Pmi Pavement Marking, LLC: TxDOT bid record
Pmi Pavement Marking, LLC submitted 95 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 07 OCT 2026, and was the low bidder on 15 of them (16%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $14,842,289
- Latest bid
- 07 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 21 | 5 | 24% |
| 2021 | 51 | 7 | 14% |
| 2022 | 2 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 3 | 0 | 0% |
| 2025 | 11 | 0 | 0% |
| 2026 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Odessa District | 16 | 1 | 6% |
| Dallas District | 10 | 1 | 10% |
| Houston District | 9 | 2 | 22% |
| El Paso District | 8 | 4 | 50% |
| Lubbock District | 7 | 0 | 0% |
| Lufkin District | 6 | 1 | 17% |
| San Angelo District | 5 | 2 | 40% |
| Fort Worth District | 5 | 0 | 0% |
| Corpus Christi District | 4 | 1 | 25% |
| Bryan District | 3 | 1 | 33% |
| Waco District | 2 | 0 | 0% |
| Beaumont District | 2 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Stripe-A-Zone, LLC | 67 | 49 of 67 |
| TRP Construction Group, LLC | 63 | 28 of 63 |
| Total Highway Maintenance, LLC | 36 | 8 of 36 |
| Striping Technology, L.P. | 36 | 20 of 36 |
| Batterson, LLP | 33 | 21 of 33 |
| Interstate Barricades & Markings, Inc. | 31 | 10 of 31 |
| L&L Company | 29 | 22 of 29 |
| Centerline Technologies, LLC | 28 | 20 of 28 |
| Double A Contracting, L.P. | 21 | 13 of 21 |
| D. I. J. Construction, Inc. | 19 | 10 of 19 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | A00131942 | San Angelo District | Highway Improvement, Various (Various Locations in SJT District to .) | 7 of 7 | $3,376,355 | +33% |
| 01 JUL 2026 | A00187817 | Odessa District | Preventive Maintenance, Various (Districtwide to .) | 7 of 8 | $7,599,052 | +38% |
| 04 JUN 2026 | A00219697 | El Paso District | PAVEMENT MARKINGS, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 1 of 2 | $500,077 | Low, 2.0% under the second |
| 21 APR 2026 | A00219871 | Odessa District | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0020 (VARIOUS to VARIOUS) | 1 of 6 | $207,027 | Low, 6.0% under the second |
| 05 FEB 2026 | A00187101 | Lubbock District | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT) | 5 of 10 | $7,396,318 | +14% |
| 14 OCT 2025 | A00217649 | Lubbock District | PAVEMENT MARKINGS, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 5 of 5 | $1,347,133 | +71% |
| 08 AUG 2025 | A00178217 | Odessa District | Preventive Maintenance, Various (Districtwide to .) | 4 of 8 | $3,069,645 | +6.0% |
| 07 AUG 2025 | A00213876 | Waco District | PAVEMENT MARKINGS, SH0195 (VARIOUS ROADWAYS to ACROSS WACO DISTRICT) | 7 of 11 | $3,319,796 | +25% |
| 02 JUL 2025 | A00215331 | Laredo District | PAVEMENT MARKINGS, US0083 (Various to Various) | 4 of 5 | $1,012,168 | +58% |
| 08 APR 2025 | A00214411 | Odessa District | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0020 (VARIOUS to VARIOUS) | 2 of 6 | $497,350 | +8.0% |
| 11 MAR 2025 | A00212967 | Odessa District | RAISED PAVEMENT MARKINGS, IH0010 (VARIOUS to VARIOUS) | 4 of 5 | $116,024 | +32% |
| 11 MAR 2025 | A00212969 | Odessa District | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0020 (VARIOUS to VARIOUS) | 3 of 7 | $412,150 | +5.0% |
| 05 MAR 2025 | A00191310 | Lubbock District | Hazard Elimination & Safety, Various (Various locations in to the Lubbock District) | 4 of 5 | $2,333,012 | +63% |
| 11 FEB 2025 | A00212968 | Odessa District | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0010 (VARIOUS to VARIOUS) | 2 of 4 | $262,050 | +8.0% |
| 07 FEB 2025 | A00212598 | Laredo District | Preventive Maintenance, Various (DISTRICTWIDE to -) | 3 of 9 | $1,712,827 | +19% |
| 06 FEB 2025 | A00141080 | Lubbock District | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT) | 5 of 7 | $9,597,559 | +35% |
| 04 DEC 2024 | A00058845 | El Paso District | Preventive Maintenance, Various (DISTRICTWIDE to .) | 2 of 4 | $4,492,765 | +13% |
| 06 MAR 2024 | 03243217 | Odessa District | VA Preventive maintenance from DISTRICTWIDE | 8 of 8 | $967,132 | +37% |
| 05 MAR 2024 | 03243027 | Odessa District | VA Preventive maintenance from DISTRICTWIDE | 3 of 7 | $4,233,267 | +25% |
| 06 DEC 2023 | 12233228 | El Paso District | VA Preventive maintenance from DISTRICTWIDE | 1 of 3 | $4,800,000 | Low, 3.0% under the second |
| 04 MAY 2023 | 05234015 | El Paso District | IH0010 Districtwide striping from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 2 of 3 | $734,025 | +13% |
| 04 FEB 2022 | 02223211 | El Paso District | VA Preventive maintenance from DISTRICTWIDE | 5 of 6 | $3,988,603 | +30% |
| 06 JAN 2022 | 01223026 | Amarillo District | VA Highway improvement from DISTRICT WIDE | 3 of 3 | $1,152,773 | +16% |
| 14 OCT 2021 | 10211103 | Lufkin District | US0059 Raised pavement markings from VARIOUS LOCATIONS to DISTRICT WIDE | 5 of 5 | $347,625 | +35% |
| 14 OCT 2021 | 10211104 | Lufkin District | US0059 Thermoplastic pavement markings from VARIOUS LOCATIONS to DISTRICT WIDE | 4 of 5 | $368,250 | +36% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.