YearBidsLow bidsWin rate
202049612%
20215935%
202230517%
202334618%
20241300%
TRP Construction Group, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District1616%
Tyler District1300%
Odessa District1300%
Houston District13215%
Austin District11545%
Lubbock District10110%
San Angelo District9111%
Corpus Christi District9222%
Fort Worth District9333%
Abilene District800%
San Antonio District8113%
Yoakum District7229%
TRP Construction Group, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO11262 (55%)$1,500.00$5,000.00
TMA (mobile operation)505-7003DAY7929 (37%)$100.00$291.17
Eliminating existing pavement marking & markers (word)677-6012EACH6324 (38%)$55.00$67.00
TMA (stationary)505-7001DAY5524 (44%)$100.00$230.00
Reflectorized pavement marker type I-C672-7002EACH8023 (29%)$3.75$5.00
Reflectorized pavement marker type II-A-A672-7004EACH10419 (18%)$3.50$5.00
Reflectorized pavement marker type II-C-R672-7006EACH7519 (25%)$4.00$5.00
Eliminating existing pavement marking & markers (arrow)677-6008EACH6219 (31%)$50.00$61.11
Eliminating existing pavement marking & markers (double arrow)677-6009EACH4017 (43%)$61.00$75.00
Mobilization (callout)500-7002EACH3816 (42%)$1,675.00$688.00
Preformed in-lane(trans) rumble strip6056-6001LF2816 (57%)$6.85$15.00
Pavement sealer 24"666-6230-007LF4315 (35%)$1.35$2.00
TRP Construction Group, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

TRP Construction Group, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 MAR 202403243217Odessa DistrictVA Preventive maintenance from DISTRICTWIDE5 of 8$849,227+20%
05 MAR 202403243023Waco DistrictVA Hazard elimination & safety from VARIOUS to VARIOUS3 of 8$3,152,493+9.0%
05 MAR 202403243027Odessa DistrictVA Preventive maintenance from DISTRICTWIDE6 of 7$4,559,618+34%
05 MAR 202403243032Lubbock DistrictVA Hazard elimination & safety from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT2 of 3$2,196,751+23%
02 FEB 202402243213Lubbock DistrictVA Fy 2024 striping from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT4 of 4$10,993,229+54%
02 FEB 202402243223Lufkin DistrictVA Highway improvement from VARIOUS LOCATIONS DISTRICTWIDE5 of 7$3,339,414+27%
02 FEB 202402244222Houston DistrictIH0010 Pavement markings graphics from VARIOUS HIGHWAYS IN WEST HARRIS CO. to VARIOUS HIGHWAYS IN WEST HARRIS CO.2 of 5$586,165+12%
01 FEB 202402243015Brownwood DistrictVA Preventive maintenance from DISTRICTWIDE4 of 6$8,437,196+65%
01 FEB 202402243023Beaumont DistrictVA Hazard elimination & safety from DISTRICT WIDE3 of 5$1,192,790+34%
01 FEB 202402244022Paris DistrictUS0082 Reflective pavement markings (long line) from VARIOUS ROADWAYS IN to PARIS DISTRICT5 of 8$1,428,431+27%
01 FEB 202402244030Bryan DistrictSH0006 Pavement markings from VARIOUS to VARIOUS7 of 7$778,100+58%
04 JAN 202401243032Atlanta DistrictVA Highway improvement from VARIOUS LOCATIONS to VARIOUS LOCATIONS4 of 5$4,992,327+71%
04 JAN 202401243033Childress DistrictVA Striping from DISTRICT WIDE2 of 6$1,646,894+16%
06 DEC 202312233211Laredo DistrictVA Preventive maintenance from DISTRICTWIDE4 of 4$997,506+25%
05 DEC 202312233017Houston DistrictSH 225 Surfacing/roadway restoration from IH 610 EAST to SH 1464 of 4$2,234,033+77%
20 NOV 202311231304Yoakum DistrictFM0109 Rehabilitation of existing roadway from DISTRICT WIDE1 of 3$362,420Low, 11% under the second
02 NOV 202311233212Paris DistrictVA Hazard elimination & safety from VARIOUS LOCATIONS1 of 5$3,141,295Low, 7.0% under the second
06 SEP 202309233020Yoakum DistrictVA Hazard elimination & safety from DISTRICTWIDE3 of 6$1,767,999+23%
03 AUG 202308233225Bryan DistrictSH 19 Profile markings from 0.4 MI N OF SH 30 to IH 454 of 5$5,276,519+25%
03 AUG 202308233243Waco DistrictVA Maintenance & operations project from VARIOUS to VARIOUS7 of 8$3,348,500+39%
03 AUG 202308233256Pharr DistrictIH 69E Hazard elimination & safety from FM 732 to .05 MI S OF BU 772 of 3$498,489+2.0%
02 AUG 202308233038Corpus Christi DistrictVA Highway improvement from AT VARIOUS LOCATIONS IN CC DISTRICT6 of 7$8,639,316+63%
02 AUG 202308233046Houston DistrictIH 610 Surfacing/roadway restoration from IH 10 E to SH 2252 of 2$1,186,385+1.0%
27 JUN 202306233423Dallas DistrictVA Reflectorized pvmt mrks &mrkrs from VARIOUS LOCATIONS to IN DALLAS COUNTY3 of 3$5,737,341+45%
02 JUN 202306233217San Antonio DistrictVA Preventive maintenance from VARIOUS LOCATIONS DISTRICTWIDE1 of 6$5,176,272Low, 9.0% under the second
TRP Construction Group, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy