TxDOT letting results, December 5, 2023
28 contracts let by Texas DOT on December 5, 2023, $396,669,420 in low bids, a median of 4 bidders per contract. On the 28 with an engineer's estimate, the low bid came in under it 19 times; median low bid -8.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 28
- Low bids, total
- $396,669,420
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 12233028 | US 77 Interstate designation from NORIAS RD to 1.34 MI N OF WILLACY/KENEDY C.L. | Pharr District | 5 | Posillico Civil, Inc. | $190,998,296 | $229,719,235 | +20% | +5.0% | TxDOT |
| 12233003 | SH 159 Surfacing/roadway restoration from BS 71E to SH 237 | Yoakum District | 4 | Hunter Industries, LTD. | $21,356,225 | $22,387,969 | +5.0% | +1.0% | TxDOT |
| 12233002 | SH 185 Surfacing/roadway restoration from US 59 to CALHOUN C/L | Yoakum District | 1 | Hunter Industries, LTD. | $17,374,126 | -4.0% | TxDOT | ||
| 12233008 | IH 30 Preventive maintenance from SS 302 (NFR) to HOPKINS COUNTY LINE (NFR) | Paris District | 3 | CDM Holdings | $15,007,962 | $15,658,964 | +4.0% | -4.0% | TxDOT |
| 12233026 | BI 10-C Preventive maintenance from 1.64 MI W OF RM 1111 to 1.32 MI E OF RM 1111 | El Paso District | 3 | Cox Paving of Texas, Inc. | $14,907,765 | $15,192,746 | +2.0% | +9.0% | TxDOT |
| 12233007 | IH 40 Bridge maintenance from AT BI 40 F | Amarillo District | 5 | Built Right Construction of Oklahoma, LLC | $13,665,831 | $16,559,110 | +21% | -8.0% | TxDOT |
| 12233010 | FM 2678 Widen road - add lanes from FM 774 to FM 136 | Corpus Christi District | 4 | Anderson Columbia Co., Inc. | $13,060,414 | $13,445,431 | +3.0% | -28% | TxDOT |
| 12233006 | US 283 Seal coat from FM 1835 to FM 1661 | Abilene District | 3 | Lipham Asphalt and Paving Company, LLC | $12,676,446 | $13,320,962 | +5.0% | -13% | TxDOT |
| 12233009 | US 82 Overlay from DICKENS ECL, EAST to 8.23 MILES (WBL) | Childress District | 5 | A. L. Helmcamp, Inc. | $11,319,018 | $11,454,346 | +1.0% | +16% | TxDOT |
| 12233012 | US 87 Construct pedestrian infrastructure from RUSSELL LONG BLVD to SOUTH CANYON CITY LIMITS | Amarillo District | 4 | Ti-Zack Concrete, LLC | $9,542,615 | $10,257,567 | +7.0% | +19% | TxDOT |
| 12233005 | SH 21 Preventive maintenance from HAYS COUNTY LINE to BASTROP COUNTY LINE | Austin District | 4 | Lone Star Paving Company | $9,312,832 | $9,419,269 | +1.0% | -22% | TxDOT |
| 12233018 | SL 338 Highway improvement from SOUTH OF W YUKON RD to WEST OF US 385N | Odessa District | 2 | Jones Bros. Dirt & Paving Contractors, Inc. | $7,949,950 | $8,429,802 | +6.0% | -8.0% | TxDOT |
| 12233011 | RM 1431 Resurface roadway from LLANO C/L to RM 1980 | Austin District | 6 | Lone Star Paving Company | $7,574,977 | $7,959,999 | +5.0% | -17% | TxDOT |
| 12233019 | IH 45 Bridge maintenance from PENNSYLVANIA AVE to IH 30 | Dallas District | 3 | Ragle Construction, Inc. | $7,188,412 | $7,512,309 | +5.0% | -14% | TxDOT |
| 12233013 | US 380 Preventive maintenance from HASKELL EAST CITY LIMITS to THROCKMORTON COUNTY | Abilene District | 5 | A. L. Helmcamp, Inc. | $7,148,853 | $7,791,517 | +9.0% | -8.0% | TxDOT |
| 12233016 | US 180 Surfacing/roadway restoration from SUNSET ST. to FM 3099 | Brownwood District | 3 | Northeastern Pavers, LLC | $6,649,968 | $6,688,061 | +1.0% | -4.0% | TxDOT |
| 12233014 | VA Rehabilitate bridge from VAR LOCATIONS IN SE HARRIS AO BOUND | Houston District | 6 | Ragle Construction, Inc. | $4,990,801 | $6,220,713 | +25% | -29% | TxDOT |
| 12233015 | SH 124 Surfacing/roadway restoration from SH 73, SOUTH to FEAR ROAD | Beaumont District | 2 | Texas Materials Group, Inc. | $4,794,059 | $5,063,903 | +6.0% | -30% | TxDOT |
| 12233022 | SH 19 Hazard elimination & safety from SOUTH LOOP 286 to FM 2716 | Paris District | 6 | Garret Shields Infrastructure | $4,447,953 | $4,493,154 | +1.0% | -7.0% | TxDOT |
| 12233021 | SL 275 Preventive maintenance from BRAKER LANE to PARMER LANE | Austin District | 3 | Hunter Industries, LTD. | $3,285,366 | $3,426,674 | +4.0% | +13% | TxDOT |
| 12233029 | FM 422 Bridge replacement from FM 422 to AT GODWIN CREEK | Wichita Falls District | 4 | THK Construction LLC | $2,860,939 | $3,472,898 | +21% | +8.0% | TxDOT |
| 12233001 | SH 78 Rehabilitate existing roadway from STRATFORD DRIVE to AVENUE F | Dallas District | 4 | Austin Bridge & Road Services, LP | $2,754,566 | $2,890,563 | +5.0% | -3.0% | TxDOT |
| 12233030 | VA Hazard elimination & safety from VARIOUS | Houston District | 2 | Garret Shields Infrastructure | $2,378,449 | $2,394,822 | +1.0% | -11% | TxDOT |
| 12233027 | CR Bridge replacement from CR 526 AT LA NANA BAYOU to CR 526 AT LA NANA BAYOU | Lufkin District | 10 | THK Construction LLC | $2,041,759 | $2,181,590 | +7.0% | -29% | TxDOT |
| 12233017 | SH 225 Surfacing/roadway restoration from IH 610 EAST to SH 146 | Houston District | 4 | Professional Traffic Control LLC | $1,262,658 | $1,824,229 | +44% | -67% | TxDOT |
| 12233023 | VA Bridge maintenance from VARIOUS LOCATIONS | Paris District | 5 | MB Western Industrial Contracting Co. | $851,850 | $865,650 | +2.0% | +13% | TxDOT |
| 12233024 | IH 10 Rehabilitate bridge from 1.03 MI N OF EXECUTIVE CENTER BLVD to 0.93 MI S OF EXECUTIVE ENTER BLVD | El Paso District | 3 | The Truesdell Corporation | $722,722 | $757,086 | +5.0% | -13% | TxDOT |
| 12233025 | VA Preventive maintenance from VARIOUS LOCATIONS | Paris District | 4 | Garret Shields Infrastructure | $544,606 | $674,373 | +24% | +38% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.