A Greater Austin Development Company, LLC: TxDOT bid record
A Greater Austin Development Company, LLC submitted 32 bids on Texas DOT contracts in the data, from 09 JUL 2020 to 09 JUL 2024, and was the low bidder on 5 of them (16%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $6,381,414
- Latest bid
- 09 JUL 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 0 | 0% |
| 2023 | 9 | 1 | 11% |
| 2024 | 10 | 2 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Yoakum District | 12 | 1 | 8% |
| Abilene District | 5 | 1 | 20% |
| Austin District | 4 | 2 | 50% |
| San Antonio District | 3 | 0 | 0% |
| Waco District | 3 | 0 | 0% |
| Bryan District | 3 | 1 | 33% |
| San Angelo District | 1 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Install delineator assembly (D-SW)SZ (BRF)CTB (BI) | 658-6014 | EACH | 24 | 9 (38%) | $22.62 | $25.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 29 | 8 (28%) | $3,212.00 | $3,245.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 26 | 8 (31%) | $33.58 | $35.00 |
| Preparing row | 100-7002 | STA | 27 | 7 (26%) | $4,555.00 | $2,750.00 |
| Class C concrete (abutment) | 420-7012 | CY | 27 | 6 (22%) | $1,300.00 | $1,315.00 |
| Metal beam guard fence trans (TL2) | 540-7006 | EACH | 17 | 6 (35%) | $1,380.00 | $1,387.23 |
| Wire fence (type C) | 552-7003 | LF | 16 | 6 (38%) | $21.50 | $22.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 23 | 5 (22%) | $28.35 | $27.00 |
| Class C concrete (cap) | 420-7022 | CY | 16 | 5 (31%) | $1,592.50 | $1,557.98 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 10 | 5 (50%) | $11.50 | $5.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 26 | 4 (15%) | $1.90 | $1.00 |
| Prestressed concrete slab beam (5SB15) | 425-7019 | LF | 14 | 4 (29%) | $247.50 | $265.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 15 | 9 of 15 |
| Acme Bridge Company, Inc. | 10 | 8 of 10 |
| Knife River Corporation - South | 8 | 5 of 8 |
| E-Z Bel Construction, LLC | 8 | 4 of 8 |
| SB Contractors LLC | 7 | 6 of 7 |
| Texas Materials Group, Inc. | 7 | 0 of 7 |
| Fuqua Construction Co., Inc. | 6 | 3 of 6 |
| C. E. Barker, LTD. | 6 | 4 of 6 |
| Sefbo Pipeline Bridge, Incorporated | 5 | 3 of 5 |
| Delgado'S Contractors, LLC | 5 | 4 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 JUL 2024 | 07243015 | Yoakum District | CR Widen bridge from AT DRAW to STR # AA03-05-001 (GUADALUPE RD) | 3 of 8 | $3,089,419 | +12% |
| 05 JUN 2024 | 06243039 | Bryan District | CR Bridge replacement from ON CR 232 (LOCAL ROAD 146) to AT BIRCH CREEK | 1 of 6 | $1,209,203 | Low, 7.0% under the second |
| 03 MAY 2024 | 05243223 | Waco District | FM 66 Repl br & apprs from @ VALLEY BRANCH to (STR #011) | 3 of 5 | $2,795,454 | +13% |
| 03 MAY 2024 | 05243240 | Bryan District | CR Bridge replacement from CR 443 AT BUSHY CREEK | 3 of 10 | $1,085,567 | +11% |
| 02 MAY 2024 | 05243030 | Yoakum District | CR Bridge replacement from EAST STREET AT DRAW to STR# AA07-75-001 (CR 188) | 2 of 6 | $2,318,279 | +1.0% |
| 04 APR 2024 | 04243031 | Yoakum District | CR Bridge replacement from BARTON CREEK RD AT BARTONS CREEK to STR# AA01-95-001 | 4 of 10 | $1,080,733 | +13% |
| 06 MAR 2024 | 03243211 | Brownwood District | CR Bridge replacement from CR 260 AT SOUTH LEON RIVER | 3 of 3 | $4,781,298 | +26% |
| 06 MAR 2024 | 03243223 | Yoakum District | CR Bridge replacement from AT WEST SANDY CREEK to STR # AA02-22-001 (CR 221) | 5 of 8 | $3,052,434 | +11% |
| 05 JAN 2024 | 01243224 | Yoakum District | CR Bridge replacement from AT SANDIES CREEK to STR# AA01-66-001 (WESTOFF-CHEAPSIDE | 2 of 4 | $3,791,244 | +4.0% |
| 05 JAN 2024 | 01243227 | Abilene District | FM 576 Bridge replacement from FM 576 to AT DEEP CREEK | 1 of 4 | $2,414,952 | Low, 15% under the second |
| 02 NOV 2023 | 11233219 | Abilene District | FM 419 Bridge replacement from FM 419 to DRAW CREEK | 4 of 6 | $825,686 | +21% |
| 02 NOV 2023 | 11233223 | Abilene District | FM 1226 Bridge replacement from AT CALIFORNIA CREEK | 3 of 5 | $1,825,415 | +9.0% |
| 03 AUG 2023 | 08233258 | Austin District | CR Bridge replacement from ON GELLERMAN LN @ PEDERNALES RIVER to STR# 14-087-0-AA01-37-001 | 3 of 6 | $1,086,098 | +6.0% |
| 27 JUN 2023 | 06233440 | Yoakum District | CR Bridge replacement from AT DEER CREEK to STR # AA01-40-001 | 4 of 5 | $2,334,418 | +26% |
| 27 JUN 2023 | 06233450 | Austin District | CR Bridge replacement from HOLTZ RD CR 224 @ ELM CREEK BRNCH to STR# 14-028-0-AA0112-001 | 1 of 5 | $742,960 | Low, 4.0% under the second |
| 01 JUN 2023 | 06233037 | Bryan District | CR Bridge replacement from ON CR 147 to AT BIG ELM CREEK | 2 of 6 | $918,418 | +19% |
| 01 JUN 2023 | 06233043 | Abilene District | CR Bridge replacement from ON CR 616 (412) to AT N FORK CHAMPION CREEK | 2 of 2 | $780,511 | +10% |
| 08 MAR 2023 | 03233228 | Yoakum District | CR Bridge replacement from AT BRUSHY BRANCH to STR# AA01-14-001 (BOEHNKE RD) | 4 of 8 | $2,915,629 | +12% |
| 07 MAR 2023 | 03233032 | Austin District | CR Bridge replacement from ON CR 452 AT BRANCH OF MUSTANG CRK to STR# 14-246-0-AA04-13-001 | 2 of 3 | $834,580 | +8.0% |
| 02 DEC 2022 | 12223219 | Yoakum District | CR Bridge replacement from AT WERTZNER CREEK to STR#AA01-79-001(HALSTEDT RD) | 5 of 9 | $1,988,625 | +15% |
| 01 DEC 2022 | 12223026 | Waco District | CR Bridge replacement from CR 274 @ CLEAR CREEK to (MAP #029) | 4 of 5 | $962,246 | +43% |
| 03 NOV 2022 | 11223224 | Yoakum District | CR Bridge replacement from AT PIN OAK BRANCH to STR#AA03-80-001(TEINERT RD) | 7 of 8 | $1,620,646 | +21% |
| 02 NOV 2022 | 11223021 | Waco District | CR Bridge replacement from CR 118 @ GARY CREEK to (MAP #007) | 4 of 4 | $1,169,191 | +46% |
| 06 MAY 2021 | 05213225 | San Antonio District | RM 32 Bridge replacement from AT CARPER CREEK | 9 of 11 | $1,508,845 | +44% |
| 05 MAY 2021 | 05213034 | San Antonio District | CR Bridge replacement from CR 545 @ BRIER BRANCH CREEK | 10 of 11 | $735,246 | +75% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.