Reflectorized pavement marking type I (W)8"(solid)(060MIL), TxDOT 666-7022

Low bidders on TxDOT contracts carried a median of $0.61 per LF for this item, over the 24 months to 19 NOV 2026, across 49 low bids. Half of all 227 bids fell between $0.60 and $1.00.

Owner
Texas DOT
Item
666-7022
Unit
LF
Data through
19 NOV 2026

TxDOT prints this item as “REFL PAV MRK TY I (W)8"(SLD)(060MIL)”.

TxDOT has bid this work under more than one code: 6666034007 on lettings from 04 MAR 2020 to 02 MAY 2024 (184 bids); 666-7022 on lettings from 06 NOV 2024 to 03 NOV 2026 (241 bids). They are combined here into one trend.

$0.61Low bidder's median, per LF
$0.71Median of all bids, per LF
49Contracts in the window
$0.75Engineer's estimate, median per LF

By year of letting

Reflectorized pavement marking type I (W)8"(solid)(060MIL), TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202088$0.5045$0.55
20211616$0.4975$0.60
202255$0.6013$0.72
202388$0.7533$0.72
202488$0.6936$0.80
20252121$0.60111$0.75
20262727$0.68112$0.70

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Austin District8$0.5650$0.68
San Antonio District10$1.0536$1.23
Dallas District7$0.7031$0.75
Paris District3$0.6519$0.57
Fort Worth District4$0.6515$0.80
Wichita Falls District3$0.6015$0.60
Reflectorized pavement marking type I (W)8"(solid)(060MIL), TxDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Quantity (LF)Low bidsLow-bid median
250 to 2,05512$1.00
3,088 to 15,00012$0.62
15,000 to 30,41612$0.60
34,324 to 112,00013$0.57
Reflectorized pavement marking type I (W)8"(solid)(060MIL), TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

Reflectorized pavement marking type I (W)8"(solid)(060MIL), TxDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
03 NOV 2026A00197271Austin District21,645$0.50$0.53$0.584TRP Infrastructure Services, LLCTxDOT
03 NOV 2026A00220202Wichita Falls District66,784$0.60$0.60n/a6Breedon Investments USA Inc.TxDOT
03 NOV 2026A00196926Paris District85,178$0.68$0.61$0.654Striping Technology, L.P.TxDOT
06 OCT 2026A00219449Brownwood District30,416$0.48$0.67$0.837Double A Contracting, L.P.TxDOT
06 OCT 2026A00219476Tyler District12,000$0.60$0.80$0.752Striping Technology, L.P.TxDOT
08 SEP 2026A00220768Houston District1,000$1.00$1.00$0.501TRP Infrastructure Services, LLCTxDOT
05 AUG 2026A00196824Bryan District1,427$1.00$0.95n/a6Big Creek Construction, LTD.TxDOT
05 AUG 2026A00222959Corpus Christi District60,000$0.58$0.58$0.503TRP Infrastructure Services, LLCTxDOT
08 JUL 2026A00219981Dallas District4,505$0.75$0.71$0.552Stripe-A-Zone, LLCTxDOT
02 JUN 2026A00221074Wichita Falls District25,000$0.61$0.63$1.502TRP Infrastructure Services, LLCTxDOT
02 JUN 2026A00196419San Antonio District3,934$2.00$1.93$1.005Taylor Bridge LLCTxDOT
02 JUN 2026A00196423San Antonio District20,000$0.60$0.70$0.903Interstate Barricades & Markings, Inc.TxDOT
13 MAY 2026A00218146Dallas District260$1.00$0.80$0.572D. I. J. Construction, Inc.TxDOT
07 MAY 2026A00206590Fort Worth District500$0.80$1.00$0.593TRP Infrastructure Services, LLCTxDOT
06 MAY 2026A00196412San Antonio District250$1.55$1.84$1.003E-Z Bel Construction, LLCTxDOT
Latest TxDOT contracts carrying Reflectorized pavement marking type I (W)8"(solid)(060MIL)

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the TxDOT letting of 19 NOV 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy