TxDOT letting results, March 7, 2023
86 contracts let by Texas DOT on March 7, 2023, $372,480,665 in low bids, a median of 3 bidders per contract. On the 86 with an engineer's estimate, the low bid came in under it 52 times; median low bid -3.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 86
- Low bids, total
- $372,480,665
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 03233001 | SH 35 Construct new road from SH 35/SP 5, FROM IH 45 to GRIGGS ROAD | Houston District | 5 | Williams Brothers Construction Co., Inc. | $93,945,777 | $102,456,453 | +9.0% | -3.0% | TxDOT |
| 03233002 | FM 1450 Roadway rehabilitation from 8 MILES EAST OF US285 to PECOS COUNTY LINE | Odessa District | 2 | A. L. Helmcamp, Inc. | $81,336,502 | $96,379,959 | +18% | +45% | TxDOT |
| 03233003 | SH 183 Railroad crossing improvements from AT UPRR RAILROAD & UPRR SPUR | Fort Worth District | 4 | Ragle Construction, Inc. | $26,588,577 | $27,046,920 | +2.0% | +11% | TxDOT |
| 03233005 | BI 20-E Preventive maintenance from FM 1788 to 1 MILE EAST OF FM 1788 | Odessa District | 2 | Ragle Construction, Inc. | $23,137,298 | $26,698,821 | +15% | -5.0% | TxDOT |
| 03233006 | IH 35 Resurface roadway from OUSSETT ROAD to 0.3 MI N OF IH 410 | San Antonio District | 5 | Texas Materials Group, Inc. | $13,319,023 | $15,618,003 | +17% | -19% | TxDOT |
| 03233007 | FM 407 Rehabilitate existing roadway from WISE COUNTY LINE to FM156 | Dallas District | 5 | Eurovia Atlantic Coast LLC | $8,970,767 | $9,059,189 | +1.0% | 0.0% | TxDOT |
| 03233043 | US 87 Rehabilitate bridge from US 87 AT S 15TH AVE BRIDGE | Amarillo District | 2 | Gilvin-Terrill, LTD. | $6,968,415 | $8,944,119 | +28% | +12% | TxDOT |
| 03233008 | BU 87-M Preventive maintenance from IH 20 SFR to BI 20-G (3RD ST IN BIG SPRING) | Abilene District | 1 | RK Hall, LLC | $6,169,362 | +10% | TxDOT | ||
| 03234021 | SH0087 Dredging from BOLIVAR FERRY LANDING to BOLIVAR FERRY LANDING | Houston District | 1 | Callan Marine LTD | $5,984,000 | +5.0% | TxDOT | ||
| 03233011 | IH 20 Rehabilitate existing roadway from VARIOUS LOCATIONF FROM FM 47 to SH 19 | Tyler District | 3 | H. V. Caver, Inc. | $5,701,600 | $6,604,656 | +16% | -5.0% | TxDOT |
| 03233014 | FM 1005 Surfacing/roadway restoration from US 96, SOUTH to FM 1013 | Beaumont District | 1 | Texas Materials Group, Inc. | $4,779,350 | +8.0% | TxDOT | ||
| 03233013 | FM 174 Hazard elimination & safety from FM 3007 to FM 1288 SOUTH | Wichita Falls District | 4 | Eurovia Atlantic Coast LLC | $4,557,309 | $4,595,818 | +1.0% | +9.0% | TxDOT |
| 03233009 | SH 11 Intersection improvement from CULVER ST. to LIVE OAK ST. | Paris District | 2 | Highway 19 Construction LLC | $4,510,636 | $6,308,808 | +40% | -4.0% | TxDOT |
| 03233012 | US 377 Reconstruct existing roadway from EAST GRANBURY LAKE BRIDGE to EAST OLD ACTON HWY INTERSECTION | Fort Worth District | 2 | Northeastern Pavers, LLC | $4,495,837 | $5,281,209 | +17% | +17% | TxDOT |
| 03234031 | FM1847 Mill and inlay from DISTRICT WIDE to VARIOUS ROADWAYS | Pharr District | 4 | Ioc Company LLC | $4,139,780 | $4,173,078 | +1.0% | -8.0% | TxDOT |
| 03233004 | IH 69E Construct ramps from INDUSTRIAL BLVD. to LOOP 499 (PRIMERA RD.) | Pharr District | 3 | Foremost Paving, Inc. | $4,138,511 | $4,264,791 | +3.0% | -3.0% | TxDOT |
| 03233010 | IH 40 Hazard elimination & safety from CR 18, EAST to OKLAHOMA STATE LINE | Childress District | 6 | Gratiot Construction, LTD. | $3,733,819 | $3,752,201 | 0.0% | -27% | TxDOT |
| 03233016 | VA Hazard elimination & safety from VARIOUS LOCATIONS to TARRANT AND WISE CO | Fort Worth District | 7 | Talbran Enterprises LLC | $3,471,787 | $3,487,736 | 0.0% | 0.0% | TxDOT |
| 03233015 | VA Preventive maintenance from DISTRICTWIDE | Odessa District | 6 | L&L Company | $3,409,957 | $3,688,842 | +8.0% | -14% | TxDOT |
| 03233040 | US 175 Install/replace signs from W US 175 to SH 34 BUSINESS | Dallas District | 4 | Texas Materials Group, Inc. | $2,469,855 | $2,621,376 | +6.0% | -17% | TxDOT |
| 03233020 | PR 25A State park improvements from AT LAKE CORPUS CHRISTI STATE PARK | Corpus Christi District | 9 | J. Carroll Weaver, Inc. | $2,440,689 | $2,647,012 | +8.0% | +1.0% | TxDOT |
| 03233021 | VA Construct new roadway lanes from VARIOUS LOCATIONS IN JOHNSON CO | Fort Worth District | 5 | Jay Mills Contracting, Incorporated | $2,237,556 | $2,679,174 | +20% | +25% | TxDOT |
| 03233038 | US 59 Diamond grinding 4-lane highway from 4.0 MI SOUTH OF FM 2328 (S) to SH 11 | Atlanta District | 7 | Winding Road Construction, Inc. | $2,198,711 | $2,331,819 | +6.0% | -21% | TxDOT |
| 03234015 | SH0006 Thermoplastic pavement markings from FREESTONE SB TRUCK PARKING to FREESTONE SB TRUCK PARKING | Bryan District | 7 | Stripe Lines, Inc. | $2,175,650 | $2,328,650 | +7.0% | -10% | TxDOT |
| 03233034 | US 190 Intersection improvement from AT SH 137 WEST | San Angelo District | 2 | CK Newberry, LLC | $2,124,528 | $3,974,776 | +87% | +57% | TxDOT |
| 03233030 | IH 35 Resurface roadway from 0.55 MI SOUTH OF FM 2837 to FM 2837 | Waco District | 3 | Diamond Surface, Inc. | $1,969,296 | $2,285,626 | +16% | +26% | TxDOT |
| 03233022 | BU 82-F Bridge replacement from BU 82F to AT DRAW | Wichita Falls District | 3 | Hodges and Son Construction Company, Inc. | $1,786,207 | $2,113,524 | +18% | +12% | TxDOT |
| 03233018 | VA Furnish & install dynamic message signs from VARIOUS LOCATIONS DISTRICTWIDE | Amarillo District | 2 | Mica Corporation | $1,771,464 | $2,003,898 | +13% | +23% | TxDOT |
| 03233017 | US 83 Preventive maintenance from 250 FT SOUTH OF JIM NED CREEK to OVALO WATER STORAGE FACILITY | Abilene District | 4 | J. H. Strain & Sons, Inc. | $1,760,154 | $1,777,376 | +1.0% | -29% | TxDOT |
| 03233019 | IH 10 Hazard elimination & safety from IH 37 to IH 410 | San Antonio District | 7 | D&G Energy Corporation | $1,631,615 | $1,754,871 | +8.0% | -27% | TxDOT |
| 03233027 | SH 81 Bridge maintenance from AT LITTLE HACKBERRY CREEK to (STR #077) | Waco District | 6 | Pmco Construction LLC | $1,619,000 | $1,629,052 | +1.0% | -7.0% | TxDOT |
| 03234010 | US0096 Mowing highway right of way from JASPER COUNTY to JASPER COUNTY | Beaumont District | 3 | P-Ville, Incorporated | $1,535,410 | $1,574,812 | +3.0% | +25% | TxDOT |
| 03233024 | IH 37 Hazard elimination & safety from SH 358 to FM 2292 | Corpus Christi District | 5 | Vaca Underground Utilities Inc | $1,438,651 | $1,484,337 | +3.0% | -6.0% | TxDOT |
| 03234003 | IH0040 Full depth concrete repair from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 2 | O. Trevino Construction, LLC | $1,228,700 | $1,336,000 | +9.0% | -1.0% | TxDOT |
| 03234032 | US0080 Hot mix from MINEOLA MTCE SECTION to WOOD COUNTY | Tyler District | 1 | Longview Bridge and Road, LTD. | $1,180,400 | +9.0% | TxDOT | ||
| 03234007 | IH0035 Asphalt from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 1 | Ergon Asphalt & Emulsions, Inc. | $1,153,870 | -1.0% | TxDOT | ||
| 03233033 | VA Preventive maintenance from DISTRICTWIDE | El Paso District | 3 | Dan Williams Company | $1,135,875 | $1,294,616 | +14% | +2.0% | TxDOT |
| 03234012 | IH0010 Mowing highway right of way from CHAMBERS COUNTY to CHAMBERS COUNTY | Beaumont District | 2 | Wayne Yancey, Inc. | $1,092,495 | $1,606,948 | +47% | -3.0% | TxDOT |
| 03234045 | US0380 Reflectorized pavement markings & markers from VARIOUS LOCATIONS IN to WISE AND JACK COUNTIES | Fort Worth District | 4 | Stripe-A-Zone, LLC | $1,087,392 | $1,160,219 | +7.0% | -11% | TxDOT |
| 03233026 | CS Hazard elimination & safety from IN SAN ANTONIO ON SAN PEDRO AVE to AT SAHARA DR | San Antonio District | 4 | E-Z Bel Construction, LLC | $1,086,718 | $1,177,786 | +8.0% | -9.0% | TxDOT |
| 03234011 | US0090 Mowing highway right of way from LIBERTY COUNTY to LIBERTY COUNTY | Beaumont District | 4 | Yellowstone Landscape - Central, Inc. | $1,077,120 | $1,534,576 | +42% | -10% | TxDOT |
| 03234033 | US0080 Hot mix from VARIOUS LOCATIONS IN THE CANTON MTC to IN VAN ZANDT COUNTY | Tyler District | 2 | Texas Materials Group, Inc. | $1,016,100 | $1,195,250 | +18% | -4.0% | TxDOT |
| 03234036 | SH0164 Base failure pavement repair from VARIOUS LOCATIONS to IN LIMESTONE COUNTY | Waco District | 5 | Big Creek Construction, LTD. | $1,015,395 | $1,052,611 | +4.0% | -5.0% | TxDOT |
| 03233029 | US 183 Resurface roadway from CYPRESS CREEK RD to AVERY RANCH BLVD | Austin District | 3 | Texas Materials Group, Inc. | $995,253 | $1,026,833 | +3.0% | +19% | TxDOT |
| 03234038 | US0084 Hot mix from VARIOUS LOCATIONS to IN CORYELL COUNTY | Waco District | 3 | Texas Materials Group, Inc. | $965,375 | $1,011,738 | +5.0% | -1.0% | TxDOT |
| 03234037 | US0084 Hot mix from VARIOUS ROADWAYS to IN MCLENNAN COUNTY | Waco District | 3 | Knife River Corporation - South | $957,300 | $1,010,835 | +6.0% | -9.0% | TxDOT |
| 03233031 | CR Bridge replacement from ON CR 255 (LOCAL ROAD 301) to AT OAK BRANCH | Bryan District | 4 | Knife River Corporation - South | $946,425 | $1,026,885 | +9.0% | +13% | TxDOT |
| 03233028 | VA Hazard elimination & safety from VARIOUS LOCATIONS IN to ANDERSON, HENDERSON, AND VAN ZANDT | Tyler District | 2 | Vaca Underground Utilities Inc | $932,150 | $1,300,895 | +40% | +1.0% | TxDOT |
| 03234008 | FM0685 Traffic signal maintenance from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 1 | Austin Traffic Signal Construction Co., Inc. | $894,172 | -11% | TxDOT | ||
| 03233023 | VA Striping-specialty markings from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT | Lubbock District | 3 | L&L Company | $881,212 | $1,694,302 | +92% | -17% | TxDOT |
| 03234018 | IH0035 Pothole repair from VARIOUS ROADWAYS IN to DENTON COUNTY MAINTENANCE SECTION | Dallas District | 1 | Pathfield Investments LLC | $864,000 | +56% | TxDOT | ||
| 03233032 | CR Bridge replacement from ON CR 452 AT BRANCH OF MUSTANG CRK to STR# 14-246-0-AA04-13-001 | Austin District | 3 | Knife River Corporation - South | $769,807 | $834,580 | +8.0% | +15% | TxDOT |
| 03234026 | US0082 Reflective pavement markings (long line) from VARIOUS LOCATIONS IN to PARIS DISTRICT | Paris District | 8 | Reynolds & Kay, LTD. | $769,090 | $835,063 | +9.0% | -24% | TxDOT |
| 03234034 | US0259 Rock/riprap from ANDERSON, HENDERSON, CHEROKEE, SMIT to RUSK, GREGG, VAN ZANDT & WOOD CO. | Tyler District | 2 | Touchstone Resources, LLC | $756,000 | $786,875 | +4.0% | +4.0% | TxDOT |
| 03234022 | IH0045 Drainage improvement and/or repairs from I 45 WALKER C/L to I 45 HARRIS C/L | Houston District | 7 | Shalom Services Corporation | $713,974 | $742,450 | +4.0% | +4.0% | TxDOT |
| 03234016 | SL0012 Repair/replace concrete barrier from VARIOUS ROADWAYS IN to WEST DALLAS COUNTY MAINTENANCE SECT | Dallas District | 3 | Gibson & Associates, Inc. | $712,950 | $797,460 | +12% | -12% | TxDOT |
| 03234013 | US0069 Mowing highway right of way from TYLER COUNTY to TYLER COUNTY | Beaumont District | 3 | Ace Contractors, Inc. | $638,500 | $933,300 | +46% | -8.0% | TxDOT |
| 03233036 | FM 1804 Bridge replacement from AT BLACK CREEK, .25 MI S OF US 80 to STR# 102500227401001 | Tyler District | 8 | THK Construction LLC | $634,568 | $665,731 | +5.0% | -12% | TxDOT |
| 03234027 | US0082 Dense graded hot mix from 0.001 to LAMAR COUNTY | Paris District | 2 | RK Hall, LLC | $632,500 | $714,450 | +13% | -5.0% | TxDOT |
| 03234028 | US0069 Dense graded hot mix from 0.001 to RAINS COUNTY | Paris District | 3 | Texas Materials Group, Inc. | $620,500 | $621,250 | 0.0% | -2.0% | TxDOT |
| 03233037 | CS Bridge replacement from AT DRAINAGE DITCH to STR#201810C01835003 | Beaumont District | 5 | Cross Plus Construction, LLC | $601,425 | $615,509 | +2.0% | -2.0% | TxDOT |
| 03234039 | SH0006 Base failure pavement repair from VARIOUS LOCATIONS to IN FALLS COUNTY | Waco District | 4 | Big Creek Construction, LTD. | $597,313 | $604,127 | +1.0% | -1.0% | TxDOT |
| 03234035 | SH0031 Large sign replacement from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | Tyler District | 2 | Cross Plus Construction, LLC | $577,920 | $1,144,600 | +98% | -9.0% | TxDOT |
| 03233035 | CR Bridge replacement from CR 235 AT DRY CREEK | San Antonio District | 6 | Delgado'S Contractors, LLC | $557,522 | $605,240 | +9.0% | +7.0% | TxDOT |
| 03233039 | VA Bridge maintenance from FY 2024 NON-SITE BRIDGE REPAIRS TRA to FY 2024 NON-SITE BRIDGE REPAIRS TRA | Austin District | 5 | American Infrastructure Maintenance Management LLC | $549,976 | $566,302 | +3.0% | +32% | TxDOT |
| 03234029 | US0271 Emulsion from 0.001 to LAMAR COUNTY | Paris District | 1 | Ergon Asphalt & Emulsions, Inc. | $536,790 | -2.0% | TxDOT | ||
| 03234017 | US0077 Bridge preventative maintenance from AT CHAMBERS CREEK to ON US 77 | Dallas District | 9 | Shalom Services Corporation | $509,810 | $566,777 | +11% | -16% | TxDOT |
| 03234040 | SH0006 Hot mix from VARIOUS LOCATIONS to IN FALLS COUNTY | Waco District | 3 | Knife River Corporation - South | $490,190 | $512,705 | +5.0% | -5.0% | TxDOT |
| 03234041 | US0077 Hot mix from VICTORIA CO, ETC. | Yoakum District | 4 | Brauntex Materials, Inc. | $480,000 | $559,500 | +17% | -15% | TxDOT |
| 03234042 | US0183 Hot mix from DEWITT COUNTY | Yoakum District | 4 | Brauntex Materials, Inc. | $480,000 | $486,000 | +1.0% | -11% | TxDOT |
| 03234030 | US0082 Pavement markings from VARIOUS LOCATIONS IN to PARIS DISTRICT | Paris District | 4 | Reynolds & Kay, LTD. | $471,520 | $501,430 | +6.0% | -10% | TxDOT |
| 03233044 | VA Install/replace signs from DISTRICTWIDE | Beaumont District | 7 | Vaca Underground Utilities Inc | $464,333 | $495,719 | +7.0% | -12% | TxDOT |
| 03234043 | US0077 Hot-mix cold-laid from LAVACA COUNTY | Yoakum District | 4 | Brauntex Materials, Inc. | $450,000 | $458,000 | +2.0% | -6.0% | TxDOT |
| 03234020 | IH0010 Hot mix from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 1 | Jobe Materials, L.P. | $439,500 | +8.0% | TxDOT | ||
| 03234009 | US0087 Mowing highway right of way from VARIOUS LOCATIONS IN GILLESPIE, to BLANCO AND LLANO COUNTIES | Austin District | 2 | P-Ville, Incorporated | $428,481 | $556,104 | +30% | +9.0% | TxDOT |
| 03234023 | IH0010 Mowing highway right of way from VARIOUS HIGHWAYS IN WEST HARRIS CO. to VARIOUS HIGHWAYS IN WEST HARRIS CO. | Houston District | 1 | Yellowstone Landscape - Central, Inc. | $423,504 | -7.0% | TxDOT | ||
| 03234019 | US0287 Ditch cleaning and reshaping from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION | Dallas District | 1 | Texas Drainage Inc. | $421,750 | -20% | TxDOT | ||
| 03234014 | IH0010 Mowing highway right of way from NORTH JEFFERSON COUNTY to NORTH JEFFERSON COUNTY | Beaumont District | 3 | Wayne Yancey, Inc. | $416,210 | $645,984 | +55% | +2.0% | TxDOT |
| 03234006 | IH0040 Metal beam guard fence repair from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 3 | Ross Sa Enterprise LLC | $394,945 | $497,375 | +26% | -34% | TxDOT |
| 03234002 | IH0020 Mowing highway right of way from VARIOUS LOCATIONS IN to URBAN TAYLOR COUNTY | Abilene District | 2 | Abescape Group LLC | $382,659 | $503,160 | +31% | +16% | TxDOT |
| 03234001 | US0180 Mowing highway right of way from VARIOUS LOCATIONS IN to JONES COUNTY | Abilene District | 3 | Abescape Group LLC | $364,980 | $367,725 | +1.0% | -4.0% | TxDOT |
| 03234044 | US0077 Aggregate from FAYETTE, LAVACA, DEWITT, AND to GONZALES COUNTIES | Yoakum District | 3 | Colorado Materials, LTD. | $312,300 | $314,810 | +1.0% | -2.0% | TxDOT |
| 03233041 | SH 36 Landscape improvement from SH 36 to BUS 36 | Waco District | 2 | Cross Plus Construction, LLC | $291,325 | $430,701 | +48% | +12% | TxDOT |
| 03234024 | US0062 Emulsion from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 1 | Ergon Asphalt & Emulsions, Inc. | $266,700 | -23% | TxDOT | ||
| 03234025 | US0084 Emulsion from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 1 | Ergon Asphalt & Emulsions, Inc. | $193,050 | -19% | TxDOT | ||
| 03233042 | US 62 Hazard elimination & safety from 0.1 MI W OF KILLARMEY ST to 0.1 MI E OF WEDGEWOOD DR | El Paso District | 2 | Ztex Construction, Inc. | $103,530 | $242,623 | +134% | +3.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way