American Infrastructure Maintenance Management LLC: TxDOT bid record
American Infrastructure Maintenance Management LLC submitted 37 bids on Texas DOT contracts in the data, from 13 OCT 2020 to 08 JUL 2026, and was the low bidder on 12 of them (32%). When it was not low, its total sat a median +48% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $7,224,268
- Latest bid
- 08 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2022 | 7 | 5 | 71% |
| 2023 | 10 | 3 | 30% |
| 2024 | 5 | 3 | 60% |
| 2025 | 8 | 1 | 13% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Corpus Christi District | 5 | 2 | 40% |
| Houston District | 4 | 1 | 25% |
| Lufkin District | 4 | 2 | 50% |
| Beaumont District | 3 | 1 | 33% |
| Tyler District | 3 | 0 | 0% |
| San Antonio District | 3 | 0 | 0% |
| Bryan District | 2 | 1 | 50% |
| Austin District | 2 | 2 | 100% |
| Waco District | 2 | 1 | 50% |
| Brownwood District | 2 | 0 | 0% |
| Laredo District | 1 | 0 | 0% |
| Odessa District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 21 | 6 (29%) | $250.00 | $230.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 5 | 4 (80%) | $1.00 | $1.00 |
| Riprap (stone protection)(18 in) | 432-7043 | CY | 5 | 4 (80%) | $205.00 | $200.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 19 | 3 (16%) | $10,000 | $5,000.00 |
| Flowable backfill | 401-7001 | CY | 9 | 3 (33%) | $450.00 | $350.00 |
| TMA (mobile operation) | 505-7003 | DAY | 7 | 3 (43%) | $550.00 | $291.17 |
| Mobilization (callout) | 500-7002 | EACH | 7 | 3 (43%) | $3,000.00 | $688.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 5 | 3 (60%) | $5.00 | $4.00 |
| Portable changeable message sign | 503-7001 | DAY | 14 | 2 (14%) | $147.50 | $100.00 |
| Concrete structure repair (vertical & overhead) | 429-7007 | SF | 12 | 2 (17%) | $212.50 | $220.00 |
| Cleaning and sealing existing joints | 438-7001 | LF | 8 | 2 (25%) | $55.00 | $44.00 |
| Removing concrete (riprap) | 104-7006 | SY | 6 | 2 (33%) | $72.50 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| SCR Civil Construction, LLC | 10 | 2 of 10 |
| Garret Shields Infrastructure | 8 | 6 of 8 |
| Structural Integrity Group LLC | 6 | 2 of 6 |
| Crackseal of Texas, LLC | 5 | 1 of 5 |
| MB Western Industrial Contracting Co. | 5 | 1 of 5 |
| Built Right Construction of Oklahoma, LLC | 5 | 1 of 5 |
| Roy Jorgensen Associates, Inc. | 4 | 3 of 4 |
| Relmco, Inc. | 4 | 4 of 4 |
| Icos Management, LLC | 4 | 1 of 4 |
| Scout 5 Construction LLC | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 JUL 2026 | A00218501 | Yoakum District | DEBRIS REMOVAL, BU0059R (Wharton, Calhoun, Colorado, Gonzales, to Jackson, and Lavaca Counties) | 6 of 9 | $232,276 | +52% |
| 07 JUL 2026 | A00220006 | Tyler District | TREE TRIMMING AND BRUSH REMOVAL, US0079 (Various Locations in to Rusk County.) | 2 of 6 | $212,242 | +13% |
| 07 JUL 2026 | A00220009 | Tyler District | TREE TRIMMING AND BRUSH REMOVAL, US0069 (Various Locations in to Wood County.) | 4 of 6 | $225,399 | +26% |
| 02 JUN 2026 | A00196825 | Corpus Christi District | Bridge Maintenance, Various (at Various Locations to in Goliad and Karnes Counties) | 9 of 14 | $263,530 | +48% |
| 07 JAN 2026 | A00213720 | Corpus Christi District | Install/Replace Signs, Various (Various locations to San Patricio, Nueces Co.) | 5 of 6 | $60,000 | +143% |
| 06 JAN 2026 | A00196608 | Beaumont District | Install/Replace Signs, Various (DISTRICT WIDE to .) | 6 of 12 | $284,893 | +18% |
| 18 DEC 2025 | A00217676 | Paris District | POTHOLE REPAIR, US0075 (Various locations in to Grayson County) | 4 of 4 | $613,500 | +62% |
| 17 DEC 2025 | A00218364 | Fort Worth District | DELINEATOR INSTALLATION, IH0020 (Various Locations in to South Tarrant County) | 9 of 9 | $409,654 | +126% |
| 15 OCT 2025 | A00217699 | Lufkin District | DEBRIS REMOVAL, US0059 (POLK, SAN JAC, ANG, NAC, SHE to VARIOUS LOCATIONS) | 3 of 5 | $792,000 | +11% |
| 17 SEP 2025 | A00217548 | San Antonio District | PICNIC AREA MAINTENANCE, IH0010 (VARIOUS LOCATIONS IN KERR, to COMAL, KENDALL, AND BANDERA COUNTIES) | 9 of 9 | $1,190,624 | +127% |
| 17 SEP 2025 | A00217528 | San Antonio District | DEBRIS REMOVAL, IH0035 (VARIOUS LOCATIONS IN to SAN ANTONIO DISTRICT) | 11 of 11 | $1,446,120 | +145% |
| 04 SEP 2025 | A00212790 | Brownwood District | Hazard Elimination & Safety, SH 36 (0.4 MI W. OF FM 587 to CR 274) | 10 of 10 | $249,800 | +498% |
| 04 SEP 2025 | A00212789 | Brownwood District | Hazard Elimination & Safety, FM 500 (CR205 to CR211) | 12 of 12 | $575,400 | +508% |
| 13 AUG 2025 | A00214740 | Dallas District | POTHOLE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | 1 of 2 | $430,875 | Low, 151% under the second |
| 06 MAR 2024 | 03243215 | Odessa District | VA Cyclic bridge maintenance from DISTRICTWIDE | 1 of 2 | $2,165,724 | Low, 18% under the second |
| 06 MAR 2024 | 03243220 | Waco District | VA Bridge maintenance from VARIOUS to VARIOUS | 1 of 4 | $1,817,857 | Low, 8.0% under the second |
| 06 MAR 2024 | 03243225 | Abilene District | IH 20 Bridge maintenance from VARIOUS LOCATIONS | 7 of 7 | $1,558,460 | +177% |
| 06 MAR 2024 | 03243229 | Houston District | IH 69 Rehabilitate bridge from SL 8 SOUTH to IH 610 SOUTH | 1 of 8 | $670,070 | Low, 1.0% under the second |
| 01 FEB 2024 | 02244024 | Laredo District | US0083 Bridge preventative maintenance from VARIOUS to VARIOUS | 4 of 5 | $1,383,840 | +50% |
| 12 SEP 2023 | 09231702 | Bryan District | SH0047 Bridge scour repair from SH 47 SB to SH 47 SB | 1 of 6 | $115,710 | Low, 3.0% under the second |
| 07 SEP 2023 | 09233231 | Lufkin District | VA Bridge maintenance from VARIOUS LOCATIONS DISTRICTWIDE | 2 of 4 | $670,000 | +4.0% |
| 03 AUG 2023 | 08233251 | Waco District | CS Rehabilitate bridge and approaches from W CENTRAL AVE @ NOLAN CRK to (MAP #1 BELTON) | 2 of 3 | $967,857 | +10% |
| 27 JUN 2023 | 06233421 | San Antonio District | VA Bridge maintenance from VARIOUS LOCATIONS DISTRICTWIDE | 2 of 4 | $2,500,374 | +26% |
| 27 JUN 2023 | 06233454 | Corpus Christi District | US 181 Bridge maintenance from NB AND SB FRONTAGE ROADS to AT POESTA CREEK | 8 of 8 | $310,675 | +118% |
| 02 JUN 2023 | 06234206 | Houston District | IH0610 Total maintenance from IH610 to IH45 | 3 of 3 | $9,984,500 | +41% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.