TxDOT letting results, November 3, 2022
33 contracts let by Texas DOT on November 3, 2022, $143,394,784 in low bids, a median of 3 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 20 times; median low bid -1.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 33
- Low bids, total
- $143,394,784
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 11223206 | IH 10 Acp overlay from CROCKETT COUNTY LINE to 10.2 MI E OF CROCKETT COUNTY LINE | San Angelo District | 4 | Delhur Industries, Inc. | $21,298,154 | $22,839,593 | +7.0% | -1.0% | TxDOT |
| 11223207 | US 84 Seal coat from 6TH STREET IN MULESHOE to LAMB COUNTY LINE | Lubbock District | 2 | Lipham Asphalt and Paving Company, LLC | $19,522,385 | $20,556,944 | +5.0% | -1.0% | TxDOT |
| 11223205 | UA 90 Seal coat from SH 80 to 0.25 MI E OF CR 143 | Yoakum District | 4 | Brannan Paving Co., LTD. | $18,739,125 | $18,797,992 | 0.0% | -11% | TxDOT |
| 11223208 | FM 2781 Highway improvement from CR 551 to TRINITY COUNTY LINE, ETC. | Lufkin District | 4 | A. L. Helmcamp, Inc. | $12,103,921 | $12,811,394 | +6.0% | -5.0% | TxDOT |
| 11223211 | US 281 Seal coat, striping & rpm's from DISTRICT WIDE | Wichita Falls District | 3 | Northeastern Pavers, LLC | $10,600,584 | $11,182,591 | +5.0% | +16% | TxDOT |
| 11223213 | FM 1385 Rehabilitation of existing road from APPROX 2 MILES NORTH OF FM 428 to FM 455 | Dallas District | 7 | Stateline Construction, LLC | $7,569,743 | $8,149,696 | +8.0% | +2.0% | TxDOT |
| 11223209 | SL 12 Planing, concrete full depth repair,ov & sidewalk from E OF CARBONDALE ST TO I-30 & to SS 408 TO I-35E | Dallas District | 4 | Ragle Construction, Inc. | $7,277,370 | $7,412,680 | +2.0% | +9.0% | TxDOT |
| 11223210 | FM 2090 Surfacing/roadway restoration from FM 3083 to IH 69 | Houston District | 2 | Texas Materials Group, Inc. | $7,041,940 | $8,444,203 | +20% | -12% | TxDOT |
| 11223215 | SH 54 Construct bridge from 1500 FT N OF CROSSING to 1500 FT S OF CROSSING | El Paso District | 1 | Dan Williams Company | $6,330,874 | +61% | TxDOT | ||
| 11223214 | SH 75 Surfacing/roadway restoration from LEAGUE LINE ROAD to SL 336 | Houston District | 3 | Vulcan Materials Asphalt and Construction, LLC | $3,455,794 | $3,816,130 | +10% | -14% | TxDOT |
| 11223216 | VA Bridge maintenance from DISTRICTWIDE to DISTRICTWIDE | Waco District | 2 | SCR Civil Construction, LLC | $3,216,349 | $4,313,514 | +34% | -16% | TxDOT |
| 11224214 | FM0056 Traffic control services from VARIOUS LOCATIONS to IN WACO DISTRICT | Waco District | 3 | Statewide Safety Systems | $2,857,805 | $3,373,600 | +18% | -4.0% | TxDOT |
| 11223219 | US 60 Intersection improvements with right and/or left from SL 335 to CARSON COUNTY LINE | Amarillo District | 3 | L A Fuller & Sons Construction, LTD. | $2,207,755 | $2,299,026 | +4.0% | -1.0% | TxDOT |
| 11223220 | US 380 Install illumination from DENTON COUNTY LINE to LOVERS LANE | Dallas District | 3 | Highway Intelligent Traffic Solutions, Inc. | $2,000,000 | $2,180,605 | +9.0% | -13% | TxDOT |
| 11224213 | US0080 Traffic control services from VARIOUS ROADWAYS IN to WOOD AND VAN ZANDT COUNTIES | Tyler District | 4 | South Texas Illumination, LLC | $1,979,845 | $1,993,660 | +1.0% | -12% | TxDOT |
| 11223218 | FM 492 Bridge replacement from .25 MI N OF BUS 83 to @ EDINBURG MAIN CANAL | Pharr District | 5 | Texas Cordia Construction, LLC | $1,917,664 | $2,174,194 | +13% | -7.0% | TxDOT |
| 11224204 | FM0535 Seal coat aggregate (material only) from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 2 | Touchstone Resources, LLC | $1,759,340 | $2,921,125 | +66% | +7.0% | TxDOT |
| 11223223 | VA Preventive maintenance from VARIOUS LOCATIONS ON US 75 | Paris District | 2 | GHB Equipment Company, L.L.C. | $1,694,730 | $2,399,600 | +42% | +13% | TxDOT |
| 11223227 | US 70 Seal coat from UVALDE STREET to SH 214 | Lubbock District | 2 | Cox Paving of Texas, Inc. | $1,422,922 | $1,817,402 | +28% | +31% | TxDOT |
| 11223224 | CR Bridge replacement from AT PIN OAK BRANCH to STR#AA03-80-001(TEINERT RD) | Yoakum District | 8 | Hodges and Son Construction Company, Inc. | $1,338,297 | $1,356,998 | +1.0% | +8.0% | TxDOT |
| 11223228 | US 96 Surfacing/roadway restoration from 0.3 MI S OF US 190, SOUTH to 1.5 MILES SOUTH | Beaumont District | 3 | Interstate Improvement, Inc. | $1,199,254 | $1,267,915 | +6.0% | -38% | TxDOT |
| 11224211 | IH0069C Installation of traffic signals from DISTRICT WIDE to VARIOUS ROADWAYS | Pharr District | 3 | Traf-Tex, Inc. | $1,120,664 | $1,137,504 | +2.0% | -15% | TxDOT |
| 11223226 | VA Rehabilitate bridge from VARIOUS LOCATIONS | Fort Worth District | 6 | 3LW Civil LLC | $996,995 | $1,115,591 | +12% | -13% | TxDOT |
| 11224212 | US0069 Traffic signal maintenance from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | Tyler District | 2 | Texas Traffic Control Systems, Inc. | $832,600 | $959,320 | +15% | +37% | TxDOT |
| 11224201 | IH0020 Hot-mix cold-laid from VARIOUS LOCATIONS to ABILENE DISTRICT | Abilene District | 2 | Zack Burkett Co. | $802,100 | $1,041,000 | +30% | +3.0% | TxDOT |
| 11224202 | IH0020 Emulsion from VARIOUS LOCATIONS to IN ABILENE DISTRICT | Abilene District | 3 | Wright Asphalt Products Company LLC | $769,260 | $778,380 | +1.0% | -2.0% | TxDOT |
| 11224205 | SH0206 Milling/ hydroblasting (call-out) from VARIOUS | Brownwood District | 4 | TRP Construction Group, LLC | $726,536 | $752,276 | +4.0% | -14% | TxDOT |
| 11224208 | US0380 Tree removal from VARIOUS LOCATIONS WITHIN to WISE & JACK COUNTIES | Fort Worth District | 5 | Shalom Services Corporation | $698,790 | $867,020 | +24% | +12% | TxDOT |
| 11224206 | SH0006 Mowing highway right of way from VARIOUS to VARIOUS | Bryan District | 1 | R&M Incorporated | $528,699 | +40% | TxDOT | ||
| 11224209 | SL0008 Traffic control services from VARIOUS HWYS IN SOUTHEAST HARRIS CO to VARIOUS HWYS IN SOUTHEAST HARRIS CO | Houston District | 7 | Republic Traffic Safety, Inc. | $504,220 | $556,825 | +10% | -10% | TxDOT |
| 11224203 | IH0040 Cable median barrier system repair from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 3 | BK Field Operations LLC | $355,464 | $418,120 | +18% | +5.0% | TxDOT |
| 11224207 | IH0045 Repair/replace concrete barrier from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION | Dallas District | 7 | Ibctx, LLC | $305,600 | $327,100 | +7.0% | -1.0% | TxDOT |
| 11224210 | US0059 Debris removal from POLK & SAN JACINTO MAINTENANCE SEC to VARIOUS LOCATIONS | Lufkin District | 2 | American Infrastructure Maintenance Management LLC | $220,008 | $287,869 | +31% | -37% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.