TxDOT letting results, November 14, 2023
6 contracts let by Texas DOT on November 14, 2023, $1,598,575 in low bids, a median of 1 bidders per contract. On the 6 with an engineer's estimate, the low bid came in under it 5 times; median low bid -6.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 6
- Low bids, total
- $1,598,575
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 11231601 | US0181 Limestone rock asphalt from VARIOUS | Corpus Christi District | 1 | Vulcan Construction Materials, LLC | $289,978 | 0.0% | TxDOT | ||
| 11231605 | US0181 Limestone rock asphalt from VARIOUS | Corpus Christi District | 1 | Vulcan Construction Materials, LLC | $284,053 | -4.0% | TxDOT | ||
| 11231603 | US0281 Limestone rock asphalt from VARIOUS | Corpus Christi District | 1 | Vulcan Construction Materials, LLC | $281,000 | -5.0% | TxDOT | ||
| 11231602 | US0181 Limestone rock asphalt from VARIOUS | Corpus Christi District | 1 | Vulcan Construction Materials, LLC | $269,887 | -7.0% | TxDOT | ||
| 11231604 | US0059 Limestone rock asphalt from VARIOUS | Corpus Christi District | 1 | Vulcan Construction Materials, LLC | $267,887 | -8.0% | TxDOT | ||
| 11231201 | SH0288 Bridge rail upgrade or replacement from AT FLAG LAKE CANAL | Houston District | 3 | Main Lane Industries LTD. | $205,770 | $224,015 | +9.0% | -11% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.