TxDOT letting results, March 8, 2023
78 contracts let by Texas DOT on March 8, 2023, $365,926,413 in low bids, a median of 3 bidders per contract. On the 78 with an engineer's estimate, the low bid came in under it 41 times; median low bid -3.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 78
- Low bids, total
- $365,926,413
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 03233202 | US 385 Highway improvement from CRANE COUNTY LINE to NIMITZ STREET IN MCCAMEY | Odessa District | 1 | Delhur Industries, Inc. | $49,428,879 | +3.0% | TxDOT | ||
| 03233205 | SL 378 Widen, add center turn lane, and acp overlay from FM 1223 to US 87 | San Angelo District | 2 | Webber, LLC | $39,780,448 | $52,959,813 | +33% | +41% | TxDOT |
| 03233203 | US 281 Construct new roadway lanes from PALO PINTO COUNTY LINE to SH 199 | Fort Worth District | 4 | Austin Bridge & Road Services, LP | $29,571,986 | $30,761,703 | +4.0% | +27% | TxDOT |
| 03233201 | SH 6 Widen road - add shoulders from 0.18 MI. N. OF CRESSENT ST to COMANCHE C/L | Brownwood District | 1 | Jay Mills Contracting, Incorporated | $27,819,417 | +39% | TxDOT | ||
| 03233207 | SH 6 Add passing lanes and overlay from HAMILTON CO LINE to 7.519 MI N OF SH 22 | Waco District | 4 | Big Creek Construction, LTD. | $26,587,290 | $27,632,266 | +4.0% | -9.0% | TxDOT |
| 03233206 | FM 973 Hazard elimination & safety from 0.069 MI. NE OF FM 969 to 0.1 MI. N OF THYONE DR | Austin District | 7 | Dan Williams Company | $22,834,261 | $25,594,994 | +12% | +21% | TxDOT |
| 03233204 | SH 35 Interchange improvement (new or update) from ON SH35 AT CORPUS CHRISTI ST. INTER | Corpus Christi District | 3 | Anderson Columbia Co., Inc. | $22,334,444 | $28,970,082 | +30% | -12% | TxDOT |
| 03233209 | FM 2258 Resurface roadway from CR 205 to ELLIS COUNTY LINE | Fort Worth District | 2 | Jay Mills Contracting, Incorporated | $13,791,080 | $21,239,331 | +54% | +29% | TxDOT |
| 03233210 | US 69 Surfacing/roadway restoration from US 69 Y, SOUTH to JEFFERSON COUNTY LINE | Beaumont District | 3 | Texas Materials Group, Inc. | $12,495,081 | $13,329,299 | +7.0% | +45% | TxDOT |
| 03233212 | FM 121 Rehabilitate existing roadway from VAN ALSTYNE to SH 160 | Paris District | 2 | D. L. Lennon Incorporated - Contractor | $10,767,205 | $10,777,512 | 0.0% | -6.0% | TxDOT |
| 03233208 | FM 2410 Rehabilitate existing roadway from FM 3481 to IH 14 | Waco District | 2 | Texas Materials Group, Inc. | $9,585,341 | $10,597,206 | +11% | -5.0% | TxDOT |
| 03233214 | FM 261 Hbp bridge replacement project on fm 261. from 2.5 M FM 3385 to 2.8 M FM 3385 | Lubbock District | 1 | Earth Builders, L.P. | $7,482,765 | +23% | TxDOT | ||
| 03233218 | FM 2200 Bridge replacement from AT SAN FRANCISCO CREEK | San Antonio District | 7 | Salinas Construction Technologies, LTD. | $6,206,529 | $6,526,818 | +5.0% | +11% | TxDOT |
| 03233213 | IH 20 Replace bridge from IH 20 WEST BOUND to BRUSHY CREEK | Abilene District | 4 | Altus Construction LLC | $5,593,534 | $7,252,927 | +30% | -10% | TxDOT |
| 03233211 | IH 20 Preventive maintenance from NEAR WELLS LN to .75 MILES EAST OF HAYTER RD | Abilene District | 4 | Duininck, Inc. | $5,489,129 | $5,491,020 | 0.0% | -29% | TxDOT |
| 03233220 | FM 369 Surfacing/roadway restoration from SL 473 to BARNETT ROAD | Wichita Falls District | 4 | Zack Burkett Co. | $5,448,304 | $6,050,801 | +11% | +30% | TxDOT |
| 03233215 | FM 1333 Hazard elimination & safety from SH 713 to COUNTY ROAD 210 | San Antonio District | 8 | Salinas Construction Technologies, LTD. | $4,025,336 | $4,397,598 | +9.0% | -32% | TxDOT |
| 03233221 | US 80 Resurface roadway from UPSHUR CL to SL 485 | Tyler District | 4 | Madden Contracting Company, LLC. | $3,878,620 | $3,899,859 | +1.0% | +9.0% | TxDOT |
| 03233219 | SH 29 Preventive maintenance from BURNET COUNTY LINE to FM 1869 | Austin District | 2 | Lone Star Paving Company | $3,739,221 | $5,243,634 | +40% | -17% | TxDOT |
| 03234218 | SL0008 Bridge scour repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Houston District | 8 | Garret Shields Infrastructure | $3,278,454 | $3,289,159 | 0.0% | -1.0% | TxDOT |
| 03233222 | VA Construct pedestrian infrastructure from AT VARIOUS LOCATIONS IN CC DISTRICT | Corpus Christi District | 3 | Ti-Zack Concrete, LLC | $3,123,217 | $3,883,301 | +24% | -7.0% | TxDOT |
| 03233232 | FM 2680 Hazard elimination & safety from END OF PAVEMENT to US 69 | Lufkin District | 2 | Drewery Construction Company, Incorporated | $2,660,027 | $5,013,875 | +88% | +38% | TxDOT |
| 03233228 | CR Bridge replacement from AT BRUSHY BRANCH to STR# AA01-14-001 (BOEHNKE RD) | Yoakum District | 8 | Trevway, Inc. | $2,596,559 | $2,618,694 | +1.0% | +1.0% | TxDOT |
| 03234201 | IH0030 Large sign replacement from VARIOUS ROADWAYS IN THE to DALLAS DISTRICT | Dallas District | 2 | Mica Corporation | $2,430,722 | $3,046,766 | +25% | +21% | TxDOT |
| 03233216 | IH 20 Construct rest area from 18.0 MI W. OF WEATHERFORD | Fort Worth District | 4 | Duininck, Inc. | $2,356,201 | $2,735,768 | +16% | -25% | TxDOT |
| 03233230 | VA Bridge maintenance from DISTRICTWIDE | El Paso District | 1 | Dan Williams Company | $2,271,558 | +59% | TxDOT | ||
| 03233226 | SH 22 Bridge maintenance from AT TWO MILE CREEK to (STR #010) | Waco District | 7 | Built Right Construction of Oklahoma, LLC | $2,190,515 | $2,248,889 | +3.0% | +43% | TxDOT |
| 03233224 | FM 973 Preventive maintenance from WILCO/TRAVCO LINE to S OF BRITA OLSON | Austin District | 3 | Lone Star Paving Company | $2,000,249 | $2,544,081 | +27% | -20% | TxDOT |
| 03234217 | IH0010 Traffic management systems, illumination maintena from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 1 | Tri State Electric, LTD. | $1,985,312 | +9.0% | TxDOT | ||
| 03233229 | US 87 Hazard elimination & safety from LYNN COUNTY LINE to FM1210 | Lubbock District | 4 | HJC Farms, Inc. | $1,774,773 | $1,799,986 | +1.0% | -9.0% | TxDOT |
| 03234243 | IH0045 Mowing highway right of way from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION | Dallas District | 3 | Cross Plus Construction, LLC | $1,683,810 | $1,798,880 | +7.0% | -3.0% | TxDOT |
| 03234227 | IH0010 Mill and inlay from VARIOUS to VARIOUS | Odessa District | 5 | Dan Williams Company | $1,668,546 | $2,129,434 | +28% | -23% | TxDOT |
| 03234234 | US0259 Hot mix from HENDERSON MTCE SECTION to RUSK COUNTY | Tyler District | 1 | Longview Asphalt, Inc. | $1,244,870 | +15% | TxDOT | ||
| 03233233 | US 90 Hazard elimination & safety from 0.682 MI WEST OF FM 1049 (RAILROAD) to 0.1 MI WEST OF MIYA KAWA RD | San Antonio District | 3 | E-Z Bel Construction, LLC | $1,194,195 | $1,205,341 | +1.0% | +16% | TxDOT |
| 03234228 | SH0037 Dense graded hot mix from 0.001 to RED RIVER COUNTY | Paris District | 1 | RK Hall, LLC | $1,157,500 | -4.0% | TxDOT | ||
| 03234210 | US0069 Mowing highway right of way from HARDIN COUNTY to HARDIN COUNTY | Beaumont District | 2 | P-Ville, Incorporated | $1,136,250 | $1,214,456 | +7.0% | +28% | TxDOT |
| 03234235 | FM3148 Base failure pavement repair from VARIOUS LOCATIONS to IN MCLENNAN COUNTY | Waco District | 4 | Texas Materials Group, Inc. | $1,115,329 | $1,216,297 | +9.0% | -15% | TxDOT |
| 03233227 | VA Ih pavement markings (2023) from DISTRICTWIDE | Odessa District | 8 | Vizcaino, L.P. | $1,103,054 | $1,226,821 | +11% | -30% | TxDOT |
| 03233234 | FM 78 Hazard elimination & safety from CRESTWAY DR to BRUCKS DR | San Antonio District | 5 | Hunter Industries, LTD. | $962,217 | $1,018,559 | +6.0% | +19% | TxDOT |
| 03234238 | SH0081 Hot mix from VARIOUS ROADWAYS to IN HILL COUNTY | Waco District | 3 | Knife River Corporation - South | $874,560 | $905,706 | +4.0% | +1.0% | TxDOT |
| 03234212 | US0069 Mowing highway right of way from SOUTH JEFFERSON COUNTY to SOUTH JEFFERSON COUNTY | Beaumont District | 2 | Yellowstone Landscape - Central, Inc. | $868,334 | $1,088,700 | +25% | +31% | TxDOT |
| 03234236 | FM1304 Base failure pavement repair from VARIOUS LOCATIONS to IN HILL COUNTY | Waco District | 5 | Texas Materials Group, Inc. | $860,756 | $874,604 | +2.0% | -4.0% | TxDOT |
| 03234219 | SH0288 Metal beam guard fence repair from VARIOUS LOCATIONS IN BRAZORIA COUNT to VARIOUS LOCATIONS IN BRAZORIA COUNT | Houston District | 4 | S6 Interstate Services | $854,501 | $1,047,125 | +23% | -21% | TxDOT |
| 03234211 | US0190 Mowing highway right of way from NEWTON COUNTY to NEWTON COUNTY | Beaumont District | 2 | P-Ville, Incorporated | $853,292 | $963,068 | +13% | +26% | TxDOT |
| 03234213 | IH0010 Mowing highway right of way from ORANGE COUNTY to ORANGE COUNTY | Beaumont District | 2 | P-Ville, Incorporated | $846,297 | $984,340 | +16% | +28% | TxDOT |
| 03234237 | US0084 Hot mix from VARIOUS ROADWAYS to IN LIMESTONE COUNTY | Waco District | 3 | Knife River Corporation - South | $840,400 | $870,000 | +4.0% | -4.0% | TxDOT |
| 03233237 | CR Bridge replacement from WOLF CREEK TRIBUTARY BRIDGE | Ochiltree | 5 | THK Construction LLC | $809,348 | $994,343 | +23% | +10% | TxDOT |
| 03233235 | US 287 Install illumination from MITCHELL BLVD to MILLER AVE | Fort Worth District | 4 | Highway Intelligent Traffic Solutions, Inc. | $770,000 | $1,021,240 | +33% | -37% | TxDOT |
| 03233236 | CS Hazard elimination & safety from ALBERTON AVE to 0.04 MI S OF LTV RD | El Paso District | 1 | Tri State Electric, LTD. | $746,836 | +8.0% | TxDOT | ||
| 03234220 | US0084 Cutback from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 3 | Wright Asphalt Products Company LLC | $729,000 | $759,600 | +4.0% | -7.0% | TxDOT |
| 03234208 | US0290 Mowing highway right of way from VARIOUS LOCATIONS IN to LEE COUNTY | Austin District | 4 | R&M Incorporated | $696,198 | $756,886 | +9.0% | +45% | TxDOT |
| 03234202 | SH0031 Reflectorized pavement markings & markers from VARIOUS ROADWAYS IN THE to ELLIS COUNTY MAINTENANCE SECTION | Dallas District | 3 | TRP Construction Group, LLC | $691,800 | $811,585 | +17% | +2.0% | TxDOT |
| 03234229 | SH0154 Dense graded hot mix from 0.001 to DELTA COUNTY | Paris District | 1 | RK Hall, LLC | $632,500 | -4.0% | TxDOT | ||
| 03234239 | SH0006 Hot mix from VARIOUS ROADWAYS to IN BOSQUE COUNTY | Waco District | 3 | Knife River Corporation - South | $618,350 | $621,100 | 0.0% | +3.0% | TxDOT |
| 03234230 | SH0154 Emulsion from 0.001 to DELTA COUNTY | Paris District | 1 | Ergon Asphalt & Emulsions, Inc. | $533,140 | -3.0% | TxDOT | ||
| 03233242 | FM 521 Hazard elimination & safety from AT CR 461 | Houston District | 2 | Main Lane Industries LTD. | $532,257 | $645,985 | +21% | +54% | TxDOT |
| 03233240 | CR Bridge replacement from CR 2112, 3.00 MI S. OF SH20 W OF CA to AT CANEY CREEK | Tyler District | 7 | THK Construction LLC | $521,961 | $543,772 | +4.0% | +4.0% | TxDOT |
| 03234216 | US0075 Large sign replacement from US75 NB SOUTH to OF STACY RD IN COLLIN COUNTY | Dallas District | 2 | Mica Corporation | $521,225 | $568,568 | +9.0% | +58% | TxDOT |
| 03234204 | IH0020 Mowing highway right of way from VARIOUS LOCATIONS IN to HOWARD COUNTY | Abilene District | 4 | Abescape Group LLC | $515,275 | $686,150 | +33% | +8.0% | TxDOT |
| 03234209 | US0087 Mowing highway right of way from VARIOUS LOCATIONS IN MASON, to LLANO AND GILLESPIE COUNTIES | Austin District | 2 | P-Ville, Incorporated | $499,977 | $623,584 | +25% | +13% | TxDOT |
| 03234205 | IH0020 Mowing highway right of way from VARIOUS LOCATIONS IN to CALLAHAN COUNTY | Abilene District | 2 | Greg Scruggs | $495,705 | $562,296 | +13% | +24% | TxDOT |
| 03234231 | IH0030 Pavement markings from VARIOUS LOCATIONS IN to PARIS DISTRICT | Paris District | 4 | Traffic Highway Maintenance, LLC | $461,061 | $466,635 | +1.0% | -12% | TxDOT |
| 03234214 | IH0010 Metal beam guard fence repair from VARIOUS to CHAMBERS AND LIBERTY COUNTIES | Beaumont District | 2 | Roy Jorgensen Associates, Inc. | $439,056 | $880,243 | +100% | -45% | TxDOT |
| 03233238 | US 290 Drainage improvements from AT HEGAR ROAD AND FIELD STORE ROAD | Houston District | 9 | Forde Construction Company, Inc. | $425,418 | $614,864 | +45% | -16% | TxDOT |
| 03234240 | US0183 Hot-mix cold-laid from GONZALES COUNTY | Yoakum District | 4 | Brauntex Materials, Inc. | $415,000 | $444,400 | +7.0% | -11% | TxDOT |
| 03234241 | US0077 Hot mix from LAVACA COUNTY | Yoakum District | 4 | Brauntex Materials, Inc. | $400,000 | $450,000 | +12% | -8.0% | TxDOT |
| 03234244 | US0075 Envelope repairs to address water infiltration. from DENISON TRAVEL INFORMATION CENTER to DENISON TRAVEL INFORMATION CENTER | Paris District | 2 | Scout 5 Construction LLC | $394,511 | $845,000 | +114% | -16% | TxDOT |
| 03234223 | IH0020 Metal beam guard fence repair from VARIOUS to VARIOUS | Odessa District | 4 | Ross Sa Enterprise LLC | $380,240 | $460,690 | +21% | -18% | TxDOT |
| 03234225 | IH0010 Metal beam guard fence repair from VARIOUS to VARIOUS | Odessa District | 3 | Ross Sa Enterprise LLC | $372,040 | $424,500 | +14% | +2.0% | TxDOT |
| 03234242 | US0077 Emulsion from FAYETTE, LAVACA, DEWITT, AND to GONZALES COUNTIES | Yoakum District | 3 | Wright Asphalt Products Company LLC | $357,100 | $396,878 | +11% | -7.0% | TxDOT |
| 03234221 | IH0027 Emulsion from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 1 | Ergon Asphalt & Emulsions, Inc. | $341,000 | -17% | TxDOT | ||
| 03234206 | US0083 Raised pavement markers from VARIOUS LOCATIONS IN EAST REGION to OF THE ABILENE DISTRICT | Abilene District | 5 | Flat Line, Inc. | $339,485 | $369,948 | +9.0% | -13% | TxDOT |
| 03234207 | IH0020 Raised pavement markers from VARIOUS LOCATIONS IN to THE WEST REGION OF THE ABILENE DIST | Abilene District | 6 | Flat Line, Inc. | $320,005 | $322,050 | +1.0% | -13% | TxDOT |
| 03233241 | IH 410 Hazard elimination & safety from 0.15 NORTH OF US 90 to MARBACH | San Antonio District | 4 | SCR Civil Construction, LLC | $315,680 | $334,600 | +6.0% | -9.0% | TxDOT |
| 03234232 | SH0037 Emulsion from 0.001 to RED RIVER COUNTY | Paris District | 1 | Ergon Asphalt & Emulsions, Inc. | $309,760 | -3.0% | TxDOT | ||
| 03234203 | IH0030 Large sign replacement from VARIOUS ROADWAYS IN THE to DALLAS DISTRICT | Dallas District | 3 | Synergy Signs & Services LLC | $290,891 | $312,898 | +8.0% | -7.0% | TxDOT |
| 03234226 | IH0020 Metal beam guard fence repair from VARIOUS to VARIOUS | Odessa District | 4 | Ross Sa Enterprise LLC | $189,980 | $321,235 | +69% | -35% | TxDOT |
| 03234222 | IH0027 Emulsion from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 1 | Ergon Asphalt & Emulsions, Inc. | $71,250 | -23% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.