TxDOT contract A00220202 bid tabulation

Seal Coat, US 82 (St Jo E CL to Cooke County Line). Let by Texas DOT on November 3, 2026, Montague, Wichita Falls District. 6 bids received; low bid $12,173,490 by Breedon Investments USA Inc., -9.5% against the engineer's estimate of $13,456,738.

Owner
Texas DOT
Letting
03 NOV 2026
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Breedon Investments USA Inc.$12,173,490Low-10%
2Ronald R. Wagner & Co., LP$12,389,613+2.0%-8.0%
3Northeastern Pavers, LLC$12,704,850+4.0%-6.0%
4Lipham Asphalt and Paving Company, LLC$12,946,215+6.0%-4.0%
5CK Newberry, LLC$14,559,655+20%+8.0%
6Clark Construction of Texas, Inc.$15,188,072+25%+13%
TxDOT contract A00220202: bids by rank

Engineer's estimate: $13,456,738.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Breedon Investments USA Inc.2. Ronald R. Wagner & Co., LP3. Northeastern Pavers, LLC4. Lipham Asphalt and Paving Company, LLC5. CK Newberry, LLC6. Clark Construction of Texas, Inc.
1Asphalt (AC-20-5TR) (316-7007)GAL1,539,569$2.95$3.10$2.64$2.72$2.75$2.95$3.24
2Aggregate (type-PB, GR-5)(sac-B) (316-7214)CY240$90.00$97.57$125.00$85.00$250.00$115.66
3Aggregate (type-PB GR-4 mod) (316-7276)CY31,846$94.00$90.00$95.93$100.00$85.00$135.00$114.14
4Mobilization (500-7001)LS1$937,400$287,000$981,509$1,300,000$1,250,000$1,400,000$1,944,483
5Barricades, signs and traffic handling (502-7004)EACH31$3,500.00$6,500.00$0.01$0.01$10,000$10,000$9,201.25
6TMA (stationary) (505-7001)DAY140$250.00$10.00$0.01$0.01$100.00$1.00$100.00
7TMA (mobile operation) (505-7003)DAY158$300.00$100.00$0.01$0.01$100.00$1.00$100.00
8Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH8,080$0.10$0.60$0.01$0.01$1.00$0.01$1.00
9Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH127,117$0.01$0.01$0.01$1.00$0.01$1.00
10Reflectorized pavement marking type I (W)6"(DOT)(060MIL) (666-7007)LF6,738$0.30$0.50$0.30$1.25$0.30$0.30
11Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF473$0.50$0.80$0.50$1.50$0.75$0.50
12Reflectorized pavement marking type I (W)8"(DOT)(060MIL) (666-7016)LF6,474$0.60$0.80$0.60$2.00$0.75$0.60
13Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF648$0.70$0.80$0.70$2.00$0.95$0.70
14Reflectorized pavement marking type I (W)8"(solid)(060MIL) (666-7022)LF66,784$0.60$0.80$0.60$0.78$0.60$0.60
15Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF5,943$0.60$0.70$0.80$0.70$0.88$0.75$0.70
16Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF14,973$1.00$5.00$1.00$3.00$2.10$1.00
17Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF8,575$6.00$7.00$6.00$5.50$6.65$6.00
18Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH464$40.00$20.00$35.00$20.00$22.75$59.00$20.00
19Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF1,125$5.00$5.00$5.00$3.20$3.75$5.00
20Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF243$6.00$7.00$6.00$6.10$6.80$6.00
21Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF1,240,532$0.67$0.67$0.67$0.62$0.60$0.70
22Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF610,677$0.67$0.67$0.67$0.62$0.60$0.70
23Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF141,678$0.67$0.67$0.67$0.75$0.60$0.70
24Pavement sler 6" (666-7347)LF239,245$0.12$0.15$0.12$0.20$0.30$0.12
25Reflectorized pavement marking type I (W)6"(broken)(060MIL) (666-7406)LF165,504$0.29$0.42$0.29$0.40$0.30$0.30
26Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF33,236$0.49$0.62$0.49$0.50$0.50$0.50
27Reflectorized pavement marking type I (W)6"(solid)(060MIL) (666-7409)LF777,802$0.29$0.42$0.29$0.38$0.30$0.30
28Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF78,150$0.49$0.62$0.49$0.48$0.40$0.50
29Reflectorized pavement marking type I (Y)6"(broken)(060MIL) (666-7418)LF34,321$0.29$0.42$0.29$0.40$0.30$0.30
30Reflectorized pavement marking type I (Y)6"(solid)(060MIL) (666-7421)LF796,427$0.29$0.42$0.29$0.38$0.30$0.30
31Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF95,914$0.49$0.62$0.49$0.48$0.40$0.50
32Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424)LF1,067$0.49$1.00$0.49$5.00$4.50$1.00
33Reflectorized pavement marking type I (W)6"(broken)(125MIL) (666-7518)LF27,080$0.70$0.59$0.64$0.59$0.65$0.60$0.62
34Reflectorized pavement marking type I (W)6"(solid)(125MIL) (666-7519)LF805,186$0.66$0.59$0.64$0.59$0.65$0.60$0.62
35Reflectorized pavement marking type I (Y)6"(broken)(125MIL) (666-7522)LF131,326$0.59$0.64$0.59$0.65$0.60$0.62
36Reflectorized pavement marking type I (Y)6"(solid)(125MIL) (666-7523)LF723,452$0.66$0.59$0.64$0.59$0.65$0.60$0.62
37PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF70,836$4.00$3.75$4.00$4.00$3.35$4.00
38Prefabricated PM type B (W)(LN RDCT arrow) (668-7029)EACH2$600.00$400.00$600.00$500.00$600.00$700.00
39Prefabricated PM type B (W)(RR crossing) (668-7035)EACH3$1,500.00$600.00$1,500.00$625.00$1,200.00$1,500.00
40Prefabricated PM type B (W)(36")(yld tri) (668-7038)EACH378$25.00$30.00$25.00$22.50$70.00$25.00
41Prefabricated PM type C (W)(arrow) (668-7091)EACH126$190.00$220.00$190.00$208.60$200.00$190.00
42Prefabricated PM type C (W)(double arrow) (668-7093)EACH36$225.00$250.00$225.00$270.50$380.00$225.00
43Prefabricated PM type C (W)(word) (668-7103)EACH130$200.00$250.00$200.00$232.40$285.00$200.00
44Prefabricated PM type C (W)(RR crossing) (668-7108)EACH4$650.00$500.00$650.00$625.00$825.00$650.00
45Reflectorized pavement marker type II-A-A (672-7004)EACH30,327$3.25$4.00$4.00$4.00$3.60$3.10$4.00
46Reflectorized pavement marker type II-C-R (672-7006)EACH19,023$3.25$4.00$0.04$4.00$3.60$3.10$4.00
47Eliminating existing PM & markers (4") (677-7001)LF2,053,221$0.15$0.10$0.15$0.14$0.15$0.15
48Eliminating existing PM & markers (24") (677-7008)LF1,123$2.00$1.00$2.00$2.50$2.85$2.00
49Eliminating existing PM & markers (arrow) (677-7009)EACH120$50.00$50.00$50.00$75.00$40.00$50.00
50Eliminating existing PM & markers (double arrow) (677-7010)EACH36$75.00$50.00$75.00$150.00$60.00$75.00
51Eliminating existing PM & markers (word) (677-7015)EACH122$50.00$50.00$50.00$125.00$50.00$50.00
52Eliminating existing PM & markers (RR crossing) (677-7019)EACH7$200.00$80.00$200.00$250.00$200.00$200.00
53Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH360$10.00$10.00$10.00$10.00$35.00$10.00
54Eliminating existing PM & markers (rumble strip) (677-7030)LF30,965$0.50$0.73$0.50$0.75$1.00$0.50
TxDOT contract A00220202: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy