TxDOT letting results, June 27, 2023
52 contracts let by Texas DOT on June 27, 2023, $661,381,585 in low bids, a median of 4 bidders per contract. On the 52 with an engineer's estimate, the low bid came in under it 33 times; median low bid -4.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 52
- Low bids, total
- $661,381,585
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 06233402 | US 59 Highway improvement from FM 2914 to LIBERTY C/L | Lufkin District | 2 | Webber, LLC | $189,820,654 | $192,087,573 | +1.0% | +8.0% | TxDOT |
| 06233404 | BU 90-U Reconstruct and widen from 4 to 6 lanes from IH 610, NE to EAST OF MESA RD (OLD FM 527) | Houston District | 5 | Balfour Beatty Infrastructure, Inc. | $62,500,910 | $65,586,482 | +5.0% | +22% | TxDOT |
| 06233405 | US 175 Interchange improvement from WEST OF FM 148 BYPASS to EAST OF FM 148 BYPASS | Dallas District | 2 | Granite Construction Company | $60,049,999 | $62,420,227 | +4.0% | +4.0% | TxDOT |
| 06233457 | CR Widen non-freeway from INDIANA AVE to US 87 | Lubbock District | 2 | Webber, LLC | $37,998,646 | $42,541,762 | +12% | +14% | TxDOT |
| 06233407 | FM 1281 Intersection improvement from HORIZON BLVD AT DARRINGTON INTERSEC | El Paso District | 2 | Jordan Foster Construction, LLC | $36,413,140 | $38,908,191 | +7.0% | +5.0% | TxDOT |
| 06233403 | SH 288 Install/upgrade drainage structure(s) from IH 69 to NORTH MACGREGOR WAY | Houston District | 5 | Main Lane Industries LTD. | $33,795,218 | $37,750,000 | +12% | -20% | TxDOT |
| 06233409 | IH 20 Replace bridges and approaches from 0.10 MI NE OF REEVES C/L (PECOS RIV to 0.25 MI SW OF FM 516 | Odessa District | 4 | James Construction Group, LLC | $28,745,655 | $32,593,383 | +13% | -7.0% | TxDOT |
| 06233408 | SH 242 Intersection improvement from FM 1488 to IH 45 | Houston District | 4 | Posillico Civil, Inc. | $28,674,823 | $32,847,818 | +15% | -7.0% | TxDOT |
| 06233410 | SH 4 Rehabilitate existing roadway from IH-69E to SH 48 | Pharr District | 3 | Posillico Civil, Inc. | $20,955,781 | $24,028,395 | +15% | -2.0% | TxDOT |
| 06233411 | FM 646 Hazard elimination & safety from SH 6 to FM 2004 | Houston District | 1 | Texas Materials Group, Inc. | $16,604,494 | +8.0% | TxDOT | ||
| 06233414 | FM 186 Rehabilitate existing roadway from 0.3 MI SOUTH OF BRADSHAW RD to CASTELLAW ROAD | Laredo District | 3 | Anderson Columbia Co., Inc. | $13,415,969 | $13,633,986 | +2.0% | +8.0% | TxDOT |
| 06233413 | FM 1425 Rehabilitate existing roadway from MILE 12 N. RD. to IH-2 | Pharr District | 6 | Asago, LLC | $13,257,196 | $13,309,822 | 0.0% | -9.0% | TxDOT |
| 06233415 | FM 2120 Rehabilitate existing roadway from CR 2235 to SH 37 | Paris District | 4 | A. K. Gillis & Sons, LLC | $9,798,191 | $9,828,455 | 0.0% | -6.0% | TxDOT |
| 06233412 | FM 879 Rehabilitate existing roadway from IH 45 to W OF FM 1722 | Dallas District | 3 | Ed Bell Construction Company | $8,156,479 | $8,282,809 | +2.0% | +9.0% | TxDOT |
| 06233416 | SH 342 Rehabilitate existing roadway from BELT LINE RD to ELLIS COUNTY LINE | Dallas District | 5 | Foutsco Paving Company, LLC | $7,856,752 | $8,820,155 | +12% | -10% | TxDOT |
| 06233426 | SH 176 Intersection improvement from AT FM 829 | Odessa District | 5 | Jones Bros. Dirt & Paving Contractors, Inc. | $5,880,108 | $6,805,089 | +16% | -4.0% | TxDOT |
| 06233419 | RM 1376 Hazard elimination & safety from RM 473 to 0.8 MI SOUTH OF UPPER SISTERDALE RD | San Antonio District | 5 | Hunter Industries, LTD. | $5,653,830 | $6,135,557 | +9.0% | -6.0% | TxDOT |
| 06233418 | SH 54 Construct bridge from 1500 FT N OF CROSSING to 1500 FT S OF CROSSING | El Paso District | 2 | Dan Williams Company | $5,340,875 | $5,838,214 | +9.0% | -15% | TxDOT |
| 06233417 | US 290 Hazard elimination & safety from LEE C/L to WASHINGTON C/L | Yoakum District | 3 | Massana Construction Inc. | $5,309,909 | $5,606,816 | +6.0% | -10% | TxDOT |
| 06233424 | SH 358 Resurface roadway from AYERS to AIRLINE | Corpus Christi District | 2 | Anderson Columbia Co., Inc. | $4,825,099 | $6,341,797 | +31% | 0.0% | TxDOT |
| 06233425 | VA Repair roadway from VARIOUS LOCATIONS to WITHIN THE FORT WORTH DISTRICT | Fort Worth District | 1 | O. Trevino Construction, LLC | $4,647,055 | +9.0% | TxDOT | ||
| 06233420 | CR Bridge replacement from CR 35, HITTS CREEK TRIB, STR NO 104 | Tyler District | 7 | Baker & Company Construction, LLC | $4,280,740 | $4,389,692 | +3.0% | -31% | TxDOT |
| 06233427 | FM 1179 Construct pedestrian infrastructure from FM 2818 to SH 47 | Bryan District | 9 | Larry Young Paving, Inc. | $4,034,959 | $4,592,733 | +14% | -2.0% | TxDOT |
| 06233428 | FM 457 Adding shoulders with no added capacity from FM 2611 to CANEY DRIVE | Yoakum District | 5 | James Construction Group, LLC | $3,978,936 | $4,113,583 | +3.0% | +21% | TxDOT |
| 06233423 | VA Reflectorized pvmt mrks &mrkrs from VARIOUS LOCATIONS to IN DALLAS COUNTY | Dallas District | 3 | Stripe-A-Zone, LLC | $3,959,735 | $5,226,138 | +32% | -19% | TxDOT |
| 06233422 | US 259 Install raised median from TRYON RD to E HAWKINS PKWY | Tyler District | 3 | Reynolds & Kay, LTD. | $3,787,211 | $4,124,160 | +9.0% | -27% | TxDOT |
| 06233437 | VA Install illumination from AT VARIOUS LOCATIONS IN CORPUS DIST | Corpus Christi District | 6 | Traf-Tex, Inc. | $3,091,074 | $3,545,996 | +15% | -26% | TxDOT |
| 06233429 | SH 20 Hazard elimination & safety from DPNIPHAN to IH 10 | El Paso District | 2 | Martinez Bros. Contractors, LLC | $3,070,094 | $3,374,066 | +10% | -5.0% | TxDOT |
| 06233455 | US 83 Construct pedestrian infrastructure from LOOP 517 to 0.87 MI SOUTH OF LOOP 517 | Laredo District | 2 | Relmco, Inc. | $2,887,281 | $3,003,877 | +4.0% | +9.0% | TxDOT |
| 06233434 | CR Construct new road from CR 119 to 0.45 MILES EAST OF CR 119 | Austin District | 4 | Relmco, Inc. | $2,578,219 | $2,675,623 | +4.0% | +12% | TxDOT |
| 06233430 | IH 10 Hazard elimination & safety from 1.6 MI. WEST OF US 87 to 0.3 MI. EAST OF US 87 | San Antonio District | 7 | Dan Williams Company | $2,404,185 | $2,455,973 | +2.0% | -16% | TxDOT |
| 06233436 | FM 3177 Widen road - add lanes from 0.11 MI N OF BAGBAY DR. to 0.07 MI S OF CONAGA AVE | Austin District | 4 | Lone Star Sitework, LLC | $2,361,951 | $2,480,388 | +5.0% | +8.0% | TxDOT |
| 06233435 | IH 820 Install/replace signs from IH 35W to LAKE WORTH BRIDGE | Fort Worth District | 4 | Odum Services, LLC | $2,031,605 | $2,038,258 | 0.0% | -7.0% | TxDOT |
| 06233421 | VA Bridge maintenance from VARIOUS LOCATIONS DISTRICTWIDE | San Antonio District | 4 | Relmco, Inc. | $1,984,026 | $2,500,374 | +26% | -23% | TxDOT |
| 06233441 | IH 820 Bridge maintenance from IH-820 WB COLLECTOR RD. AT BU 287P | Fort Worth District | 4 | Ibctx, LLC | $1,932,278 | $2,006,828 | +4.0% | +10% | TxDOT |
| 06233440 | CR Bridge replacement from AT DEER CREEK to STR # AA01-40-001 | Yoakum District | 5 | Constar Construction | $1,848,248 | $2,174,376 | +18% | -2.0% | TxDOT |
| 06233439 | US 287 Hazard elimination & safety from 0.6 MI W OF FM 432 to 0.5 MI E OF FM 432 | Wichita Falls District | 5 | Massana Construction Inc. | $1,828,753 | $1,983,236 | +8.0% | -1.0% | TxDOT |
| 06233438 | CS Bridge replacement from JACKSON DRIVE to AT LITTLE BEAR CREEK | Fort Worth District | 5 | Harper Brothers Construction LLC | $1,754,000 | $1,859,371 | +6.0% | -16% | TxDOT |
| 06233432 | SH 6 Hazard elimination & safety from GRIMES C/L to US 290 | Houston District | 4 | Massana Construction Inc. | $1,561,387 | $1,629,395 | +4.0% | -18% | TxDOT |
| 06233431 | SH 20 Construct pedestrian infrastructure from LP 375 to FM 1281 | El Paso District | 5 | International Eagle Enterprises, Inc. | $1,502,237 | $1,582,800 | +5.0% | -23% | TxDOT |
| 06233444 | SH 6 Landscape development from VOSS ROAD to SH 6 | Houston District | 3 | Yellowstone Landscape - Central, Inc. | $1,459,343 | $2,593,087 | +78% | +13% | TxDOT |
| 06233433 | CR Bridge replacement from STR NO 101, CR 1102, BUFFALO CREEK | Tyler District | 6 | True Roads Construction, LLC | $1,393,630 | $1,413,558 | +1.0% | -30% | TxDOT |
| 06233442 | US 281 Hazard elimination & safety from US 380 to SH 199 | Fort Worth District | 5 | Roadway Specialties, Inc. | $1,303,125 | $1,445,161 | +11% | -18% | TxDOT |
| 06233446 | SH 359 Hazard elimination & safety from 700 FT N OF FM 1091 to 700 FT S OF FM 1091 | Corpus Christi District | 5 | D&G Energy Corporation | $1,046,002 | $1,269,602 | +21% | -22% | TxDOT |
| 06233456 | SL 275 Preventive maintenance from W BRAKER LANE to PAYTON GIN ROAD | Austin District | 4 | Lone Star Paving Company | $1,029,125 | $1,092,292 | +6.0% | -3.0% | TxDOT |
| 06233452 | CR Bridge replacement from ON CR 173 AT BECK CREEK | Atlanta District | 2 | True Roads Construction, LLC | $968,857 | $1,303,130 | +35% | +21% | TxDOT |
| 06233448 | CR Bridge replacement from GYP CREEK | Abilene District | 3 | Delgado'S Contractors, LLC | $917,198 | $934,914 | +2.0% | +28% | TxDOT |
| 06233450 | CR Bridge replacement from HOLTZ RD CR 224 @ ELM CREEK BRNCH to STR# 14-028-0-AA0112-001 | Austin District | 5 | A Greater Austin Development Company, LLC | $742,960 | $774,916 | +4.0% | +34% | TxDOT |
| 06233449 | SS 172 Install illumination from US 190 to 0.25 MI N OF US 190 | Waco District | 6 | Austin Traffic Signal Construction Co., Inc. | $625,499 | $643,507 | +3.0% | -3.0% | TxDOT |
| 06233451 | SH 19 Hazard elimination & safety from FM 1617 to WALKER COUNTY LINE | Lufkin District | 4 | Scout 5 Construction LLC | $599,426 | $624,933 | +4.0% | -13% | TxDOT |
| 06233453 | VA Install traffic signal from VARIOUS | Amarillo District | 3 | Apollo Constructors, Inc. | $576,035 | $638,882 | +11% | -1.0% | TxDOT |
| 06233454 | US 181 Bridge maintenance from NB AND SB FRONTAGE ROADS to AT POESTA CREEK | Corpus Christi District | 8 | Constar Construction | $142,685 | $172,990 | +21% | -19% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.