| 1 | Preparing row (100-7002) | STA | 1.50 | $25,600 | $80,000 | $80,000 | $375,000 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 984 | $45.00 | $80.00 | $25.00 | $94.96 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 75 | $61.50 | $200.00 | $25.00 | $102.18 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 181 | $54.43 | $150.00 | $25.00 | $102.71 |
| 5 | Removing concrete (curb & gutter) (104-7017) | LF | 300 | $33.00 | $40.00 | $20.00 | $61.85 |
| 6 | Excavation (roadway) (110-7001) | CY | 935 | $43.30 | $100.00 | $30.00 | $93.70 |
| 7 | Excavation (channel) (110-7002) | CY | 1,443 | $40.00 | $80.00 | $25.00 | $93.70 |
| 8 | Embankment (final)(OC)(type A) (132-7001) | CY | 2 | $70.20 | $1,000.00 | $150.00 | $148.51 |
| 9 | Proof rolling (216-7001) | HR | 1 | $170.00 | $20.00 | $150.00 | $742.55 |
| 10 | Cement (275-7001) | TON | 37 | $312.50 | $450.00 | $500.00 | $424.32 |
| 11 | Cement TRT (subgrade)(12") (275-7015) | SY | 914 | $10.75 | $95.00 | $45.00 | $14.85 |
| 12 | D-GR HMA type D PG 70-28 (exempt) (341-7084) | TON | 99 | $133.00 | $300.00 | $400.00 | $424.32 |
| 13 | Concrete pavement (CRCP) (13") (360-7007) | SY | 831 | $120.00 | $550.00 | $250.00 | $155.81 |
| 14 | Cem stabil BKFL (400-7010) | CY | 457 | $275.00 | $300.00 | $450.00 | $608.54 |
| 15 | Temporary special shoring (403-7001) | SF | 4,970 | $55.00 | $80.00 | $40.00 | $67.01 |
| 16 | Drilled shaft (30 in) (416-7005) | LF | 352 | $243.00 | $700.00 | $800.00 | $2,815.84 |
| 17 | Class S concrete (culvert) (420-7147) | CY | 369 | $3,000.00 | $1,070.00 | $4,300.00 | $2,049.97 |
| 18 | Bridge sidewalk (422-7012) | SF | 390 | $55.00 | $80.00 | $20.00 | $38.00 |
| 19 | Retaining wall (spread footing) (423-7015) | SF | 238 | $125.00 | $150.00 | $165.00 | $129.22 |
| 20 | Riprap (concrete)(5 in) (432-7002) | CY | 197 | $800.00 | $800.00 | $800.00 | $1,074.03 |
| 21 | Riprap (mow strip)(4 in) (432-7013) | CY | 17 | $857.00 | $800.00 | $800.00 | $1,520.47 |
| 22 | Rail (type C411) (450-7038) | LF | 100 | $285.00 | $800.00 | $450.00 | $408.16 |
| 23 | Rail (handrail)(type B) (450-7059) | LF | 55 | $217.00 | $800.00 | $200.00 | $308.59 |
| 24 | Type A joint (454-7001) | LF | 154 | $89.50 | $150.00 | $50.00 | $56.58 |
| 25 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 1 | $82,000 | $80,000 | $65,000 | $114,548 |
| 26 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $150,000 | $530,000 | $250,000 | $162,655 |
| 27 | Mobilization (500-7001) | LS | 1 | $207,464 | $360,000 | $400,000 | $507,525 |
| 28 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $9,000.00 | $18,000 | $9,000.00 | $9,054.84 |
| 29 | Portable changeable message sign (503-7002) | EACH | 2 | $15,900 | $40,000 | $18,000 | $40,310 |
| 30 | TMA (stationary) (505-7001) | DAY | 30 | $350.00 | $300.00 | $350.00 | $506.82 |
| 31 | TMA (mobile operation) (505-7002) | HR | 50 | $97.00 | $50.00 | $65.00 | $353.60 |
| 32 | Rock filter dams (install) (type 4) (506-7004) | LF | 22 | $58.65 | $1.00 | $95.00 | $282.88 |
| 33 | Rock filter dams (remove) (506-7011) | LF | 22 | $22.00 | $1.00 | $20.00 | $70.72 |
| 34 | Temporary sediment control fence (install) (506-7039) | LF | 312 | $5.40 | $1.00 | $10.00 | $8.49 |
| 35 | Temporary sediment control fence (remove) (506-7041) | LF | 312 | $1.90 | $1.00 | $2.00 | $2.83 |
| 36 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 40 | $8.90 | $1.00 | $20.00 | $141.44 |
| 37 | Biodegradable erosion control logs (remove) (506-7046) | LF | 40 | $3.75 | $1.00 | $2.00 | $28.29 |
| 38 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 580 | $94.00 | $100.00 | $125.00 | $77.79 |
| 39 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $109.00 | $100.00 | $125.00 | $77.79 |
| 40 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 660 | $35.00 | $50.00 | $20.00 | $41.02 |
| 41 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 80 | $30.00 | $50.00 | $20.00 | $41.02 |
| 42 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 580 | $35.00 | $40.00 | $15.00 | $77.79 |
| 43 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $30.00 | $40.00 | $15.00 | $77.79 |
| 44 | Colored textured concrete (4") (527-7001) | SY | 15 | $163.82 | $80.00 | $250.00 | $242.80 |
| 45 | Concrete curb & gutter (type II) (529-7009) | LF | 249 | $60.00 | $90.00 | $65.00 | $86.24 |
| 46 | Concrete curb (type F1) (529-7017) | LF | 55 | $100.00 | $90.00 | $250.00 | $249.29 |
| 47 | Driveways (concrete) (530-7006) | SY | 63 | $162.00 | $90.00 | $150.00 | $172.80 |
| 48 | Concrete sidewalks (4") (531-7001) | SY | 125 | $175.00 | $90.00 | $130.00 | $161.20 |
| 49 | Metal W-beam guard fence (timber post) (540-7001) | LF | 381 | $35.00 | $45.00 | $50.00 | $84.86 |
| 50 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 225 | $21.39 | $30.00 | $35.00 | $28.64 |
| 51 | Ground box type A (122311) (624-7001) | EACH | 4 | $1,100.00 | $10,000 | $500.00 | $1,859.04 |
| 52 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $871.00 | $2,000.00 | $1,500.00 | $1,606.14 |
| 53 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $922.00 | $2,000.00 | $1,500.00 | $1,842.57 |
| 54 | Work zone pavement marking non-removing (W)4"(broken) (662-7001) | LF | 800 | $0.40 | $1.20 | $1.20 | $1.56 |
| 55 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 2,897 | $0.40 | $1.20 | $1.20 | $1.56 |
| 56 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 15,794 | $0.50 | $1.20 | $1.20 | $1.56 |
| 57 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 160 | $1.95 | $2.50 | $3.00 | $3.25 |
| 58 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 494 | $1.80 | $2.50 | $3.00 | $2.97 |
| 59 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 1,220 | $2.20 | $2.50 | $3.00 | $2.97 |
| 60 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 3,654 | $1.35 | $2.50 | $3.00 | $2.97 |
| 61 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 1,060 | $1.70 | $2.50 | $3.00 | $2.97 |
| 62 | Pavement sler 6" (666-7347) | LF | 6,428 | $0.50 | $1.00 | $1.20 | $1.41 |
| 63 | Pavement sler 8" (666-7348) | LF | 160 | $0.50 | $2.00 | $2.50 | $2.83 |
| 64 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 184 | $2.50 | $20.00 | $22.00 | $24.75 |
| 65 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 4 | $352.00 | $300.00 | $400.00 | $424.32 |
| 66 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $435.00 | $400.00 | $500.00 | $565.76 |
| 67 | Reflectorized pavement marker type I-C (672-7002) | EACH | 57 | $8.10 | $10.00 | $12.00 | $14.14 |
| 68 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 88 | $11.00 | $10.00 | $12.00 | $14.14 |
| 69 | Eliminating existing PM & markers (4") (677-7001) | LF | 27,288 | $1.25 | $1.00 | $1.20 | $1.20 |
| 70 | Eliminating existing PM & markers (8") (677-7004) | LF | 404 | $2.20 | $1.00 | $1.20 | $1.41 |
| 71 | Eliminating existing PM & markers (24") (677-7008) | LF | 70 | $6.00 | $5.00 | $6.00 | $7.07 |
| 72 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 4 | $100.00 | $125.00 | $150.00 | $176.80 |
| 73 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $109.00 | $200.00 | $230.00 | $282.88 |
| 74 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,428 | $0.66 | $1.00 | $1.20 | $1.41 |
| 75 | Pavement surface preparation for marking (8") (678-7004) | LF | 160 | $0.56 | $1.00 | $1.20 | $1.41 |
| 76 | Pavement surface preparation for marking (24") (678-7008) | LF | 184 | $22.00 | $5.00 | $6.00 | $7.07 |
| 77 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 4 | $80.00 | $100.00 | $120.00 | $141.44 |
| 78 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $98.00 | $150.00 | $200.00 | $212.16 |
| 79 | Manhole (san SWR)(4 FT diameter) (7029-7001) | EACH | 1 | $18,000 | $15,000 | $25,000 | $35,360 |
| 80 | San SWR (television inspection) (7029-7002) | LF | 125 | $40.00 | $160.00 | $150.00 | $282.88 |
| 81 | Bypass pumping (7029-7003) | LS | 1 | $18,500 | $20,000 | $20,000 | $134,367 |
| 82 | Pipe burst san SWR (8" HDPE) (7029-7004) | LF | 125 | $148.00 | $400.00 | $800.00 | $1,414.39 |