Posillico Civil, Inc.: TxDOT bid record
Posillico Civil, Inc. submitted 66 bids on Texas DOT contracts in the data, from 07 OCT 2021 to 04 NOV 2026, and was the low bidder on 8 of them (12%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $434,475,426
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 3 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 10 | 3 | 30% |
| 2024 | 8 | 0 | 0% |
| 2025 | 21 | 3 | 14% |
| 2026 | 22 | 2 | 9% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Pharr District | 20 | 3 | 15% |
| Houston District | 15 | 2 | 13% |
| Austin District | 11 | 1 | 9% |
| San Antonio District | 10 | 1 | 10% |
| Lufkin District | 3 | 1 | 33% |
| Corpus Christi District | 2 | 0 | 0% |
| Zapata | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Laredo District | 1 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 58 | 28 (48%) | $5.25 | $5.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 51 | 23 (45%) | $90.00 | $110.00 |
| Reflectorized pavement marking type I (W)8"(solid)(100MIL) | 666-7024 | LF | 47 | 23 (49%) | $1.00 | $1.10 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 42 | 23 (55%) | $7.90 | $8.00 |
| Excavation (roadway) | 110-7001 | CY | 54 | 22 (41%) | $8.50 | $20.00 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 51 | 22 (43%) | $5.33 | $5.00 |
| Reflectorized pavement marker type II-C-R | 672-7006 | EACH | 39 | 22 (56%) | $5.80 | $5.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 49 | 18 (37%) | $1.00 | $1.00 |
| Reflectorized pavement marking type I (W)12"(solid)(100MIL) | 666-7030 | LF | 27 | 17 (63%) | $3.00 | $3.75 |
| Guardrail end treatment (install) | 544-7001 | EACH | 52 | 16 (31%) | $3,384.00 | $3,245.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 49 | 16 (33%) | $625.00 | $643.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 48 | 16 (33%) | $1.27 | $1.40 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Foremost Paving, Inc. | 20 | 16 of 20 |
| Ioc Company LLC | 18 | 12 of 18 |
| Webber, LLC | 17 | 12 of 17 |
| Hunter Industries, LTD. | 17 | 10 of 17 |
| James Construction Group, LLC | 15 | 8 of 15 |
| Texas Materials Group, Inc. | 15 | 12 of 15 |
| Pulice Construction, Inc. | 15 | 3 of 15 |
| CK Newberry, LLC | 12 | 5 of 12 |
| Zachry Construction Corporation | 10 | 2 of 10 |
| Harper Brothers Construction LLC | 10 | 8 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 8 of 12 | $39,994,995 | +32% |
| 07 OCT 2026 | A00132124 | Lufkin District | Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475) | 5 of 7 | $40,757,181 | +28% |
| 07 OCT 2026 | A00064192 | San Antonio District | Widen Road - Add Shoulders, US 87 (Bexar/Wilson County Line to FM 1346) | 6 of 8 | $48,887,304 | +23% |
| 02 SEP 2026 | A00121174 | Pharr District | New Arterial, SL 195 (NEW LOCATION, FM 649 to FM 3167) | 2 of 7 | $54,248,444 | +6.0% |
| 05 AUG 2026 | A00193142 | Austin District | Hazard Elimination & Safety, US 290 (0.275 MI W of FM 973 to 0.189 MI E of FM 973) | 5 of 6 | $9,403,875 | +10% |
| 02 JUL 2026 | A00064356 | Lufkin District | Highway Improvement, US 259 (Rusk County Line to SH 204) | 1 of 6 | $61,459,151 | Low, 2.0% under the second |
| 03 JUN 2026 | A00062698 | San Antonio District | Widen Road - Add Lanes, SH 123 (Cordova Ln. to IH 10) | 4 of 6 | $41,964,087 | +3.0% |
| 07 MAY 2026 | A00187130 | San Antonio District | Rehabilitate Existing Roadway, FM 1150 (FM 1104 to SH 80) | 4 of 4 | $19,135,567 | +34% |
| 07 MAY 2026 | A00183308 | Pharr District | Interstate Designation, US 281 (7.4 Miles North of SH 186 to 3.9 Miles North of SH 186) | 4 of 5 | $66,250,000 | +7.0% |
| 07 MAY 2026 | A00031457 | San Antonio District | Highway Improvement, IH 410 (At US 281/San Pedro to .) | 2 of 3 | $156,147,924 | 0.0% |
| 06 MAY 2026 | A00130695 | Houston District | Surfacing/Roadway Restoration, SL 494 (Via Principale Pkwy. to Royal Crossing Dr./Northpark Plaza Dr.) | 6 of 6 | $6,462,753 | +25% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 3 of 10 | $124,689,845 | +4.0% |
| 08 APR 2026 | A00197960 | Pharr District | Preventive Maintenance, FM 1419 (SH 4 to FM 511) | 4 of 5 | $8,475,185 | +8.0% |
| 07 APR 2026 | A00084334 | Laredo District | Construct New Road, SL 480 (0.259 MILES SOUTH OF US 57 to US 277 N) | 2 of 7 | $104,049,675 | +11% |
| 07 APR 2026 | A00059931 | San Antonio District | Widen Road - Add Lanes, SL 1604 (Macdona-Lacoste Rd. to US 90 W) | 1 of 4 | $55,859,370 | Low, 5.0% under the second |
| 07 APR 2026 | A00209575 | Pharr District | Preventive Maintenance, IH 69C (FM 2812 to FM 490) | 2 of 3 | $10,925,824 | +24% |
| 07 APR 2026 | A00211276 | Pharr District | ASPHALT PAVEMENT REPAIR, US0077 (DISTRICT WIDE to VARIOUS ROADWAYS) | 3 of 4 | $5,962,294 | +42% |
| 04 MAR 2026 | A00188698 | Houston District | Surfacing/Roadway Restoration, FM 517 (SH 146 to FM 646) | 6 of 7 | $4,050,779 | +22% |
| 05 FEB 2026 | A00135345 | Austin District | Reconstruct Existing Roadway, FM 487 (COLLEGE AVENUE to SH 195 BYPASS) | 2 of 10 | $3,790,532 | +4.0% |
| 05 FEB 2026 | A00193136 | Austin District | Hazard Elimination & Safety, FM 3405 (0.348 MI E of Ronald Reagan Blvd to 0.228 MI W of Georgetown Heights Dr) | 5 of 9 | $3,082,246 | +12% |
| 04 FEB 2026 | A00121975 | Houston District | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | 7 of 10 | $88,136,214 | +19% |
| 06 JAN 2026 | A00188847 | Houston District | Surfacing/Roadway Restoration, SH 225 (SL 8 to Miller Cut Off Rd) | 4 of 6 | $28,210,072 | +27% |
| 02 DEC 2025 | A00131922 | Pharr District | Rehabilitate Existing Roadway, FM 1421 (SH 100 to US 281) | 2 of 6 | $15,395,000 | +5.0% |
| 02 DEC 2025 | A00188143 | San Antonio District | Rehabilitate Existing Roadway, FM 1344 (CR 209 to Wilson/Karnes County Line) | 6 of 8 | $12,395,145 | +28% |
| 02 DEC 2025 | A00126695 | Pharr District | Preventive Maintenance, FM 493 (SH 107 to IH 2) | 4 of 5 | $15,371,307 | +37% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.