TxDOT letting results, November 2, 2022
39 contracts let by Texas DOT on November 2, 2022, $666,518,963 in low bids, a median of 3 bidders per contract. On the 39 with an engineer's estimate, the low bid came in under it 18 times; median low bid +2.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 39
- Low bids, total
- $666,518,963
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 11223001 | IH 30 Grading,acp,strs,signing,pavement from SH205 to WEST OF FM2642 (HUNT C/L) | Dallas District | 3 | Austin Bridge & Road Services, LP | $510,166,222 | $516,518,373 | +1.0% | +23% | TxDOT |
| 11223002 | US 60 Seal coat from US 83/ US 60 INTERCHANGE to FM 2388 IN CANADIAN | Amarillo District | 1 | Missouri Petroleum Products Company LLC | $21,819,571 | +10% | TxDOT | ||
| 11223003 | RM 1492 Roadway rehabilitation from FM 1787 to UPTON COUNTY LINE | Odessa District | 2 | Jones Bros. Dirt & Paving Contractors, Inc. | $16,251,844 | $19,729,387 | +21% | -2.0% | TxDOT |
| 11223006 | SH 87 Resurface roadway from SH 7 to SH 147, ETC. | Lufkin District | 2 | Clark Construction of Texas, Inc. | $15,659,342 | $19,036,807 | +22% | +16% | TxDOT |
| 11223004 | US 180 Preventive maintenance from US 183 to BURNET C/L | Brownwood District | 4 | Brannan Paving Co., LTD. | $14,954,533 | $15,108,685 | +1.0% | +2.0% | TxDOT |
| 11223010 | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | Houston District | 8 | Isi Contracting, Inc. | $10,942,905 | $10,963,075 | 0.0% | +2.0% | TxDOT |
| 11223008 | US 84 Infrastructure improvements from US 82 to IH 27 | Lubbock District | 2 | Gilvin-Terrill, LTD. | $9,876,827 | $13,771,978 | +39% | +16% | TxDOT |
| 11223007 | IH 10 Preventive maintenance from SUTTON COUNTY LINE to 9.86 MI E OF SUTTON COUNTY LINE | San Angelo District | 4 | Allen Keller Company | $9,718,660 | $10,224,645 | +5.0% | -11% | TxDOT |
| 11223005 | US 96 Bridge maintenance from AT BNSF RR (STR#20-101-0-0065-05-09 to .(NORTHBOUND) | Beaumont District | 3 | Ragle Construction, Inc. | $8,587,147 | $9,865,738 | +15% | +8.0% | TxDOT |
| 11223011 | US 82 Hazard elimination & safety from COOKE COUNTY LINE to FM 131 | Paris District | 7 | Stateline Construction, LLC | $5,981,039 | $6,021,545 | +1.0% | -6.0% | TxDOT |
| 11223012 | SH 107 Preventive maintenance from FM 2061 to 10TH ST | Pharr District | 3 | Ioc Company LLC | $5,739,476 | $5,872,239 | +2.0% | -8.0% | TxDOT |
| 11223025 | US 83 Surfacing/roadway restoration from FM 277 to WHEELER COUNTY LINE | Amarillo District | 4 | Duininck, Inc. | $5,382,630 | $5,594,278 | +4.0% | -3.0% | TxDOT |
| 11223009 | US 281 Surfacing/roadway restoration from SOUTH OF FM 2508 to SH 141 | Corpus Christi District | 4 | Hunter Industries, LTD. | $4,570,095 | $4,587,868 | 0.0% | -13% | TxDOT |
| 11223013 | SH 21 Preventive maintenance from SH 80 to CALDWELL COUNTY LINE | Austin District | 4 | Lone Star Paving Company | $2,808,196 | $2,943,409 | +5.0% | -7.0% | TxDOT |
| 11223014 | SH 16 Bridge maintenance from AT RUSH CREEK | Brownwood District | 7 | Structural Integrity Group LLC | $2,724,265 | $2,894,202 | +6.0% | +9.0% | TxDOT |
| 11224002 | IH0020 Limestone rock asphalt from VARIOUS LOCATIONS to IN ABILENE DISTRICT | Abilene District | 2 | Vulcan Construction Materials, LLC | $1,838,980 | $1,945,190 | +6.0% | +7.0% | TxDOT |
| 11224001 | IH0020 Illumination maintenance from VARIOUS LOCATIONS IN THE to ABILENE DISTRICT | Abilene District | 3 | Willis Electric Co., LP | $1,743,650 | $1,785,991 | +2.0% | +58% | TxDOT |
| 11224015 | IH0010 Traffic control services from VARIOUS LOCATIONS to VARIOUS LOCATIONS | San Antonio District | 5 | Statewide Safety Systems | $1,635,300 | $2,003,650 | +23% | -4.0% | TxDOT |
| 11223017 | VA Construct pedestrian infrastructure from ON FM 2799 FROM MAIN ST. to PARK LANE | Beaumont District | 4 | Ti-Zack Concrete, LLC | $1,396,804 | $1,462,429 | +5.0% | +13% | TxDOT |
| 11224003 | FM0612 Mill and inlay from VARIOUS LOCATIONS IN to SCURRY & BORDEN COUNTIES | Abilene District | 3 | RK Hall, LLC | $1,251,245 | $1,328,430 | +6.0% | +27% | TxDOT |
| 11224006 | IH0035 Preventive maintenance of traffic signals from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 1 | Austin Traffic Signal Construction Co., Inc. | $1,241,630 | +24% | TxDOT | ||
| 11223018 | CS Rehabilitate bridge from NEFF'S WAY to ALLEN STREET | San Angelo District | 6 | Relmco, Inc. | $1,186,200 | $1,247,853 | +5.0% | +9.0% | TxDOT |
| 11223015 | IH 35 Preventive maintenance from FM 2001 to TRAVIS CL | Austin District | 4 | Lone Star Paving Company | $1,151,607 | $1,370,158 | +19% | -23% | TxDOT |
| 11223022 | FM 1660 Resurface roadway from ORGAIN STEET to KING LANE | Austin District | 3 | Austin Bridge & Road Services, LP | $1,092,800 | $1,195,888 | +9.0% | +19% | TxDOT |
| 11224010 | IH0010 Miscellaneous concrete repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 3 | International Eagle Enterprises, Inc. | $968,500 | $1,112,678 | +15% | -1.0% | TxDOT |
| 11223020 | SH 183 Embankment stabilization from CONN J WB SH183 | Fort Worth District | 4 | Ragle Construction, Inc. | $857,399 | $877,712 | +2.0% | -4.0% | TxDOT |
| 11223021 | CR Bridge replacement from CR 118 @ GARY CREEK to (MAP #007) | Waco District | 4 | Hodges and Son Construction Company, Inc. | $799,353 | $913,368 | +14% | +12% | TxDOT |
| 11223019 | FM 973 Resurface roadway from FM 812 to US 183 | Austin District | 4 | Lone Star Paving Company | $791,290 | $796,023 | +1.0% | -15% | TxDOT |
| 11224007 | US0090 Base repair with seal coat and/or overlay from 4.14 MI E OF FM 365 to 0.52 MILE EAST CHINA | Beaumont District | 2 | Texas Materials Group, Inc. | $773,425 | $855,895 | +11% | +15% | TxDOT |
| 11224005 | IH0020 Aggregate from VARIOUS ROADWAYS IN THE ATL DISTRIC | Atlanta District | 2 | RK Hall, LLC | $727,489 | $967,320 | +33% | +42% | TxDOT |
| 11224009 | SH0031 Traffic control services from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION | Dallas District | 4 | FC Traffic Control, Inc. | $650,740 | $668,760 | +3.0% | -5.0% | TxDOT |
| 11224011 | IH0610 Roadsign assemblies from MARKET ST to MCCARTY ST | Houston District | 3 | Forde Construction Company, Inc. | $597,486 | $620,995 | +4.0% | +20% | TxDOT |
| 11224014 | SH0208 Crack seal from DISTRICT WIDE to DISTRICT WIDE | San Angelo District | 6 | D & M Contractors, LLC | $532,570 | $599,988 | +13% | -28% | TxDOT |
| 11224012 | US0059 Traffic control services from SAN JACINTO/POLK MAINT SECTIONS to VARIOUS LOCATIONS | Lufkin District | 4 | Statewide Safety Systems | $516,075 | $673,950 | +31% | -1.0% | TxDOT |
| 11223024 | RM 150 Preventive maintenance from 0.015 MI. WEST OF WALLACE ST. to IH 35 NBFR | Austin District | 3 | Lone Star Paving Company | $482,720 | $493,072 | +2.0% | +47% | TxDOT |
| 11224008 | IH0045 Metal beam guard fence repair from VARIOUS to VARIOUS | Bryan District | 6 | Rhino Equity, LLC | $382,055 | $478,876 | +25% | -24% | TxDOT |
| 11224004 | IH0040 Cable median barrier system repair from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 3 | BK Field Operations LLC | $285,464 | $475,690 | +67% | -16% | TxDOT |
| 11224013 | US0059 Debris removal from ANGELINA & NACOGDOCHES MAINT. SECT. to VARIOUS LOCATIONS | Lufkin District | 3 | American Infrastructure Maintenance Management LLC | $282,328 | $415,060 | +47% | -39% | TxDOT |
| 11223023 | VA Landscape development from US 183 @ US 77A to CLINTON RD | Yoakum District | 2 | Texas Road Construction, LLC | $151,104 | $208,792 | +38% | +19% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.