TxDOT contract A00196618 bid tabulation

Rehabilitate Existing Roadway, IH 10 (HAMSHIRE ROAD, EAST to NORTH FORK TAYLOR BAYOU). Let by Texas DOT on February 7, 2025, Jefferson, Beaumont District. 6 bids received; low bid $3,084,194 by Texas Materials Group, Inc., -35% against the engineer's estimate of $4,738,305.

Owner
Texas DOT
Letting
07 FEB 2025
Pay items
55
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Texas Materials Group, Inc.$3,084,194Low-35%
2Cornerstone Paving and Construction, L.L.C.$3,358,647+9.0%-29%
3Elite Contractors and Equipment LTD$4,272,542+39%-10%
4Ragle Construction, Inc.$4,286,390+39%-10%
5Grey Sky Construction LLC$4,791,178+55%+1.0%
6MB Western Industrial Contracting Co.$4,976,691+61%+5.0%
TxDOT contract A00196618: bids by rank

Engineer's estimate: $4,738,305.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Texas Materials Group, Inc.2. Cornerstone Paving and Construction, L.L.C.3. Elite Contractors and Equipment LTD4. Ragle Construction, Inc.5. Grey Sky Construction LLC6. MB Western Industrial Contracting Co.
1Preparing row (100-7002)STA37$3,500.00$650.00$900.00$755.00$12,000$10,810$5,000.00
2Subgr widen (OC) (112-7001)STA153.48$400.00$438.00$580.00$780.00$850.00$250.00$800.00
3Backfill (type A or B) (134-7004)STA153.48$316.00$202.00$275.00$95.00$150.00$250.00$260.00
4Broadcast seed (permanent_rural_clay) (164-7002)SY18,510$0.33$0.13$0.60$0.15$0.60$1.00$0.50
5Vegetative watering (168-7001)TGL30$35.00$11.50$50.00$325.00$125.00$50.00$100.00
6FL BS (compacted in place)(type A GR 1-2) (4") (247-7021)SY46,244$25.00$11.50$14.00$15.00$15.50$12.00$20.00
7FL BS (compacted in place)(type A GR 1-2) (6") (247-7044)SY16,516$30.00$16.50$19.00$23.00$24.00$20.00$22.00
8Rework BS metal (type C)(9")(ord comp) (251-7085)SY46,244$4.00$3.50$1.00$1.75$3.50$4.00$10.00
9Cement (275-7001)TON601$272.50$295.00$275.00$400.00$205.00$350.00$350.00
10Cement TRT (new base)(9") (275-7019)SY46,244$5.00$3.20$3.50$4.00$2.25$12.00$5.00
11Asphalt (RC-250) (316-7016)GAL9,249$10.75$4.30$12.50$5.50$5.75$6.00$7.65
12Aggregate (type-B or L, GR-5) (316-7251)CY356$200.00$206.00$320.00$200.00$275.00$350.00$366.00
13D-GR HMA type-C sac-A PG76-22 (341-7031)TON5,087$200.00$180.00$164.00$235.00$168.50$220.00$226.00
14Tack coat (341-7082)GAL2,775$6.00$4.00$3.50$20.00$4.25$6.00$5.65
15Riprap (mow strip)(4 in) (432-7013)CY82$680.00$720.00$1,200.00$750.00$625.00$550.00$902.00
16Riprap (stone protection)(12 in) (432-7041)CY2$210.00$800.00$200.00$3,850.00$1,500.00$185.00$258.00
17Cleaning and sealing existing joints (CL7) (438-7007)LF104$50.00$50.00$75.00$90.00$100.00$50.00$99.75
18Multi-layer polymer overlay (439-7014)SY222$56.00$115.00$258.00$325.00$200.00$45.00$175.00
19Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH8$3,500.00$1,600.00$2,500.00$2,500.00$1,750.00$2,250.00$3,325.00
20Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH6$4,000.00$2,800.00$3,500.00$4,000.00$2,700.00$3,250.00$4,655.00
21Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH2$7,678.00$6,400.00$4,500.00$8,500.00$6,000.00$3,850.00$6,000.00
22Removing & RE - lay pipe (24 in) (472-7006)LF85$75.00$175.00$60.00$300.00$130.00$200.00$80.00
23Removing & RE - lay pipe (30 in) (472-7008)LF20$40.00$232.00$80.00$375.00$175.00$300.00$107.00
24Mobilization (500-7001)LS1$380,000$124,863$225,000$279,777$430,000$450,000$450,000
25Barricades, signs and traffic handling (502-7001)MO7$3,500.00$1,620.00$4,000.00$21,000$31,800$8,500.00$6,650.00
26Portable changeable message sign (503-7001)DAY99$77.00$70.00$65.00$145.00$95.00$150.00$87.00
27TMA (stationary) (505-7001)DAY99$259.00$315.00$125.00$290.00$275.00$250.00$286.00
28TMA (mobile operation) (505-7003)DAY14$263.00$315.00$125.00$1,500.00$950.00$350.00$250.00
29Rock filter dams (install) (type 4) (506-7004)LF400$53.00$146.00$70.00$170.00$70.00$30.00$40.00
30Rock filter dams (remove) (506-7011)LF400$18.86$8.25$20.00$10.00$20.00$15.00$10.00
31Construction perimeter fence (506-7034)LF9,235$6.00$4.75$5.50$5.50$5.50$20.00$5.00
32Biodegradable erosion control logs (install) (12") (506-7044)LF400$6.82$7.75$7.00$9.50$7.00$9.00$10.00
33Biodegradable erosion control logs (remove) (506-7046)LF400$1.83$1.05$2.00$1.20$2.00$5.00$5.00
34Driveways (base) (530-7015)SY1,025$185.00$14.00$34.00$55.00$35.00$45.00$45.00
35Intrsct, drvways, & turnout (ACP) (530-7022)SY415$65.00$55.00$50.00$100.00$31.00$45.00$41.00
36Mill rumble strips (asphalt) (shoulder) (533-7001)LF29,728$0.23$0.21$0.10$0.40$0.32$0.50$0.32
37Mill rumble strips (asphalt) (centerline) (533-7002)LF14,864$0.28$0.26$0.15$0.40$0.32$0.50$0.45
38Metal W-beam guard fence (timber post) (540-7001)LF1,125$29.00$26.00$22.25$31.00$22.25$25.00$29.60
39Remove metal beam guard fence (542-7001)LF50$3.29$3.25$10.00$4.00$10.00$5.00$13.30
40Remove terminal anchor section (542-7002)EACH2$229.00$260.00$250.00$315.00$250.00$500.00$332.50
41Guardrail end treatment (install) (544-7001)EACH12$3,300.00$2,900.00$3,003.00$3,440.00$3,003.00$3,250.00$3,994.00
42Mailbox install-S (TWG-post) type 2 (560-7002)EACH1$350.00$285.00$350.00$345.00$350.00$850.00$465.50
43Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH9$742.00$675.00$820.00$815.00$820.00$1,500.00$1,090.00
44Remove SM RD SN sup&AM (644-7073)EACH6$122.50$130.00$95.00$155.00$95.00$50.00$126.00
45Install delineator assembly (D-SY)SZ 1(BRF)GF2(BR) (658-7038)EACH36$1.00$47.00$27.00$56.00$27.00$100.00$36.00
46Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF3,470$0.30$1.10$0.50$1.30$0.50$1.00$0.70
47Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF10,751$0.41$0.58$0.50$0.70$0.50$1.00$0.70
48Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH8$0.40$5.25$2.00$1.50$3.11$6.00$2.66
49Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH3,156$1.00$0.75$0.85$1.50$1.46$6.00$1.13
50Reflectorized pavement marking type I (Y)24"(solid)(090MIL) (666-7122)LF24$8.00$15.00$16.00$16.00$16.00$20.00$21.28
51Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF32,382$1.20$0.90$0.70$1.00$0.70$0.75$0.93
52Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF3,470$2.01$1.40$0.85$1.50$0.85$0.75$1.13
53Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF10,751$1.21$0.80$0.70$0.80$0.70$0.75$0.90
54Reflectorized pavement marker type II-A-A (672-7004)EACH309$6.00$7.00$6.00$7.00$6.00$6.00$8.00
55CNC crack repair (flood)(gravity) (780-7005)SF77$5.00$108.00$150.00$175.00$150.00$100.00$199.00
TxDOT contract A00196618: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy