TxDOT contract A00213106 bid tabulation

THERMOPLASTIC PAVEMENT MARKINGS, US0183 (DISTRICT-WIDE to DISTRICT-WIDE). Let by Texas DOT on February 7, 2025, Brown, Brownwood District. 7 bids received; low bid $2,694,773 by D. I. J. Construction, Inc., -9.3% against the engineer's estimate of $2,970,423.

Owner
Texas DOT
Letting
07 FEB 2025
Pay items
60
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1D. I. J. Construction, Inc.$2,694,773Low-9.0%
2Striping Technology, L.P.$2,784,325+3.0%-6.0%
3Flat Line, Inc.$3,015,475+12%+2.0%
4TRP Infrastructure Services, LLC$3,158,073+17%+6.0%
5L&L Company$3,309,320+23%+11%
6Stripe-A-Zone, LLC$3,392,855+26%+14%
7Interstate Barricades & Markings, Inc.$3,644,225+35%+23%
TxDOT contract A00213106: bids by rank

Engineer's estimate: $2,970,423.

Bid tabulation

LinePay itemUnitQuantityEstimate1. D. I. J. Construction, Inc.2. Striping Technology, L.P.3. Flat Line, Inc.4. TRP Infrastructure Services, LLC5. L&L Company6. Stripe-A-Zone, LLC
1Mobilization (callout) (500-7002)EACH5$600.00$5,900.00$3,000.00$15,000$10,000$2,000.00$7,500.00
2TMA (mobile operation) (505-7003)DAY200$325.00$655.00$100.00$1.00$100.00$1.00$250.00
3Reflectorized pavement marking type I (W)4"(DOT)(060MIL) (666-7001)LF500$0.75$2.00$1.00$3.00$1.50$1.00$0.50
4Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003)LF100$2.42$2.00$1.00$10.00$1.70$1.00$0.95
5Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF100$2.34$2.00$1.00$10.00$1.85$1.00$1.25
6Reflectorized pavement marking type I (W)8"(lane drop)(060MIL) (666-7019)LF400$1.57$2.00$1.00$4.00$1.35$2.00$1.50
7Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021)LF100$1.71$2.00$1.00$8.00$1.55$2.00$2.00
8Reflectorized pavement marking type I (W)8"(solid)(060MIL) (666-7022)LF30,000$0.88$0.90$0.50$0.75$0.70$0.75$0.89
9Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF500$2.12$1.25$0.85$2.00$1.00$0.90$1.35
10Reflectorized pavement marking type I (W)12"(lane drop)(060MIL) (666-7025)LF100$2.25$3.00$3.00$5.00$2.05$4.00$4.75
11Reflectorized pavement marking type I (W)12"(solid)(060MIL) (666-7028)LF200$3.56$3.00$3.00$4.00$4.50$4.00$6.50
12Reflectorized pavement marking type I (Y)6"(DOT)(060MIL) (666-7109)LF100$2.08$1.00$1.00$5.00$1.80$0.90$1.50
13RE PV marking type I(black)4"(shadow)(100MIL) (666-7135)LF250$1.50$3.00$2.50$5.00$0.51$1.00$6.00
14RE PV marking type I(black)6"(shadow)(100MIL) (666-7138)LF250$5.72$3.25$2.50$5.00$0.68$1.20$8.00
15Reflectorized pavement marking type II (W) 4" (broken) (666-7168)LF2,500$0.21$0.50$1.00$0.65$0.20$0.30$0.95
16Reflectorized pavement marking type II (W) 4" (solid) (666-7171)LF5,000$1.34$0.50$1.00$0.65$0.20$0.30$0.95
17Reflectorized pavement marking type II (W) 8" (lane drop) (666-7178)LF100$3.75$2.00$1.00$1.25$0.80$0.45$1.85
18Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF1,500$1.21$2.00$1.00$1.00$0.43$0.45$1.25
19Reflectorized pavement marking type II (Y) 4" (solid) (666-7210)LF1,000$1.61$0.50$1.00$1.00$0.20$0.30$0.95
20Reflectorized profile pavement marking type I(W)4"(solid)(100MIL) (666-7264)LF200,000$0.65$0.70$0.50$0.59$0.73$0.55$0.69
21Reflectorized profile pavement marking type I(Y)4"(solid)(100MIL) (666-7268)LF200,000$0.65$0.71$0.50$0.59$0.73$0.55$0.69
22Reflectorized profile pavement marking type I(Y)4"(broken)(100MIL) (666-7272)LF10,000$2.46$0.71$0.80$0.60$0.86$0.55$0.72
23Reflectorized pavement marking type I (W)4"(broken)(060MIL) (666-7400)LF60,000$0.75$0.24$0.35$0.35$0.44$0.35$0.42
24Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402)LF1,000$2.76$0.38$0.50$0.50$0.47$0.38$0.60
25Reflectorized pavement marking type I (W)4"(solid)(060MIL) (666-7403)LF1,300,000$0.25$0.18$0.30$0.32$0.37$0.35$0.36
26Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405)LF10,000$3.64$0.38$0.50$0.55$0.41$0.38$0.50
27Reflectorized pavement marking type I (W)6"(broken)(060MIL) (666-7406)LF100,000$0.47$0.39$0.50$0.45$0.47$0.50$0.50
28Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF10,000$2.11$0.55$0.60$0.75$0.64$0.52$0.60
29Reflectorized pavement marking type I (W)6"(solid)(060MIL) (666-7409)LF1,300,000$0.40$0.37$0.38$0.37$0.41$0.50$0.45
30Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF10,000$1.86$0.55$0.50$0.85$0.57$0.52$0.60
31Reflectorized pavement marking type I (Y)4"(broken)(060MIL) (666-7412)LF175,000$0.45$0.23$0.35$0.37$0.36$0.35$0.41
32Reflectorized pavement marking type I (Y)4"(broken)(100MIL) (666-7414)LF1,000$2.13$0.38$0.50$1.00$0.47$0.38$0.60
33Reflectorized pavement marking type I (Y)4"(solid)(060MIL) (666-7415)LF2,000,000$0.20$0.22$0.30$0.32$0.30$0.35$0.36
34Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417)LF10,000$2.23$0.38$0.55$0.50$0.41$0.38$0.50
35Reflectorized pavement marking type I (Y)6"(broken)(060MIL) (666-7418)LF100,000$0.50$0.39$0.50$0.39$0.47$0.50$0.50
36Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF10,000$1.81$0.55$0.60$0.70$0.64$0.52$0.60
37Reflectorized pavement marking type I (Y)6"(solid)(060MIL) (666-7421)LF1,500,000$0.40$0.38$0.38$0.37$0.41$0.50$0.45
38Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF10,000$1.69$0.55$0.50$0.75$0.60$0.52$0.60
39PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF5,500$6.67$6.00$5.00$7.00$5.50$5.00$6.95
40Prefabricated PM type B (W)(4")(broken)contrast (668-7007)LF500$12.00$20.00$10.00$7.00$5.65$1.00$15.35
41Prefabricated PM type C (W)(24")(solid) (668-7089)LF10,000$18.86$14.25$11.70$17.00$15.00$13.00$11.95
42Prefabricated PM type C (W)(arrow) (668-7091)EACH100$274.65$225.00$200.00$250.00$275.00$300.00$275.00
43Prefabricated PM type C (W)(double arrow) (668-7093)EACH5$414.27$435.00$250.00$250.00$445.00$500.00$400.00
44Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH25$555.62$780.00$300.00$550.00$558.00$500.00$500.00
45Prefabricated PM type C (W)(word) (668-7103)EACH100$351.10$335.00$225.00$275.00$360.00$300.00$350.00
46Prefabricated PM type C (W)(RR crossing) (668-7108)EACH15$671.28$725.00$555.00$450.00$964.00$600.00$550.00
47Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH100$54.36$40.00$45.00$30.00$75.00$30.00$50.00
48Prefabricated PM type C (Y)(24")(solid) (668-7127)LF1,500$15.28$12.00$11.70$20.00$15.50$13.00$15.25
49Reflectorized pavement marker type I-C (672-7002)EACH500$7.53$6.50$5.00$5.00$4.10$5.00$6.85
50Reflectorized pavement marker type II-A-A (672-7004)EACH500$9.47$6.50$5.00$5.00$4.75$5.00$6.85
51Reflectorized pavement marker type II-C-R (672-7006)EACH500$7.86$6.50$5.00$5.00$4.75$5.00$6.85
52Eliminating existing PM & markers (4") (677-7001)LF1,000$1.77$2.50$1.00$10.00$1.25$0.40$2.00
53Eliminating existing PM & markers (8") (677-7004)LF250$2.52$5.00$1.00$10.00$2.00$1.00$3.00
54Eliminating existing PM & markers (12") (677-7006)LF100$3.50$5.50$1.00$15.00$2.10$2.00$4.00
55Eliminating existing PM & markers (24") (677-7008)LF500$7.55$7.00$1.00$15.00$3.45$3.00$5.00
56Eliminating existing PM & markers (arrow) (677-7009)EACH5$118.99$100.00$50.00$200.00$50.00$100.00$100.00
57Eliminating existing PM & markers (double arrow) (677-7010)EACH5$129.68$125.00$50.00$200.00$70.00$150.00$150.00
58Eliminating existing PM & markers (word) (677-7015)EACH5$118.74$125.00$50.00$200.00$58.00$150.00$100.00
59Eliminating existing PM & markers (RR crossing) (677-7019)EACH5$300.73$330.00$250.00$250.00$216.00$200.00$300.00
60Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH5$31.00$25.00$25.00$65.00$42.00$20.00$20.00
TxDOT contract A00213106: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy