Earthworks Enterprise: TxDOT bid record

Earthworks Enterprise submitted 19 bids on Texas DOT contracts in the data, from 09 JUL 2020 to 05 AUG 2026, and was the low bidder on 4 of them (21%). When it was not low, its total sat a median +16% above the low bid.

Owner
Texas DOT
Low bid volume
$12,728,173
Latest bid
05 AUG 2026
Data through
19 NOV 2026
19Bids
4Low bids
21Win rate, percent
+16%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
20204250%
2021200%
2023100%
2024100%
20255240%
2026600%
Earthworks Enterprise, TxDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Work zone pavement marking SHT terminal (tab)type Y-2662-7114EACH1110 (91%)$0.65$1.41
Work zone pavement marking SHT terminal (tab)type W662-7112EACH1110 (91%)$0.75$1.45
Reflectorized pavement marker type II-A-A672-7004EACH157 (47%)$3.75$5.00
Barricades, signs and traffic handling502-7001MO196 (32%)$2,500.00$5,000.00
Driveways (ACP)530-7010SY96 (67%)$40.00$60.00
Reflectorized pavement marker type I-C672-7002EACH135 (38%)$4.25$5.00
Excavation (roadway)110-7001CY84 (50%)$7.00$20.00
Vegetative watering168-7001TGL64 (67%)$28.00$37.73
Riprap (mow strip)(4 in)432-7013CY123 (25%)$461.50$643.00
Prime coat (MC-30)310-7004GAL93 (33%)$5.25$6.42
Driveways (concrete)530-7006SY83 (38%)$67.00$110.00
Struct excavation (special)400-7005CY83 (38%)$83.00$80.65
Earthworks Enterprise, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Earthworks Enterprise, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 AUG 2026A00131912Pharr DistrictRehabilitate Existing Roadway, FM 907 (RANCHO BLANCO RD. to FM 3072)4 of 7$6,720,781+5.0%
02 JUL 2026A00183413Pharr DistrictConstruct Pedestrian Infrastructure, Various (Various Locations Districtwide to .)4 of 8$2,230,825+15%
03 JUN 2026A00217752Pharr DistrictMILL AND INLAY, US0281 (IH-2 to US 281 Military Highway)3 of 3$7,107,494+15%
02 JUN 2026A00193114Pharr DistrictHazard Elimination & Safety, FM 491 (0.77 Miles North of FM 2629 to West Uncle Peter's Rd.)6 of 7$9,286,974+21%
08 APR 2026A00197960Pharr DistrictPreventive Maintenance, FM 1419 (SH 4 to FM 511)2 of 5$8,324,953+6.0%
07 JAN 2026A00134752Pharr DistrictPreventive Maintenance, US 83 (CHARCO BLANCO RD. to FAIRGROUNDS RD.)3 of 3$2,797,786+18%
04 DEC 2025A00218471Pharr DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, FM 106 (FM106 to San Ramon Rd)5 of 6$647,092+69%
08 AUG 2025A00184386Pharr DistrictHazard Elimination & Safety, ODOMS LN (On Odoms Rd., From Baker Potts Rd. to 0.18 Miles East of Altas Palmas Rd.)1 of 6$978,047Low, 52% under the second
07 AUG 2025A00199485Pharr DistrictBicycle And Pedestrian Improvements, STENGER ST (Business 77 West to Fannin St.)1 of 8$1,627,355Low, 8.0% under the second
01 JUL 2025A00199763Pharr DistrictHazard Elimination & Safety, FM 1423 (BUS 83S to CR 3677 /End of State Maintenance)5 of 6$4,225,053+24%
01 MAY 2025A00209567Pharr DistrictPreventive Maintenance, IH 69C (Business 281 to FM 2812)4 of 4$8,662,912+35%
04 JAN 202401243014Pharr DistrictSL 499 Preventive maintenance from FM 106 to BU 77X3 of 3$9,271,251+19%
07 MAR 202303234031Pharr DistrictFM1847 Mill and inlay from DISTRICT WIDE to VARIOUS ROADWAYS3 of 4$5,351,992+29%
05 MAR 202103213207Pharr DistrictFM 2221 Rehabilitate existing roadway from 0.1 MILES WEST OF FM 492 to 0.33 MILES WEST OF SH 3643 of 5$3,590,074+15%
05 FEB 202102213203Pharr DistrictFM 1423 Preventive maintenance from IH-2 to BUS 834 of 5$5,862,801+9.0%
05 NOV 202011203202Pharr DistrictSH 100 Rehabilitation from S. MESQUITE ST. to 567 FT. EAST OF EBANO ST.1 of 7$4,728,316Low, 2.0% under the second
05 NOV 202011203232Pharr DistrictFM 88 Overlay from MILE 12 to IH-23 of 5$5,432,788+9.0%
05 AUG 202008203017Pharr DistrictIH 69E Construct pedestrian infrastructure from WHALLEN RD. to FM 29941 of 5$5,394,454Low, 11% under the second
09 JUL 202007203220Pharr DistrictFM 1732 Rehabilitate roadway from US 281 to IH-69E2 of 5$7,654,743+16%
Earthworks Enterprise: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy