By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2022 | 9 | 2 | 22% |
| 2023 | 7 | 2 | 29% |
| 2024 | 12 | 1 | 8% |
| 2025 | 30 | 5 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 32 | 7 | 22% |
| Beaumont District | 12 | 3 | 25% |
| Yoakum District | 6 | 0 | 0% |
| Bryan District | 5 | 0 | 0% |
| Lufkin District | 4 | 1 | 25% |
| Brownwood District | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 54 | 32 of 54 |
| Cornerstone Paving and Construction, L.L.C. | 27 | 18 of 27 |
| Durwood Greene Construction Co. | 26 | 16 of 26 |
| Forde Construction Company, Inc. | 12 | 2 of 12 |
| Knife River Corporation - South | 11 | 8 of 11 |
| Big Creek Construction, LTD. | 10 | 9 of 10 |
| James Construction Group, LLC | 8 | 2 of 8 |
| Hayden Paving, Inc. | 7 | 2 of 7 |
| Larry Young Paving, Inc. | 6 | 2 of 6 |
| Elite Kings Construction, LLC | 6 | 5 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 SEP 2025 | A00133187 | Houston District | Resurface Roadway, SH 36 (South of UPRR to South of CR 348) | 3 of 4 | $7,624,627 | +53% |
| 08 AUG 2025 | A00064662 | Lufkin District | Highway Improvement, FM 2076 (END OF PAVEMENT to FM 229) | 6 of 6 | $11,299,095 | +14% |
| 08 AUG 2025 | A00127561 | Bryan District | Widen Road - Add Lanes, SH 7 (SH 75 to HOUSTON COUNTY LINE) | 4 of 4 | $29,526,604 | +39% |
| 07 AUG 2025 | A00125659 | Yoakum District | Surfacing/Roadway Restoration, SH 159 (FAYETTE C/L to FM 109) | 6 of 6 | $18,692,731 | +48% |
| 05 JUN 2025 | A00129803 | Houston District | Surfacing/Roadway Restoration, SH 332 (FM 523 to End of Maintenance) | 3 of 5 | $2,247,344 | +7.0% |
| 04 JUN 2025 | A00209350 | Houston District | Surfacing/Roadway Restoration, IH 10 (SL 8 East to Monmouth Road) | 3 of 5 | $3,957,487 | +16% |
| 04 JUN 2025 | A00213018 | Bryan District | MILL AND INLAY, IH0045 (SH 21 to OSR) | 4 of 5 | $4,327,984 | +25% |
| 02 MAY 2025 | A00195577 | Yoakum District | Reconstruct Existing Roadway, SH 36 (SH 159 W to SH 159 E) | 5 of 5 | $7,360,906 | +20% |
| 02 MAY 2025 | A00188408 | Houston District | Surfacing/Roadway Restoration, FM 2432 (SH 75 to FM 1484) | 1 of 5 | $4,090,557 | Low, 8.0% under the second |
| 01 MAY 2025 | A00184102 | Beaumont District | Hazard Elimination & Safety, FM 2830 (1.2 MI SOUTH OF SH 146, SOUTH to 1.7 MI SOUTH OF SH 146) | 3 of 4 | $545,509 | +12% |
| 04 APR 2025 | A00195572 | Yoakum District | Resurface Roadway, SH 36 (FM 2187 to FM 1094) | 3 of 7 | $4,608,365 | +6.0% |
| 03 APR 2025 | A00188712 | Houston District | Surfacing/Roadway Restoration, FM 2004 (SH 288 to SH 332) | 4 of 6 | $2,362,253 | +8.0% |
| 03 APR 2025 | A00196020 | Houston District | Surfacing/Roadway Restoration, IH 610 (South Wayside Drive to Scott Street) | 3 of 3 | $9,498,504 | +1.0% |
| 03 APR 2025 | A00129807 | Houston District | Surfacing/Roadway Restoration, FM 524 (UP Railroad to FM 521) | 1 of 6 | $1,714,183 | Low, 2.0% under the second |
| 05 MAR 2025 | A00140284 | Houston District | Surfacing/Roadway Restoration, SH 6 (Harris C/L to N of UA 90) | 2 of 3 | $5,174,407 | 0.0% |
| 05 MAR 2025 | A00139797 | Houston District | ACP OVERLAY, SH0035 (N. of 10th St to CR 691) | 3 of 6 | $1,907,011 | +1.0% |
| 05 MAR 2025 | A00213021 | Bryan District | MILL AND INLAY, US0290 (RM 676 + 0.56 to RM 678 + 0.06) | 8 of 9 | $1,810,781 | +39% |
| 05 MAR 2025 | A00130696 | Houston District | Surfacing/Roadway Restoration, FS 149 (FM 1488 to FM 149) | 1 of 6 | $1,063,539 | Low, 3.0% under the second |
| 04 MAR 2025 | A00124556 | Yoakum District | Surfacing/Roadway Restoration, FM 1301 (FM 1728 to BRAZORIA C/L) | 5 of 6 | $9,607,385 | +35% |
| 04 MAR 2025 | A00130736 | Houston District | Surfacing/Roadway Restoration, SH 225 (IH 610 E to W of S Richey Road) | 5 of 5 | $32,772,954 | +49% |
| 04 MAR 2025 | A00129802 | Houston District | Surfacing/Roadway Restoration, BS 35C (SH 35 North to FM 1462) | 3 of 3 | $5,754,838 | +13% |
| 07 FEB 2025 | A00140276 | Houston District | Surfacing/Roadway Restoration, FM 3155 (Richmond State School to UA 90) | 3 of 7 | $619,148 | +6.0% |
| 07 FEB 2025 | A00130693 | Houston District | Surfacing/Roadway Restoration, SH 75 (SL 336N to SH 105) | 1 of 6 | $3,303,124 | Low, 9.0% under the second |
| 06 FEB 2025 | A00130307 | Houston District | Surfacing/Roadway Restoration, FM 1960 (FM 2100 to Liberty C/L) | 6 of 7 | $2,625,815 | +43% |
| 06 FEB 2025 | A00130689 | Houston District | Surfacing/Roadway Restoration, FM 1484 (FM 2432 to SH 105) | 2 of 6 | $8,800,196 | +5.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.