TxDOT letting results, February 7, 2025
36 contracts let by Texas DOT on February 7, 2025, $978,065,824 in low bids, a median of 5 bidders per contract. On the 36 with an engineer's estimate, the low bid came in under it 27 times; median low bid -15% against the estimate.
- Owner
- Texas DOT
- Contracts
- 36
- Low bids, total
- $978,065,824
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00132721 | Widen Road - Add Lanes, IH 30 (IH 35E to IH 45) | Dallas District | 2 | Balfour Beatty Infrastructure, Inc. | $888,696,937 | $957,119,963 | +8.0% | +12% | TxDOT |
| A00195465 | Bridge Replacement, IH 40 (At IH 40 to .) | Amarillo District | 6 | Altus Construction LLC | $9,874,035 | $10,755,504 | +9.0% | -7.0% | TxDOT |
| A00206923 | Preventive Maintenance, US 84 (0.6 MILES NORTH OF FM 1611 to US 180) | Abilene District | 5 | RK Hall, LLC | $8,390,976 | $9,104,135 | +8.0% | -24% | TxDOT |
| A00188135 | Resurface Roadway, IH 10 (Crossroads to SP 421 (Culebra Rd.)) | San Antonio District | 5 | Lone Star Paving Company | $6,824,351 | $7,024,780 | +3.0% | -16% | TxDOT |
| A00194696 | Surfacing/Roadway Restoration, US 82 (US 183 to CR 218) | Wichita Falls District | 5 | A. L. Helmcamp, Inc. | $5,952,851 | $6,034,395 | +1.0% | -12% | TxDOT |
| A00196024 | Resurface Roadway, SH 94 (0.075 mi E of SL 287 to Herndon St) | Lufkin District | 2 | Texas Materials Group, Inc. | $4,633,048 | $5,242,333 | +13% | +10% | TxDOT |
| A00191986 | Bridge Replacement, US 287 (US 287 @ Drainage Ditch to .) | Childress District | 3 | Hodges and Son Construction Company, Inc. | $4,458,100 | $4,492,694 | +1.0% | +40% | TxDOT |
| A00064408 | Roadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD) | Tyler District | 7 | Madden Contracting Company, LLC. | $4,258,941 | $4,266,345 | 0.0% | -31% | TxDOT |
| A00183926 | Rehabilitate Existing Roadway, FM 46 (SH 6 to Robertson CL) | Waco District | 6 | Big Creek Construction, LTD. | $3,949,757 | $4,117,509 | +4.0% | -20% | TxDOT |
| A00194788 | Bridge Maintenance, Various (Various locations to in the Wichita Falls District) | Wichita Falls District | 8 | THK Construction LLC | $3,651,021 | $3,717,404 | +2.0% | -10% | TxDOT |
| A00130693 | Surfacing/Roadway Restoration, SH 75 (SL 336N to SH 105) | Houston District | 6 | Vulcan Materials Asphalt and Construction, LLC | $3,303,124 | $3,596,899 | +9.0% | -22% | TxDOT |
| A00196618 | Rehabilitate Existing Roadway, IH 10 (HAMSHIRE ROAD, EAST to NORTH FORK TAYLOR BAYOU) | Beaumont District | 6 | Texas Materials Group, Inc. | $3,084,194 | $3,358,647 | +9.0% | -35% | TxDOT |
| A00131543 | Resurface Roadway, SH 183 (East of US 377 to West of Big Fossil Creek) | Fort Worth District | 5 | Jagoe-Public Company | $3,019,197 | $3,259,362 | +8.0% | -14% | TxDOT |
| A00209767 | Resurface Roadway, IH 20 (UPRR (CONC PVT) to HARRISON CL) | Tyler District | 3 | Grey Sky Construction LLC | $2,992,886 | $3,049,171 | +2.0% | +16% | TxDOT |
| A00213106 | THERMOPLASTIC PAVEMENT MARKINGS, US0183 (DISTRICT-WIDE to DISTRICT-WIDE) | Brownwood District | 7 | D. I. J. Construction, Inc. | $2,694,773 | $2,784,325 | +3.0% | -9.0% | TxDOT |
| A00201293 | Bridge Maintenance, RM 1674 (At Copperas Creek to .) | San Angelo District | 9 | MPB, Inc. | $1,716,914 | $1,943,198 | +13% | -26% | TxDOT |
| A00196288 | Traffic Signal Improvements, Various (Districtwide Traffic Control FY 2025 to Project 1) | San Antonio District | 3 | Elecnor Belco Electric, Inc. | $1,500,970 | $1,598,084 | +6.0% | +3.0% | TxDOT |
| A00197744 | Construct Pedestrian Infrastructure, BU 82J (SH 37 to N High St) | Paris District | 11 | Aad Contracting Inc. | $1,486,446 | $1,506,755 | +1.0% | -15% | TxDOT |
| A00212598 | Preventive Maintenance, Various (DISTRICTWIDE to -) | Laredo District | 9 | Centerline Technologies, LLC | $1,443,019 | $1,539,904 | +7.0% | -28% | TxDOT |
| A00141081 | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT) | Lubbock District | 5 | TRP Infrastructure Services, LLC | $1,393,454 | $1,470,538 | +6.0% | -8.0% | TxDOT |
| A00193298 | Intersection Improvements With Right And/Or Left Turn Lanes, US 77 (0.26 Mi N of FM 1712 to 0.25 Mi S of FM 1712) | Bryan District | 7 | Larry Young Paving, Inc. | $1,382,358 | $1,396,088 | +1.0% | -28% | TxDOT |
| A00131231 | Install/Upgrade Roadway Lighting, Various (Various locations on FM 2234 & FM 518 to .) | Houston District | 10 | Third Coast Services LLC | $1,290,192 | $1,363,062 | +6.0% | -14% | TxDOT |
| A00135357 | Resurface Roadway, US 183 (E of IH 35 to E of US 290) | Austin District | 3 | Lone Star Paving Company | $1,181,539 | $1,201,195 | +2.0% | -17% | TxDOT |
| A00209365 | Preventive Maintenance, Various (Various Locations to in Denton County) | Dallas District | 4 | Stripe-A-Zone, LLC | $1,152,494 | $1,345,236 | +17% | -40% | TxDOT |
| A00178157 | Traffic Signal Improvements, Various (Districtwide to .) | Odessa District | 3 | Grey Sky Construction LLC | $1,136,733 | $1,391,014 | +22% | +6.0% | TxDOT |
| A00213065 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), US0082 (Various locations in to Paris District) | Paris District | 8 | Stripe-A-Zone, LLC | $1,063,284 | $1,076,551 | +1.0% | -34% | TxDOT |
| A00212806 | EMULSION, US0287 (Various Counties to Wichita Falls District) | Wichita Falls District | 2 | Ergon Asphalt & Emulsions, Inc. | $1,044,600 | $1,063,700 | +2.0% | -20% | TxDOT |
| A00210073 | METAL BEAM GUARD FENCE REPAIR, US0281 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 4 | BK Field Operations LLC | $1,043,063 | $1,256,081 | +20% | -73% | TxDOT |
| A00209715 | Highway Improvement, IH 10 (At Brittmoore Road to .) | Houston District | 3 | MC2 Civil, LLC | $926,322 | $1,143,050 | +23% | -34% | TxDOT |
| A00205303 | Transportation Non-Roadway, US 183 (RM 620 EBFR to 0.09 MI N of Pecan Park Blvd) | Austin District | 4 | Aaron Concrete Contractors, LLC | $922,697 | $937,604 | +2.0% | -16% | TxDOT |
| A00207189 | State Park Improvements, Various (Kerr Wildlife Management Area to .) | San Antonio District | 7 | Lone Star Paving Company | $908,186 | $995,652 | +10% | -19% | TxDOT |
| A00203744 | Bridge Maintenance, SL 1 (LP 1 SB to STR#14-227-0-3136-01-125.) | Austin District | 5 | Gibson & Associates, Inc. | $720,110 | $728,419 | +1.0% | +12% | TxDOT |
| A00184342 | Hazard Elimination & Safety, FM 1581 (4.0 Mi.Southwest of IH 35 to 0.25 Mi. Southwest of CR 4243) | San Antonio District | 7 | Hunter Industries, LTD. | $614,054 | $699,311 | +14% | -13% | TxDOT |
| A00140276 | Surfacing/Roadway Restoration, FM 3155 (Richmond State School to UA 90) | Houston District | 7 | Durwood Greene Construction Co. | $585,949 | $589,897 | +1.0% | -7.0% | TxDOT |
| A00193537 | Hazard Elimination & Safety, IH 30 (at University Ave to .) | Atlanta District | 3 | WG Engineering & Construction, LLC | $414,401 | $475,167 | +15% | +26% | TxDOT |
| A00186783 | Hazard Elimination & Safety, BS 288B (At Kyle Road to .) | Houston District | 4 | Traf-Tex, Inc. | $354,848 | $370,729 | +4.0% | +14% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.