Main Lane Industries LTD.: TxDOT bid record
Main Lane Industries LTD. submitted 76 bids on Texas DOT contracts in the data, from 11 FEB 2020 to 06 DEC 2023, and was the low bidder on 20 of them (26%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $60,183,378
- Latest bid
- 06 DEC 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 18 | 3 | 17% |
| 2021 | 25 | 6 | 24% |
| 2022 | 12 | 3 | 25% |
| 2023 | 21 | 8 | 38% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 67 | 18 | 27% |
| Beaumont District | 7 | 0 | 0% |
| Yoakum District | 1 | 1 | 100% |
| Bryan District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 40 | 17 (43%) | $1.00 | $1.00 |
| Block sodding | 162-7002 | SY | 47 | 16 (34%) | $4.50 | $6.20 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 38 | 15 (39%) | $0.07 | $0.18 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 36 | 14 (39%) | $1.38 | $1.40 |
| Portable changeable message sign | 503-7001 | DAY | 40 | 13 (33%) | $100.50 | $100.00 |
| Cem stabil BKFL | 400-7010 | CY | 35 | 13 (37%) | $50.00 | $200.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 31 | 13 (42%) | $5.00 | $5.00 |
| Vegetative watering | 168-7001 | MG | 48 | 12 (25%) | $31.00 | $29.97 |
| Eliminating existing pavement marking & markers (24") | 677-6007 | LF | 30 | 12 (40%) | $2.35 | $3.50 |
| Eliminating existing pavement marking & markers (word) | 677-6012 | EACH | 27 | 12 (44%) | $50.00 | $67.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 64 | 11 (17%) | $9,500.00 | $5,000.00 |
| Pavement surface preparation for marking (arrow) | 678-7009 | EACH | 30 | 11 (37%) | $10.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Isi Contracting, Inc. | 36 | 21 of 36 |
| FNH Construction, LLC | 22 | 3 of 22 |
| Ragle Construction, Inc. | 17 | 10 of 17 |
| Triple B Services LLP | 17 | 5 of 17 |
| Harper Brothers Construction LLC | 17 | 3 of 17 |
| Ser Construction Partners, LLC | 16 | 10 of 16 |
| Angel Brothers Holdings Corp. | 12 | 5 of 12 |
| Forde Construction Company, Inc. | 12 | 6 of 12 |
| James Construction Group, LLC | 11 | 6 of 11 |
| Aranda Brothers Construction Co., Inc. | 10 | 3 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 DEC 2023 | 12233212 | Houston District | FM 517 Highway improvement from FM 646 to IH 45 | 5 of 6 | $848,012 | +63% |
| 05 DEC 2023 | 12233014 | Houston District | VA Rehabilitate bridge from VAR LOCATIONS IN SE HARRIS AO BOUND | 2 of 6 | $6,220,713 | +25% |
| 14 NOV 2023 | 11231201 | Houston District | SH0288 Bridge rail upgrade or replacement from AT FLAG LAKE CANAL | 1 of 3 | $205,770 | Low, 9.0% under the second |
| 01 NOV 2023 | 11233014 | Houston District | VA Hike and/or bike from ON SH 96, SH 146, FM 270 & FM 2094 | 1 of 4 | $7,167,628 | Low, 6.0% under the second |
| 07 SEP 2023 | 09233217 | Houston District | CR Bridge replacement from CR 451A (MARY LANE) AT DRAINAGE DIT | 1 of 3 | $3,799,247 | Low, 12% under the second |
| 07 SEP 2023 | 09233219 | Bryan District | US 290 Bridge maintenance from AT FM 577 | 1 of 6 | $2,162,427 | Low, 5.0% under the second |
| 06 SEP 2023 | 09233041 | Houston District | CS Bridge replacement from BACA STREET AT HCFCD DITCH | 3 of 4 | $859,095 | +15% |
| 03 AUG 2023 | 08233207 | Houston District | FM 1960 Interchange improvement from SH 249 to CUTTEN RD | 2 of 4 | $28,151,000 | +3.0% |
| 03 AUG 2023 | 08233246 | Houston District | CS Hazard elimination & safety from HILLCROFT AVENUE AT DASHWOOD DRIVE | 1 of 1 | $1,979,986 | Low |
| 02 AUG 2023 | 08233053 | Houston District | CS Hazard elimination & safety from SMITH STREET AT TUAM STREET | 1 of 1 | $1,234,892 | Low |
| 27 JUN 2023 | 06233403 | Houston District | SH 288 Install/upgrade drainage structure(s) from IH 69 to NORTH MACGREGOR WAY | 1 of 5 | $33,795,218 | Low, 12% under the second |
| 27 JUN 2023 | 06233408 | Houston District | SH 242 Intersection improvement from FM 1488 to IH 45 | 3 of 4 | $32,991,203 | +15% |
| 02 JUN 2023 | 06233213 | Houston District | SL 8 Reconstruct eb and wb frontage roads from WEST OF HARDY TOLL RD to EAST OF ALDINE WESTFIELD RD | 2 of 7 | $8,667,560 | +5.0% |
| 05 MAY 2023 | 05233214 | Houston District | FM 1960 Hazard elimination & safety from 0.369 MI E OF IH 45 to 0.179 MI W OF LEE RD | 2 of 4 | $6,589,841 | +29% |
| 05 MAY 2023 | 05233219 | Houston District | SL 8 Highway improvement from BOHEME DR to S OF IH 10 | 2 of 2 | $4,135,000 | +3.0% |
| 04 MAY 2023 | 05233029 | Houston District | SH 288 Construct frontage roads from AIRPORT BLVD to SIMS BAYOU | 5 of 6 | $3,777,754 | +13% |
| 04 MAY 2023 | 05234016 | Houston District | US0059 Asphalt pavement repair from VARIOUS HWYS IN FORT BEND COUNTY to VARIOUS HWYS IN FORT BEND COUNTY | 2 of 2 | $424,500 | +12% |
| 04 MAY 2023 | 05234018 | Houston District | US0290 Bridge deck repair from VARIOUS ROADWAYS IN WALLER COUNTY to VARIOUS ROADWAYS IN WALLER COUNTY | 2 of 2 | $1,092,450 | +48% |
| 08 MAR 2023 | 03233238 | Houston District | US 290 Drainage improvements from AT HEGAR ROAD AND FIELD STORE ROAD | 7 of 9 | $775,069 | +82% |
| 08 MAR 2023 | 03233242 | Houston District | FM 521 Hazard elimination & safety from AT CR 461 | 1 of 2 | $532,257 | Low, 21% under the second |
| 07 MAR 2023 | 03234022 | Houston District | IH0045 Drainage improvement and/or repairs from I 45 WALKER C/L to I 45 HARRIS C/L | 7 of 7 | $1,694,800 | +137% |
| 02 NOV 2022 | 11223010 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 7 of 8 | $12,294,824 | +12% |
| 08 SEP 2022 | 09223207 | Houston District | SH 87 Transportation non-roadway from 0.24 MILES WEST OF SH 124 to 2.21 MILES WEST OF SH 124 | 10 of 11 | $13,595,825 | +51% |
| 07 SEP 2022 | 09223005 | Houston District | CS Reconstruct existing roadway from NAVIGATION BLVD; AT JENSEN/RUNNELS | 3 of 4 | $4,095,679 | +25% |
| 04 AUG 2022 | 08223253 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 8 of 9 | $12,636,872 | +15% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.