Vulcan Materials Asphalt and Construction, LLC submitted 60 bids on Texas DOT contracts in the data, from 01 JUL 2021 to 04 SEP 2025, and was the low bidder on 11 of them (18%). When it was not low, its total sat a median +13% above the low bid.

Owner
Texas DOT
Low bid volume
$66,133,545
Latest bid
04 SEP 2025
Data through
19 NOV 2026
60Bids
11Low bids
18Win rate, percent
+13%Median gap to the low bid when not low, 49 bids

By year

YearBidsLow bidsWin rate
20212150%
20229222%
20237229%
20241218%
202530517%
Vulcan Materials Asphalt and Construction, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District32722%
Beaumont District12325%
Yoakum District600%
Bryan District500%
Lufkin District4125%
Brownwood District100%
Vulcan Materials Asphalt and Construction, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type II-A-A672-7004EACH4819 (40%)$6.00$5.00
TMA (mobile operation)505-7003DAY4317 (40%)$258.00$291.17
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF3417 (50%)$1.18$1.10
Portable changeable message sign503-7001DAY3017 (57%)$81.84$100.00
Reflectorized pavement marker type I-C672-7002EACH3616 (44%)$6.00$5.00
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH4015 (38%)$557.15$710.00
Remove SM RD SN sup&AM644-7073EACH3715 (41%)$95.00$110.00
Install small roadside sign support and assembly type 10BWG(1)SA(T)644-7004EACH3112 (39%)$682.00$825.00
Work zone pavement marking non-removing (Y)6"(solid)662-7038LF3112 (39%)$0.35$0.40
Metal W-beam guard fence (timber post)540-7001LF3012 (40%)$25.94$27.00
Work zone pavement marking non-removing (W)6"(solid)662-7008LF3311 (33%)$0.35$0.39
Pavement surface preparation for marking (6")678-7002LF2011 (55%)$0.03$0.18
Vulcan Materials Asphalt and Construction, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Vulcan Materials Asphalt and Construction, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 SEP 2025A00133187Houston DistrictResurface Roadway, SH 36 (South of UPRR to South of CR 348)3 of 4$7,624,627+53%
08 AUG 2025A00064662Lufkin DistrictHighway Improvement, FM 2076 (END OF PAVEMENT to FM 229)6 of 6$11,299,095+14%
08 AUG 2025A00127561Bryan DistrictWiden Road - Add Lanes, SH 7 (SH 75 to HOUSTON COUNTY LINE)4 of 4$29,526,604+39%
07 AUG 2025A00125659Yoakum DistrictSurfacing/Roadway Restoration, SH 159 (FAYETTE C/L to FM 109)6 of 6$18,692,731+48%
05 JUN 2025A00129803Houston DistrictSurfacing/Roadway Restoration, SH 332 (FM 523 to End of Maintenance)3 of 5$2,247,344+7.0%
04 JUN 2025A00209350Houston DistrictSurfacing/Roadway Restoration, IH 10 (SL 8 East to Monmouth Road)3 of 5$3,957,487+16%
04 JUN 2025A00213018Bryan DistrictMILL AND INLAY, IH0045 (SH 21 to OSR)4 of 5$4,327,984+25%
02 MAY 2025A00195577Yoakum DistrictReconstruct Existing Roadway, SH 36 (SH 159 W to SH 159 E)5 of 5$7,360,906+20%
02 MAY 2025A00188408Houston DistrictSurfacing/Roadway Restoration, FM 2432 (SH 75 to FM 1484)1 of 5$4,090,557Low, 8.0% under the second
01 MAY 2025A00184102Beaumont DistrictHazard Elimination & Safety, FM 2830 (1.2 MI SOUTH OF SH 146, SOUTH to 1.7 MI SOUTH OF SH 146)3 of 4$545,509+12%
04 APR 2025A00195572Yoakum DistrictResurface Roadway, SH 36 (FM 2187 to FM 1094)3 of 7$4,608,365+6.0%
03 APR 2025A00188712Houston DistrictSurfacing/Roadway Restoration, FM 2004 (SH 288 to SH 332)4 of 6$2,362,253+8.0%
03 APR 2025A00196020Houston DistrictSurfacing/Roadway Restoration, IH 610 (South Wayside Drive to Scott Street)3 of 3$9,498,504+1.0%
03 APR 2025A00129807Houston DistrictSurfacing/Roadway Restoration, FM 524 (UP Railroad to FM 521)1 of 6$1,714,183Low, 2.0% under the second
05 MAR 2025A00140284Houston DistrictSurfacing/Roadway Restoration, SH 6 (Harris C/L to N of UA 90)2 of 3$5,174,4070.0%
05 MAR 2025A00139797Houston DistrictACP OVERLAY, SH0035 (N. of 10th St to CR 691)3 of 6$1,907,011+1.0%
05 MAR 2025A00213021Bryan DistrictMILL AND INLAY, US0290 (RM 676 + 0.56 to RM 678 + 0.06)8 of 9$1,810,781+39%
05 MAR 2025A00130696Houston DistrictSurfacing/Roadway Restoration, FS 149 (FM 1488 to FM 149)1 of 6$1,063,539Low, 3.0% under the second
04 MAR 2025A00124556Yoakum DistrictSurfacing/Roadway Restoration, FM 1301 (FM 1728 to BRAZORIA C/L)5 of 6$9,607,385+35%
04 MAR 2025A00130736Houston DistrictSurfacing/Roadway Restoration, SH 225 (IH 610 E to W of S Richey Road)5 of 5$32,772,954+49%
04 MAR 2025A00129802Houston DistrictSurfacing/Roadway Restoration, BS 35C (SH 35 North to FM 1462)3 of 3$5,754,838+13%
07 FEB 2025A00140276Houston DistrictSurfacing/Roadway Restoration, FM 3155 (Richmond State School to UA 90)3 of 7$619,148+6.0%
07 FEB 2025A00130693Houston DistrictSurfacing/Roadway Restoration, SH 75 (SL 336N to SH 105)1 of 6$3,303,124Low, 9.0% under the second
06 FEB 2025A00130307Houston DistrictSurfacing/Roadway Restoration, FM 1960 (FM 2100 to Liberty C/L)6 of 7$2,625,815+43%
06 FEB 2025A00130689Houston DistrictSurfacing/Roadway Restoration, FM 1484 (FM 2432 to SH 105)2 of 6$8,800,196+5.0%
Vulcan Materials Asphalt and Construction, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy