78 | $110.00 | $240.00 | $250.00 | $260.00 | $191.10 |
| 292 | Pipe SS(8")DR26(6'-8')nup(12" PVC)open (7063-7022) | LF | 272 | $180.00 | $392.65 | $110.00 | $240.00 | $250.00 | $278.00 | $203.70 |
| 293 | Pipe SS(8")DR26(0'-6')(P) (7063-7023) | LF | 167 | $90.00 | $75.21 | $74.00 | $120.00 | $260.00 | $186.00 | $164.85 |
| 294 | Pipe SS(8")DR26(12'-14')(P) (7063-7024) | LF | 199 | $130.00 | $113.06 | $89.00 | $140.00 | $410.00 | $276.00 | $265.65 |
| 295 | Pipe SS(8")DR26(0'-6')(P)(12" PVC)open (7063-7025) | LF | 40 | $190.00 | $189.07 | $232.00 | $240.00 | $330.00 | $328.00 | $235.20 |
| 296 | Pipe SS(8")DR26(6'-8')(P)(12" PVC)open (7063-7026) | LF | 45 | $195.00 | $206.26 | $232.00 | $260.00 | $330.00 | $331.00 | $237.30 |
| 297 | Pipe SS(8")DR26(0'-6')(P)(14" steel)open (7063-7027) | LF | 20 | $250.00 | $205.99 | $378.00 | $280.00 | $390.00 | $429.00 | $277.20 |
| 298 | Pipe SS(8")DR26(6'-8')(P)(14" steel)open (7063-7028) | LF | 134 | $260.00 | $699.91 | $373.00 | $340.00 | $400.00 | $429.00 | $282.45 |
| 299 | Pipe SS(8")DR26(12'-14')(P)(14" steel)opn (7063-7030) | LF | 30 | $290.00 | $261.60 | $391.00 | $350.00 | $530.00 | $480.00 | $386.40 |
| 300 | Pipe SS(8")DR26(14" steel)bore (7063-7031) | LF | 134 | $500.00 | $763.47 | $1,040.00 | $1,000.00 | $590.00 | $1,257.00 | $496.65 |
| 301 | Pipe SS(12")DR26(8'-10')(nup) (7063-7032) | LF | 76 | $145.00 | $133.54 | $107.00 | $150.00 | $200.00 | $190.00 | $176.40 |
| 302 | Pipe SS(12")DR26(10'-12')(nup) (7063-7033) | LF | 465 | $150.00 | $277.21 | $111.00 | $140.00 | $200.00 | $209.00 | $177.45 |
| 303 | Pipe SS(12")DR26(12'-14')(nup) (7063-7034) | LF | 100 | $155.00 | $795.95 | $111.00 | $140.00 | $210.00 | $223.00 | $196.35 |
| 304 | Pipe SS(12")DR26(8'-10')(P) (7063-7035) | LF | 144 | $155.00 | $597.75 | $107.00 | $140.00 | $340.00 | $297.00 | $257.25 |
| 305 | Pipe SS(12")DR26(8'-10')(P)(20"steel)open (7063-7036) | LF | 25 | $350.00 | $389.63 | $530.00 | $390.00 | $530.00 | $480.00 | $386.40 |
| 306 | Pipe SS(12")DR26(10'-12')(P)(20"steel)opn (7063-7037) | LF | 50 | $360.00 | $304.44 | $535.00 | $390.00 | $550.00 | $494.00 | $393.75 |
| 307 | Pipe SS(15")SDR26(12'-14')(P) (7063-7038) | LF | 52 | $190.00 | $192.31 | $152.00 | $170.00 | $460.00 | $385.00 | $355.95 |
| 308 | Pipe SS(15")SDR26(14'-16')(P) (7063-7040) | LF | 212 | $200.00 | $507.56 | $153.00 | $190.00 | $520.00 | $396.00 | $400.05 |
| 309 | Pipe SS(20")DR25(8'-10')(nup) (7063-7041) | LF | 28 | $235.00 | $151.45 | $126.00 | $190.00 | $250.00 | $274.00 | $243.60 |
| 310 | Pipe SS(20")DR25(10'-12')(nup) (7063-7042) | LF | 24 | $250.00 | $198.76 | $136.00 | $190.00 | $250.00 | $373.00 | $244.65 |
| 311 | Pipe SS(20")DR25(12'-14')(nup) (7063-7043) | LF | 50 | $265.00 | $198.76 | $139.00 | $240.00 | $250.00 | $397.00 | $257.25 |
| 312 | Pipe SS(20")DR25(14'-16')(nup) (7063-7044) | LF | 53 | $280.00 | $198.76 | $138.00 | $240.00 | $250.00 | $430.00 | $275.10 |
| 313 | Pipe SS(20")DR25(16'-18')(nup) (7063-7045) | LF | 172 | $285.00 | $586.48 | $141.00 | $240.00 | $260.00 | $430.00 | $297.15 |
| 314 | Pipe SS(20")DR25(16'-18')(P)(30"steel)opn (7063-7046) | LF | 15 | $620.00 | $681.00 | $740.00 | $600.00 | $1,100.00 | $1,140.00 | $479.85 |
| 315 | Pipe SS(20")DR25(30" steel)bore (7063-7047) | LF | 58 | $850.00 | $557.60 | $1,650.00 | $1,700.00 | $1,100.00 | $2,019.00 | $1,107.75 |
| 316 | Service SS(4")DR26(long) (7063-7048) | EACH | 9 | $4,600.00 | $3,062.39 | $1,580.00 | $4,500.00 | $4,100.00 | $3,956.00 | $8,871.45 |
| 317 | Service SS(4")DR26(long)(deep) (7063-7049) | EACH | 3 | $6,200.00 | $3,536.42 | $2,127.00 | $4,500.00 | $5,000.00 | $6,377.00 | $13,111 |
| 318 | Service SS(4")DR26(short) (7063-7050) | EACH | 9 | $4,400.00 | $2,495.77 | $1,660.00 | $2,600.00 | $2,800.00 | $2,199.00 | $2,860.20 |
| 319 | Service SS(4")DR26(short)(deep) (7063-7051) | EACH | 1 | $6,000.00 | $2,561.10 | $1,723.00 | $2,600.00 | $3,100.00 | $4,277.00 | $6,253.80 |
| 320 | Manhole (4')(PC W/ coat)(0'-6')(nup) (7063-7052) | EACH | 13 | $9,000.00 | $3,257.43 | $6,067.00 | $10,000 | $13,000 | $9,594.00 | $8,975.40 |
| 321 | Manhole (4')(PC W/ coat)(0'-6')(nup)WT (7063-7053) | EACH | 3 | $10,000 | $3,513.63 | $6,753.00 | $9,800.00 | $13,000 | $10,748 | $8,975.40 |
| 322 | Add depth (4' MH)(PC W/ coat)(nup) (7063-7054) | VF | 55.90 | $780.00 | $190.57 | $550.00 | $600.00 | $550.00 | $770.00 | $947.10 |
| 323 | Manhole (4')(PC W/ coat)(0'-6')(P) (7063-7055) | EACH | 7 | $10,000 | $3,271.52 | $6,366.00 | $10,000 | $15,000 | $11,101 | $9,185.40 |
| 324 | Add depth (4' MH) (PC W/ coat) (P) (7063-7056) | VF | 31 | $880.00 | $190.57 | $495.00 | $600.00 | $660.00 | $864.00 | $980.70 |
| 325 | Manhole (5') (PC W/ coat) (0'-6')(nup) (7063-7057) | EACH | 3 | $12,000 | $5,720.63 | $12,932 | $12,000 | $16,000 | $19,146 | $12,477 |
| 326 | Add depth (5' MH) (PC W/ coat) (nup) (7063-7058) | VF | 20.50 | $1,000.00 | $277.06 | $700.00 | $930.00 | $700.00 | $1,219.00 | $1,015.35 |
| 327 | Manhole (5') (PC W/ coat) (0'-6')(P) (7063-7059) | EACH | 3 | $13,000 | $5,720.63 | $11,185 | $11,000 | $18,000 | $16,541 | $12,817 |
| 328 | Add depth (5' MH) (PC W/ coat) (P) (7063-7060) | VF | 21.50 | $1,100.00 | $277.06 | $609.00 | $910.00 | $1,100.00 | $1,522.00 | $1,076.25 |
| 329 | Final rim adjustment (4' MH) (7063-7061) | EACH | 8 | $3,000.00 | $92.98 | $800.00 | $930.00 | $1,100.00 | $800.00 | $2,176.65 |
| 330 | Final rim adjustment (5' MH) (7063-7062) | EACH | 2 | $4,000.00 | $92.98 | $900.00 | $930.00 | $1,100.00 | $800.00 | $2,205.00 |
| 331 | Pipe SS force main (4")(DR21)(nup) (7063-7063) | LF | 153 | $60.00 | $67.75 | $89.00 | $88.00 | $83.00 | $89.00 | $51.45 |
| 332 | Pipe SS forcemain(4")DR21(P)(8"steel)open (7063-7064) | LF | 55 | $180.00 | $127.63 | $217.00 | $150.00 | $200.00 | $237.00 | $127.05 |
| 333 | Tie in existing (lift station) (7063-7065) | EACH | 1 | $30,000 | $11,353 | $2,046.00 | $11,000 | $4,000.00 | $18,429 | $4,068.75 |
| 334 | Tie in existing (SS) force main (3") (7063-7066) | EACH | 1 | $3,000.00 | $2,374.52 | $1,098.00 | $4,300.00 | $1,900.00 | $2,246.00 | $1,803.90 |
| 335 | Tie in existing (SS) force main (4") (7063-7067) | EACH | 2 | $3,000.00 | $2,383.75 | $1,098.00 | $4,300.00 | $2,000.00 | $3,041.00 | $3,267.60 |
| 336 | Tie in existing (SS) gravity WWL (6") (7063-7068) | EACH | 1 | $3,000.00 | $1,909.56 | $979.00 | $3,900.00 | $2,100.00 | $2,527.57 | $584.85 |
| 337 | Tie in existing (SS) gravity WWL (8") (7063-7069) | EACH | 2 | $4,000.00 | $1,918.97 | $1,091.00 | $4,100.00 | $2,300.00 | $3,217.00 | $904.05 |
| 338 | Tie in existing (SS) gravity WWL (10") (7063-7070) | EACH | 1 | $5,000.00 | $1,932.43 | $1,169.00 | $4,000.00 | $2,400.00 | $3,456.00 | $3,491.25 |
| 339 | Abandon existing WWL (no PG) (7063-7071) | LF | 928 | $12.00 | $56.76 | $14.00 | $10.00 | $2.75 | $28.00 | $23.10 |
| 340 | Abandon existing WWL (6" & under)(PG) (7063-7072) | LF | 644 | $18.00 | $56.76 | $12.00 | $6.50 | $21.00 | $44.00 | $38.85 |
| 341 | Abandon existing WWL (8")(PG) (7063-7073) | LF | 2,984 | $20.00 | $56.76 | $12.00 | $27.00 | $23.00 | $34.00 | $39.90 |
| 342 | Abandon existing WWL (10")(PG) (7063-7074) | LF | 1,738 | $25.00 | $56.76 | $15.00 | $28.00 | $24.00 | $47.00 | $43.05 |
| 343 | Remove existing (manhole) (7063-7075) | EACH | 15 | $3,100.00 | $283.82 | $757.00 | $1,200.00 | $2,700.00 | $3,673.00 | $2,819.25 |
| 344 | Remove existing (cleanout) (7063-7076) | EACH | 6 | $1,500.00 | $113.53 | $631.00 | $930.00 | $400.00 | $1,151.00 | $543.90 |
| 345 | Pothole existing WW service (tie in) (7063-7077) | EACH | 22 | $3,100.00 | $575.80 | $600.00 | $2,300.00 | $1,600.00 | $3,428.00 | $1,876.35 |
| 346 | Temporary WW tie in (existing 4" to prop 8") (7063-7078) | EACH | 1 | $2,500.00 | $1,900.27 | $1,091.00 | $4,200.00 | $2,900.00 | $3,954.00 | $3,267.60 |
| 347 | Temporary WW tie in (existing 10" to prop 20") (7063-7079) | EACH | 1 | $8,000.00 | $22,255 | $1,183.00 | $4,900.00 | $6,400.00 | $8,042.00 | $5,209.05 |
| 348 | Pipe WTR(6")DR18(nup) (7063-7087) | LF | 687 | $70.00 | $163.48 | $122.00 | $76.00 | $130.00 | $92.00 | $113.40 |
| 349 | Pipe WTR(6")CL DR18(nup) (7063-7088) | LF | 96 | $90.00 | $60.42 | $84.00 | $76.00 | $140.00 | $115.99 | $113.40 |
| 350 | Pipe WTR(6")DR18(P) (7063-7089) | LF | 185 | $80.00 | $276.84 | $127.00 | $76.00 | $190.00 | $120.00 | $175.35 |
| 351 | Pipe WTR(6")CL DR18(P)(10" steel)open (7063-7090) | LF | 87 | $210.00 | $595.30 | $172.00 | $140.00 | $250.00 | $249.00 | $241.50 |
| 352 | Pipe WTR(6")CL DR18(10" steel)bore (7063-7091) | LF | 198 | $450.00 | $347.52 | $1,010.00 | $970.00 | $470.00 | $1,148.00 | $388.50 |
| 353 | Pipe WTR(8")DR18(nup) (7063-7092) | LF | 77 | $90.00 | $86.72 | $216.00 | $110.00 | $150.00 | $136.00 | $170.10 |
| 354 | Pipe WTR(8")CL DR18(nup) (7063-7093) | LF | 9 | $110.00 | $62.30 | $138.00 | $190.00 | $170.00 | $285.00 | $170.10 |
| 355 | Pipe WTR(8")CL DR18(P)(14" steel)open (7063-7094) | LF | 8 | $260.00 | $417.56 | $386.00 | $430.00 | $330.00 | $464.00 | $263.55 |
| 356 | Pipe WTR(8")CL DR18(14" steel)bore (7063-7095) | LF | 63 | $550.00 | $240.14 | $992.00 | $1,200.00 | $570.00 | $1,148.00 | $546.00 |
| 357 | Pipe WTR(10")DR18(P) (7063-7096) | LF | 92 | $125.00 | $501.89 | $71.00 | $140.00 | $220.00 | $190.00 | $218.40 |
| 358 | Pipe WTR(12")DR18(nup) (7063-7097) | LF | 3,117 | $125.00 | $182.47 | $131.00 | $130.00 | $190.00 | $148.00 | $152.25 |
| 359 | Pipe WTR(12")CL DR18(nup) (7063-7098) | LF | 538 | $200.00 | $244.05 | $129.00 | $130.00 | $230.00 | $289.00 | $168.00 |
| 360 | Pipe WTR(12")DR18(P) (7063-7099) | LF | 381 | $135.00 | $197.22 | $173.00 | $140.00 | $240.00 | $326.00 | $212.10 |
| 361 | Pipe WTR(12")CL DR18(P)(18" steel) open (7063-7100) | LF | 635 | $400.00 | $337.81 | $428.00 | $280.00 | $390.00 | $388.00 | $332.85 |
| 362 | Pipe WTR(12")CL DR18(20" steel) bore (7063-7101) | LF | 431 | $700.00 | $358.85 | $989.00 | $1,100.00 | $1,300.00 | $1,279.00 | $726.60 |
| 363 | Pipe WTR(12")CL DR18(unc) bore (7063-7102) | LF | 60 | $250.00 | $157.17 | $1,034.00 | $560.00 | $360.00 | $1,164.00 | $741.30 |
| 364 | Pipe WTR (MH casing)(20")(DR18-B) open (7063-7103) | LF | 144 | $230.00 | $194.93 | $297.00 | $290.00 | $310.00 | $378.00 | $779.10 |
| 365 | Valve (gate)(6") (7063-7104) | EACH | 12 | $3,000.00 | $1,591.92 | $3,681.00 | $1,900.00 | $3,600.00 | $2,677.00 | $2,238.60 |
| 366 | Valve (gate)(8") (7063-7105) | EACH | 5 | $4,000.00 | $2,243.02 | $4,436.00 | $2,500.00 | $4,500.00 | $3,547.00 | $2,993.55 |
| 367 | Valve (gate)(10") (7063-7106) | EACH | 1 | $5,000.00 | $3,364.16 | $7,197.00 | $3,600.00 | $5,700.00 | $4,678.00 | $4,168.50 |
| 368 | Valve (gate)(12") (7063-7107) | EACH | 27 | $5,500.00 | $3,994.79 | $4,500.00 | $4,500.00 | $7,100.00 | $5,505.00 | $4,956.00 |
| 369 | Final adjustment (gate valve)(2") (7063-7108) | EACH | 1 | $300.00 | $567.63 | $8,844.00 | $930.00 | $1,100.00 | $542.00 | $150.15 |
| 370 | Final adjustment (gate valve)(6") (7063-7109) | EACH | 14 | $650.00 | $567.63 | $1,160.00 | $930.00 | $1,100.00 | $542.00 | $682.50 |
| 371 | Final adjustment (gate valve)(10") (7063-7110) | EACH | 1 | $1,300.00 | $567.63 | $1,105.00 | $930.00 | $1,100.00 | $542.00 | $682.50 |
| 372 | Final adjustment (gate valve)(12") (7063-7111) | EACH | 22 | $2,000.00 | $567.63 | $1,123.00 | $930.00 | $1,100.00 | $542.00 | $682.50 |
| 373 | Valve (arv)(2") (7063-7112) | EACH | 3 | $8,000.00 | $4,561.00 | $9,192.00 | $7,700.00 | $9,500.00 | $8,007.00 | $7,399.35 |
| 374 | Fire hydrant assembly (7063-7113) | EACH | 10 | $9,000.00 | $5,923.71 | $9,215.00 | $7,000.00 | $11,000 | $8,178.00 | $8,911.35 |
| 375 | Fire hydrant assembly (long lead) (7063-7114) | EACH | 3 | $10,000 | $7,148.98 | $185,000 | $7,000.00 | $13,000 | $12,342 | $12,758 |
| 376 | Tracer wire riser (7063-7115) | EACH | 23 | $400.00 | $56.76 | $180.00 | $61.00 | $610.00 | $676.00 | $349.65 |
| 377 | Service WTR(3/4")EX 3/4"meter(long) (7063-7116) | EACH | 2 | $4,000.00 | $855.60 | $1,315.00 | $1,700.00 | $3,300.00 | $4,421.00 | $6,710.55 |
| 378 | Service WTR(3/4")EX 3/4"meter(short) (7063-7117) | EACH | 3 | $2,300.00 | $863.06 | $1,253.00 | $1,700.00 | $2,200.00 | $3,065.00 | $2,560.95 |
| 379 | Service WTR(1") EX 3/4" meter (long) (7063-7118) | EACH | 8 | $2,800.00 | $1,143.30 | $1,858.00 | $1,700.00 | $3,300.00 | $4,468.00 | $6,764.10 |
| 380 | Service WTR(1") EX 3/4" meter (short) (7063-7119) | EACH | 6 | $2,800.00 | $1,125.00 | $1,794.00 | $1,700.00 | $2,300.00 | $3,116.00 | $2,541.00 |
| 381 | Service WTR(2") EX 1.5" meter (long) (7063-7120) | EACH | 1 | $5,000.00 | $2,356.52 | $3,979.00 | $1,700.00 | $5,200.00 | $5,960.00 | $8,248.80 |
| 382 | Service WTR(2") EX 2" meter (short) (7063-7121) | EACH | 1 | $5,000.00 | $2,346.79 | $3,396.00 | $1,700.00 | $4,000.00 | $4,290.30 | $3,727.50 |
| 383 | Service WTR(1") new 3/4" meter (long) (7063-7122) | EACH | 3 | $4,700.00 | $1,244.64 | $2,300.00 | $1,700.00 | $3,300.00 | $4,506.00 | $6,799.80 |
| 384 | Service WTR(1") new 3/4" meter(short) (7063-7123) | EACH | 4 | $4,700.00 | $1,262.99 | $2,300.00 | $1,700.00 | $2,300.00 | $3,152.00 | $2,572.05 |
| 385 | Service WTR(2")two new 3/4" meter(LG) (7063-7124) | EACH | 1 | $7,000.00 | $2,583.94 | $4,276.00 | $2,800.00 | $2,300.00 | $8,557.00 | $7,455.00 |
| 386 | Service WTR(1")EX 3/4" SVC line(long) (7063-7125) | EACH | 1 | $2,800.00 | $5,319.54 | $1,842.00 | $1,700.00 | $2,300.00 | $4,345.00 | $6,730.50 |
| 387 | Service WTR(2") EX 2" SVC line (long) (7063-7126) | EACH | 1 | $6,200.00 | $12,033 | $2,903.00 | $2,800.00 | $5,500.00 | $4,855.00 | $7,271.25 |
| 388 | Pipe WTR(1")HDPE(P)(3" steel) open (7063-7127) | LF | 215 | $130.00 | $82.98 | $151.00 | $77.00 | $130.00 | $123.00 | $66.15 |
| 389 | Pipe WTR(1")HDPE(3" steel) bore (7063-7128) | LF | 427 | $200.00 | $144.62 | $444.00 | $110.00 | $300.00 | $514.00 | $183.75 |
| 390 | Pipe WTR(2")HDPE(P)(4" steel) open (7063-7129) | LF | 49 | $180.00 | $135.48 | $150.00 | $91.00 | $150.00 | $143.00 | $73.50 |
| 391 | Pipe WTR(2")HDPE(4" steel) bore (7063-7130) | LF | 117 | $235.00 | $185.60 | $442.00 | $140.00 | $300.00 | $487.00 | $192.15 |
| 392 | Tie in existing (WTR)(2") (7063-7131) | EACH | 2 | $3,000.00 | $1,286.09 | $1,908.00 | $480.00 | $2,300.00 | $1,934.00 | $1,953.00 |
| 393 | Tie in existing (WTR)(6") (7063-7132) | EACH | 8 | $4,000.00 | $912.85 | $3,373.00 | $2,200.00 | $3,900.00 | $3,078.00 | $5,790.75 |
| 394 | Tie in existing (WTR)(8") (7063-7133) | EACH | 2 | $5,000.00 | $1,022.62 | $1,610.00 | $2,300.00 | $4,000.00 | $4,001.00 | $6,132.00 |
| 395 | Tie in existing (WTR)(12") (7063-7134) | EACH | 2 | $5,500.00 | $1,433.62 | $3,237.00 | $2,700.00 | $6,100.00 | $4,505.00 | $8,253.00 |
| 396 | Abandon existing WL (no PG) (7063-7135) | LF | 1,428 | $10.00 | $28.39 | $9.00 | $8.50 | $2.75 | $15.00 | $23.10 |
| 397 | Abandon existing WL (6" & under)(PG) (7063-7136) | LF | 7,517 | $18.00 | $28.39 | $8.00 | $5.50 | $21.00 | $19.00 | $44.10 |
| 398 | Abandon existing WL (8")(PG) (7063-7137) | LF | 30 | $20.00 | $28.39 | $65.00 | $31.00 | $23.00 | $267.00 | $47.25 |
| 399 | Remove existing (water valve) (7063-7138) | EACH | 12 | $800.00 | $113.53 | $624.00 | $620.00 | $670.00 | $834.00 | $878.85 |
| 400 | Remove existing (meter & box) (7063-7139) | EACH | 8 | $1,200.00 | $113.53 | $702.00 | $460.00 | $470.00 | $1,138.00 | $150.15 |
| 401 | Remove existing (fire hydrant) (7063-7140) | EACH | 6 | $2,500.00 | $113.53 | $624.00 | $920.00 | $1,500.00 | $2,968.00 | $2,061.15 |
| 402 | Temporary pipe WTR(6")(CL DR18) (7063-7141) | LF | 450 | $90.00 | $71.47 | $69.00 | $110.00 | $150.00 | $96.00 | $40.95 |
| 403 | Temporary pipe WTR(6")CL DR18(10"steel)bore (7063-7142) | LF | 45 | $450.00 | $214.60 | $945.00 | $970.00 | $430.00 | $1,193.00 | $386.40 |
| 404 | Temporary pipe WTR(6")(CL DR18)unc bore (7063-7143) | LF | 150 | $180.00 | $129.32 | $944.00 | $810.00 | $190.00 | $1,105.00 | $312.90 |
| 405 | Temporary valve (gate)(6") (7063-7144) | EACH | 2 | $3,000.00 | $1,875.74 | $3,618.00 | $2,200.00 | $3,600.00 | $2,653.00 | $1,897.35 |
| 406 | Temporary fire hydrant (relocate)(existing) (7063-7145) | EACH | 3 | $9,000.00 | $5,187.79 | $4,191.00 | $2,000.00 | $4,500.00 | $5,709.00 | $9,601.20 |
| 407 | Temporary tie in existing (WTR)(6") (7063-7146) | EACH | 4 | $4,000.00 | $912.85 | $5,226.00 | $2,200.00 | $3,900.00 | $4,135.00 | $6,579.30 |
| 408 | Temporary service WTR(3/4") EX 3/4" meter (7063-7147) | EACH | 7 | $4,000.00 | $608.77 | $935.00 | $2,500.00 | $2,400.00 | $3,006.00 | $3,688.65 |
| 409 | Temporary service WTR(1") EX 1" SVC LN (7063-7148) | EACH | 1 | $4,700.00 | $1,153.70 | $1,014.00 | $3,300.00 | $2,500.00 | $3,006.00 | $3,688.65 |
| 410 | Pipe SS(8")DR26(8'-10')(P)(14" steel)open (7063-7149) | LF | 25 | $270.00 | $375.27 | $193.00 | $390.00 | $520.00 | $440.00 | $656.25 |
| 411 | Pipe SS(15")SDR26(20"steel)bore (7063-7150) | LF | 443 | $650.00 | $483.52 | $1,130.00 | $1,300.00 | $1,300.00 | $1,441.00 | $731.85 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.