Brannan Paving Co., LTD.: TxDOT bid record
Brannan Paving Co., LTD. submitted 94 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 06 DEC 2023, and was the low bidder on 30 of them (32%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $224,447,255
- Latest bid
- 06 DEC 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 25 | 8 | 32% |
| 2021 | 34 | 8 | 24% |
| 2022 | 15 | 6 | 40% |
| 2023 | 20 | 8 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Yoakum District | 14 | 6 | 43% |
| Corpus Christi District | 10 | 3 | 30% |
| Pharr District | 10 | 6 | 60% |
| Laredo District | 9 | 2 | 22% |
| Odessa District | 9 | 0 | 0% |
| Waco District | 7 | 3 | 43% |
| Brownwood District | 5 | 4 | 80% |
| San Angelo District | 4 | 2 | 50% |
| Lubbock District | 4 | 0 | 0% |
| San Antonio District | 4 | 0 | 0% |
| El Paso District | 3 | 1 | 33% |
| Lufkin District | 2 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ronald R. Wagner & Co., LP | 47 | 28 of 47 |
| CK Newberry, LLC | 40 | 15 of 40 |
| Clark Construction of Texas, Inc. | 27 | 10 of 27 |
| Cox Paving of Texas, Inc. | 19 | 15 of 19 |
| Hunter Industries, LTD. | 16 | 7 of 16 |
| Tierra Lease Service, LLC | 11 | 3 of 11 |
| D. I. J. Construction, Inc. | 11 | 5 of 11 |
| Northeastern Pavers, LLC | 9 | 3 of 9 |
| J. Carroll Weaver, Inc. | 8 | 3 of 8 |
| Lipham Asphalt and Paving Company, LLC | 8 | 3 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 DEC 2023 | 12233203 | San Angelo District | US 83 Seal coat from 15.886 MILES SO OF KERR COUNTY LINE to RM 336 (IN LEAKEY) | 3 of 3 | $12,169,762 | +18% |
| 05 DEC 2023 | 12233026 | El Paso District | BI 10-C Preventive maintenance from 1.64 MI W OF RM 1111 to 1.32 MI E OF RM 1111 | 2 of 3 | $15,192,746 | +2.0% |
| 02 NOV 2023 | 11233204 | Yoakum District | US 90 Seal coat from GONZALES C/L to FAIRES STREET (FLATONIA) | 2 of 3 | $20,419,097 | +3.0% |
| 01 NOV 2023 | 11233008 | Brownwood District | US 180 Seal coat from FM 3099 to HARDING STREET | 1 of 4 | $13,778,330 | Low, 2.0% under the second |
| 01 NOV 2023 | 11233021 | Brownwood District | US 84 Preventive maintenance from CR 332 to HAMILTON C/L | 1 of 4 | $4,495,363 | Low, 13% under the second |
| 07 SEP 2023 | 09233212 | Odessa District | IH 10 Fy 2024 seal coat - crumb rubber from SH 18 to 0.759 MI E OF US 67, ETC. | 2 of 2 | $15,581,191 | +8.0% |
| 07 SEP 2023 | 09233213 | Corpus Christi District | IH 37 Rehabilitate existing roadway from SH 188 to 0.47 MI SOUTH OF SH 188 (CONTROL BR | 1 of 7 | $6,031,422 | Low, 2.0% under the second |
| 07 SEP 2023 | 09233214 | Odessa District | SH 18 Fy 2024 seal coat from 0.22 MI S OF FM 1776 to PECOS COUNTY LINE, ETC. | 4 of 4 | $13,864,335 | +6.0% |
| 07 SEP 2023 | 09233216 | Pharr District | IH 2 Preventive maintenance from FM 2557 to FM 1423 | 2 of 3 | $6,860,930 | +6.0% |
| 07 SEP 2023 | 09233222 | Pharr District | FM 511 Preventive maintenance from OLD PORT ISABEL RD. to CHARMAINE LANE | 1 of 3 | $4,012,544 | Low, 1.0% under the second |
| 06 SEP 2023 | 09233006 | Laredo District | US 277 Seal coat from 12.336 MI SOUTH OF EDWARDS COUNTY L to US 377 | 3 of 4 | $11,553,728 | +19% |
| 06 SEP 2023 | 09233008 | Waco District | FM 217 Seal coat from BOSQUE C/L to FM 182 | 1 of 5 | $7,582,812 | Low, 10% under the second |
| 06 SEP 2023 | 09233010 | Waco District | US 84 Seal coat from FM 930 to US 281 | 2 of 2 | $10,490,452 | +34% |
| 06 SEP 2023 | 09233012 | Corpus Christi District | FM 887 Rehabilitate existing roadway from .1 MI E OF FM 2724 to SH 123 | 1 of 4 | $7,291,794 | Low, 5.0% under the second |
| 06 SEP 2023 | 09233016 | Laredo District | US 59 Seal coat from 12 MILES EAST OF SL20 to 1.982 MIES EAST OF SL20 | 3 of 4 | $6,311,640 | +18% |
| 01 JUN 2023 | 06233018 | Laredo District | FM 2644 Widen road - add shoulders from 5.0 MI EAST OF FM 1021 INTERSECTION to FM 1021 INTERSECTION | 3 of 3 | $3,064,657 | +14% |
| 04 MAY 2023 | 05233015 | Yoakum District | FM 3012 Resurface roadway from 0.75 MI. SOUTH OF SH 60 to FM 1096 | 1 of 5 | $5,786,574 | Low, 11% under the second |
| 04 MAY 2023 | 05233022 | Yoakum District | SH 172 Hazard elimination & safety from 0.60 MI SOUTH OF FM 2143 to END OF STATE MAINTENANCE | 1 of 4 | $2,118,839 | Low, 27% under the second |
| 08 MAR 2023 | 03233215 | San Antonio District | FM 1333 Hazard elimination & safety from SH 713 to COUNTY ROAD 210 | 8 of 8 | $5,382,214 | +34% |
| 07 MAR 2023 | 03233020 | Corpus Christi District | PR 25A State park improvements from AT LAKE CORPUS CHRISTI STATE PARK | 8 of 9 | $3,600,356 | +48% |
| 01 DEC 2022 | 12223003 | Paris District | US 82 Preventive maintenance from SH 37 to BU 37 | 1 of 1 | $19,399,613 | Low |
| 01 DEC 2022 | 12223011 | El Paso District | SH 118 Preventive maintenance from 17.35 MI N FM 170 to 2.75 MI S FM 170 | 2 of 2 | $5,776,888 | +8.0% |
| 03 NOV 2022 | 11223205 | Yoakum District | UA 90 Seal coat from SH 80 to 0.25 MI E OF CR 143 | 1 of 4 | $18,739,125 | Low, 0.0% under the second |
| 03 NOV 2022 | 11223227 | Lubbock District | US 70 Seal coat from UVALDE STREET to SH 214 | 2 of 2 | $1,817,402 | +28% |
| 02 NOV 2022 | 11223004 | Brownwood District | US 180 Preventive maintenance from US 183 to BURNET C/L | 1 of 4 | $14,954,533 | Low, 1.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.