TxDOT contract A00140276 bid tabulation
Surfacing/Roadway Restoration, FM 3155 (Richmond State School to UA 90). Let by Texas DOT on February 7, 2025, Fort Bend, Houston District. 7 bids received; low bid $585,949 by Durwood Greene Construction Co., -6.8% against the engineer's estimate of $628,502.
- Owner
- Texas DOT
- Letting
- 07 FEB 2025
- Pay items
- 48
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Durwood Greene Construction Co. | $585,949 | Low | -7.0% |
| 2 | Elite Kings Construction, LLC | $589,897 | +1.0% | -6.0% |
| 3 | Vulcan Materials Asphalt and Construction, LLC | $619,148 | +6.0% | -1.0% |
| 4 | Hayden Paving, Inc. | $652,940 | +11% | +4.0% |
| 5 | Cornerstone Paving and Construction, L.L.C. | $701,285 | +20% | +12% |
| 6 | Texas Materials Group, Inc. | $726,321 | +24% | +16% |
| 7 | MB Western Industrial Contracting Co. | $738,218 | +26% | +17% |
Engineer's estimate: $628,502.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Durwood Greene Construction Co. | 2. Elite Kings Construction, LLC | 3. Vulcan Materials Asphalt and Construction, LLC | 4. Hayden Paving, Inc. | 5. Cornerstone Paving and Construction, L.L.C. | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 52 | $8.00 | $30.00 | $16.00 | $100.00 | $55.00 | $100.00 | $71.25 |
| 2 | Backfill (type A or B) (134-7004) | STA | 53.66 | $290.00 | $400.00 | $16.00 | $374.00 | $125.00 | $950.00 | $906.20 |
| 3 | Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245) | CY | 150 | $135.00 | $190.00 | $150.00 | $400.00 | $225.00 | $234.00 | $258.15 |
| 4 | Asphalt (multi option) (316-7263) | GAL | 6,165 | $2.50 | $4.25 | $4.50 | $3.45 | $3.75 | $4.30 | $3.80 |
| 5 | D-GR HMA type D sac-A PG70-22 (341-7049) | TON | 1,648.26 | $180.00 | $150.00 | $125.00 | $147.25 | $200.00 | $159.50 | $163.40 |
| 6 | Tack coat (341-7082) | GAL | 161 | $3.39 | $3.75 | $20.00 | $3.40 | $14.00 | $4.00 | $9.00 |
| 7 | Flexible pavement structure repair(6") (351-7005) | SY | 500 | $65.00 | $75.00 | $80.00 | $57.00 | $55.00 | $71.00 | $99.90 |
| 8 | Planing asphalt concrete pavement(2") (354-7051) | SY | 19,259 | $2.50 | $2.00 | $4.50 | $0.95 | $2.25 | $4.00 | $1.95 |
| 9 | Riprap (mow strip)(4 in) (432-7013) | CY | 24 | $560.00 | $1,100.00 | $500.00 | $1,200.00 | $225.00 | $1,200.00 | $1,440.01 |
| 10 | Mobilization (500-7001) | LS | 1 | $52,000 | $36,000 | $30,000 | $61,000 | $60,000 | $60,000 | $73,550 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $3,000.00 | $1,500.00 | $7,000.00 | $8,100.00 | $1,500.00 | $4,000.00 | $1,102.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 13 | $190.00 | $350.00 | $280.00 | $257.00 | $300.00 | $125.00 | $276.95 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 32 | $675.00 | $150.00 | $360.00 | $257.00 | $25.00 | $125.00 | $595.98 |
| 14 | Metal W-beam guard fence (timber post) (540-7001) | LF | 175 | $25.00 | $30.00 | $44.00 | $26.00 | $26.50 | $26.00 | $32.89 |
| 15 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,565.00 | $1,600.00 | $1,600.00 | $1,423.00 | $1,500.00 | $1,423.00 | $1,817.44 |
| 16 | Remove metal beam guard fence (542-7001) | LF | 250 | $3.85 | $3.50 | $4.00 | $3.00 | $3.05 | $3.00 | $3.46 |
| 17 | Remove terminal anchor section (542-7002) | EACH | 4 | $317.00 | $175.00 | $240.00 | $150.00 | $155.00 | $150.00 | $576.97 |
| 18 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,100.00 | $3,600.00 | $2,800.00 | $3,083.00 | $3,100.00 | $3,083.00 | $3,634.87 |
| 19 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $260.00 | $250.00 | $1,600.00 | $200.00 | $225.00 | $200.00 | $288.48 |
| 20 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 10 | $245.00 | $275.00 | $160.00 | $238.00 | $245.00 | $238.00 | $490.42 |
| 21 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 2 | $475.00 | $350.00 | $520.00 | $295.00 | $300.00 | $295.00 | $951.99 |
| 22 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 32 | $755.00 | $570.00 | $760.00 | $526.00 | $544.00 | $526.00 | $617.35 |
| 23 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $655.00 | $750.00 | $600.00 | $682.00 | $685.00 | $682.00 | $807.75 |
| 24 | Install small roadside sign support and assembly TYS80(1)SA(T-2EXT) (644-7029) | EACH | 1 | $880.00 | $950.00 | $960.00 | $849.00 | $855.00 | $849.00 | $1,038.53 |
| 25 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $950.00 | $1,150.00 | $1,200.00 | $1,048.00 | $1,100.00 | $1,048.00 | $1,355.87 |
| 26 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $950.00 | $1,000.00 | $960.00 | $890.00 | $900.00 | $890.00 | $1,252.01 |
| 27 | Remove SM RD SN sup&AM (644-7073) | EACH | 39 | $102.00 | $90.00 | $320.00 | $80.00 | $85.00 | $80.00 | $109.62 |
| 28 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 11 | $95.00 | $220.00 | $76.00 | $203.00 | $225.00 | $203.00 | $98.08 |
| 29 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 21,068 | $0.40 | $0.30 | $0.48 | $0.40 | $0.50 | $0.40 | $0.31 |
| 30 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 210 | $0.61 | $0.60 | $0.96 | $0.85 | $0.90 | $0.85 | $0.63 |
| 31 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 326 | $3.00 | $7.00 | $7.20 | $5.00 | $6.00 | $5.00 | $5.77 |
| 32 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 2 | $88.00 | $125.00 | $120.00 | $75.00 | $80.00 | $75.00 | $132.70 |
| 33 | Work zone pavement marking non-removing (W)(double arrow) (662-7019) | EACH | 2 | $156.00 | $145.00 | $120.00 | $140.00 | $144.00 | $140.00 | $155.78 |
| 34 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 4 | $250.00 | $200.00 | $160.00 | $270.00 | $277.00 | $270.00 | $207.71 |
| 35 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 2 | $95.00 | $125.00 | $84.00 | $85.00 | $88.00 | $85.00 | $132.70 |
| 36 | Work zone pavement marking non-removing (Y)4"(broken) (662-7033) | LF | 860 | $0.30 | $0.30 | $0.40 | $0.50 | $0.55 | $0.50 | $0.31 |
| 37 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 15,028 | $0.40 | $0.30 | $0.32 | $0.40 | $0.44 | $0.40 | $0.31 |
| 38 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 105 | $1.27 | $3.25 | $1.60 | $2.00 | $2.20 | $2.00 | $3.63 |
| 39 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 163 | $7.18 | $11.00 | $9.60 | $11.00 | $11.10 | $11.00 | $11.54 |
| 40 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 1 | $151.00 | $315.00 | $216.00 | $185.00 | $186.00 | $185.00 | $340.41 |
| 41 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 1 | $270.00 | $350.00 | $320.00 | $300.00 | $303.00 | $300.00 | $386.57 |
| 42 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1 | $179.00 | $315.00 | $280.00 | $190.00 | $199.00 | $190.00 | $340.41 |
| 43 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 2 | $435.00 | $550.00 | $640.00 | $650.00 | $750.00 | $650.00 | $576.96 |
| 44 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 10,534 | $0.86 | $1.20 | $1.20 | $1.25 | $1.26 | $1.25 | $1.33 |
| 45 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 430 | $0.58 | $1.55 | $1.48 | $2.00 | $2.05 | $2.00 | $1.73 |
| 46 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 7,514 | $0.86 | $1.40 | $1.60 | $1.30 | $1.35 | $1.30 | $1.56 |
| 47 | Reflectorized pavement marker type I-C (672-7002) | EACH | 6 | $6.16 | $7.50 | $7.20 | $7.00 | $10.00 | $7.00 | $8.05 |
| 48 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 113 | $6.25 | $7.50 | $12.00 | $7.00 | $8.00 | $7.00 | $8.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 7, 2025. Compiled by Mirage Metrics.