TxDOT contract A00197960 bid tabulation

Preventive Maintenance, FM 1419 (SH 4 to FM 511). Let by Texas DOT on April 8, 2026, Cameron, Pharr District. 5 bids received; low bid $7,826,503 by Ioc Company LLC, +8.1% against the engineer's estimate of $7,236,974.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ioc Company LLC$7,826,503Low+8.0%
2Earthworks Enterprise$8,324,953+6.0%+15%
3Foremost Paving, Inc.$8,467,569+8.0%+17%
4Posillico Civil, Inc.$8,475,185+8.0%+17%
5CK Newberry, LLC$9,299,607+19%+29%
TxDOT contract A00197960: bids by rank

Engineer's estimate: $7,236,974.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ioc Company LLC2. Earthworks Enterprise3. Foremost Paving, Inc.4. Posillico Civil, Inc.5. CK Newberry, LLC
1Removing concrete (mowstrip) (104-7004)CY1$1,250.00$290.00$443.22$160.00$5,000.00
2SP mixes SP-D sac-A PG76-22 (344-7064)TON45,130$118.15$139.00$125.00$124.77$130.00$140.00
3Flexible pavement structure repair(8") (351-7007)SY8,893$61.07$69.00$64.00$82.68$80.00$70.00
4Planing asphalt concrete pavement(2") (354-7051)SY395,872$1.00$0.85$2.00$2.70$1.25$1.00
5Riprap (mow strip)(4 in) (432-7013)CY39$591.57$770.00$621.00$813.05$400.00$850.00
6Mobilization (500-7001)LS1$350,000$1,000.00$380,000$350,000$580,000$875,000
7Barricades, signs and traffic handling (502-7001)MO7$5,000.00$3,000.00$3,000.00$7,500.00$10,000$30,000
8TMA (stationary) (505-7001)DAY140$61.90$0.10$300.00$100.06$100.00$400.00
9TMA (mobile operation) (505-7003)DAY140$84.51$1.00$350.00$0.01$200.00$25.00
10Biodegradable erosion control logs (install) (12") (506-7044)LF1,904$4.62$2.50$10.00$5.66$3.00$8.00
11Biodegradable erosion control logs (remove) (506-7046)LF1,904$1.33$0.10$3.00$1.72$1.80$2.00
12Metal W-beam guard fence (timber post) (540-7001)LF1,080$28.08$29.40$33.00$31.72$29.00$30.00
13Metal beam guard fence trans (thrie-beam) (540-7005)EACH3$2,038.18$2,092.00$2,353.00$2,211.90$2,000.00$2,500.00
14Downstream anchor terminal section (540-7015)EACH4$1,647.92$1,543.00$1,735.00$1,242.30$1,500.00$1,700.00
15Connector plate for thrie beam (540-7030)EACH3$1,186.00$662.00$744.00$747.40$660.00$725.00
16Remove metal beam guard fence (542-7001)LF1,117$4.08$4.50$5.00$3.03$4.50$5.00
17Remove terminal anchor section (542-7002)EACH3$250.00$300.00$337.00$222.20$300.00$330.00
18Remove downstream anchor terminal (542-7003)EACH3$303.32$300.00$337.00$232.30$300.00$330.00
19RM metal beam guard fence trans (thrie-beam) (542-7004)EACH1$250.00$300.00$337.00$262.60$300.00$330.00
20Guardrail end treatment (install) (544-7001)EACH7$3,479.21$3,681.00$4,141.00$3,610.75$3,680.00$4,000.00
21Guardrail end treatment (remove) (544-7003)EACH5$250.00$300.00$337.00$333.30$300.00$330.00
22Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH30$25.00$45.00$112.00$30.30$35.00$55.00
23Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH9,616$0.53$1.33$1.25$1.11$1.00$1.00
24Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH6,752$0.45$1.39$1.25$1.11$1.00$1.00
25Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF924$3.25$3.50$2.02$2.00$2.25
26Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF27,346$0.99$0.96$1.00$0.83$0.80$1.00
27Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF665$1.42$4.87$5.50$1.12$1.10$1.25
28Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF8,530$5.43$5.89$6.50$7.58$7.50$8.25
29Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF513$2.17$4.87$5.50$1.12$1.10$1.25
30Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF11,776$0.42$0.27$0.50$0.33$0.35$0.40
31Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF6,048$0.54$0.26$0.75$0.36$0.35$0.40
32Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF3,481$0.43$0.33$0.50$0.35$0.35$0.40
33Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF11,650$0.42$0.31$0.50$0.33$0.35$0.40
34Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF30$2.31$3.25$3.50$30.30$30.00$35.00
35Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF120$2.09$3.25$3.50$30.30$30.00$35.00
36Reflectorized pavement marking type III (Y)(6")(broken) (666-7249)LF30$2.25$3.25$3.50$30.30$30.00$35.00
37Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF26,185$0.64$0.59$0.75$0.75$0.75$1.00
38Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF18,466$0.73$1.00$0.75$0.75$1.00
39Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF7,734$0.54$0.73$1.00$0.89$0.90$1.00
40Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF51,774$0.60$0.63$0.75$0.69$0.70$1.00
41Prefabricated PM type B (W)(6")(broken)contrast (668-7012)LF30$11.94$8.93$10.00$95.95$95.00$105.00
42Prefabricated PM type C (W)(arrow) (668-7091)EACH115$131.41$213.08$236.00$146.45$145.00$160.00
43Prefabricated PM type C (W)(double arrow) (668-7093)EACH42$365.27$405.00$303.00$300.00$330.00
44Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH21$446.45$495.00$328.25$325.00$360.00
45Prefabricated PM type C (W)(word) (668-7103)EACH136$220.94$233.37$258.00$227.25$225.00$250.00
46Prefabricated PM type C (W)(RR crossing) (668-7108)EACH5$629.08$697.00$631.25$625.00$675.00
47Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH10$54.79$60.69$15.15$15.00$15.00
48Reflectorized pavement marker type I-C (672-7002)EACH754$4.70$3.86$4.00$7.58$7.50$10.00
49Reflectorized pavement marker type II-A-A (672-7004)EACH1,212$4.41$3.86$4.00$7.58$7.50$10.00
50Reflectorized pavement marker type II-C-R (672-7006)EACH2,051$3.86$4.00$7.58$7.50$9.00
51Eliminating existing PM & markers (4") (677-7001)LF300$0.10$2.23$2.50$0.56$0.55$0.75
52Eliminating existing PM & markers (24") (677-7008)LF3,002$2.19$3.04$3.50$4.04$4.00$4.50
53Vehicle LP detect (sawcut) (688-7004)LF6,293$14.66$13.50$16.00$14.70$17.50$30.00
54Bonding course (3007-7001)GAL27,712$3.50$3.00$9.00$2.84$6.50$4.00
TxDOT contract A00197960: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way