TxDOT contract A00130736 bid tabulation
Surfacing/Roadway Restoration, SH 225 (IH 610 E to W of S Richey Road). Let by Texas DOT on March 4, 2025, Harris, Houston District. 5 bids received; low bid $21,982,369 by Texas Materials Group, Inc., -20% against the engineer's estimate of $27,315,819.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 97
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $21,982,369 | Low | -20% |
| 2 | Isi Contracting, Inc. | $22,425,600 | +2.0% | -18% |
| 3 | Posillico Civil, Inc. | $22,658,623 | +3.0% | -17% |
| 4 | Durwood Greene Construction Co. | $30,311,188 | +38% | +11% |
| 5 | Vulcan Materials Asphalt and Construction, LLC | $32,772,954 | +49% | +20% |
Engineer's estimate: $27,315,819.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Isi Contracting, Inc. | 3. Posillico Civil, Inc. | 4. Durwood Greene Construction Co. | 5. Vulcan Materials Asphalt and Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 15,511 | $20.00 | $25.85 | $10.00 | $8.25 | $30.00 | $7.52 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 6,031.60 | $25.00 | $1.00 | $6.00 | $15.00 | $18.00 | $17.86 |
| 3 | Salvage,haul & stockpile reclaimed asphalt PV (1 to 3") (305-7034) | SY | 352,009.60 | $5.00 | $3.70 | $2.65 | $1.75 | $6.00 | $4.66 |
| 4 | D-GR HMA type D PG70-22 (level-UP) (341-7051) | TON | 16,943.90 | $158.97 | $135.00 | $118.00 | $125.00 | $165.00 | $174.73 |
| 5 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 57,780.40 | $195.16 | $188.75 | $190.00 | $178.00 | $215.00 | $267.00 |
| 6 | Plane & text asphalt concrete pavement(0" to 3") (354-7003) | SY | 9,441 | $8.50 | $13.15 | $7.25 | $2.00 | $7.00 | $6.84 |
| 7 | Full - depth repair CPJR (10") (361-7038) | CY | 1,457.60 | $468.33 | $1,530.00 | $957.00 | $1,650.00 | $1,600.00 | $2,160.00 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 670.20 | $783.80 | $745.00 | $900.00 | $600.00 | $1,400.00 | $541.40 |
| 9 | Adjusting inlets (479-7002) | EACH | 66 | $2,600.00 | $929.00 | $1,700.00 | $575.00 | $4,500.00 | $6,000.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $1,267,859 | $1,650,000 | $2,100,000 | $2,000,000 | $3,000,000 | $3,250,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,305 | $3,462.00 | $40,000 | $88,000 | $80,000 | $2,976.88 |
| 12 | Portable changeable message sign (503-7001) | DAY | 150 | $160.93 | $131.00 | $195.00 | $75.00 | $450.00 | $300.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 150 | $361.94 | $263.00 | $4,500.00 | $449.32 | $400.00 | $283.45 |
| 14 | TMA (mobile operation) (505-7002) | HR | 3,600 | $109.24 | $5.00 | $57.00 | $64.51 | $50.00 | $32.21 |
| 15 | Concrete curb (doweled) (529-7012) | LF | 32,619 | $40.78 | $1.00 | $3.50 | $40.92 | $50.00 | $53.12 |
| 16 | Concrete sidewalks (4") (531-7001) | SY | 155 | $170.00 | $104.00 | $750.00 | $118.00 | $110.00 | $79.52 |
| 17 | Curb ramps (type 1) (531-7005) | EACH | 16 | $4,600.00 | $2,185.00 | $9,000.00 | $2,600.00 | $3,500.00 | $2,105.03 |
| 18 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 115,000 | $5.19 | $0.13 | $0.28 | $0.23 | $0.25 | $0.06 |
| 19 | Metal W-beam guard fence (timber post) (540-7001) | LF | 15,511 | $33.27 | $23.00 | $16.00 | $21.10 | $29.00 | $23.65 |
| 20 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 35 | $2,502.83 | $1,815.00 | $1,390.00 | $1,660.00 | $3,100.00 | $1,985.00 |
| 21 | Downstream anchor terminal section (540-7015) | EACH | 35 | $1,697.29 | $1,575.00 | $1,071.00 | $1,444.00 | $2,100.00 | $1,280.00 |
| 22 | Remove metal beam guard fence (542-7001) | LF | 15,511 | $4.40 | $2.20 | $0.50 | $2.00 | $3.00 | $2.00 |
| 23 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 35 | $325.70 | $164.00 | $93.00 | $150.00 | $300.00 | $255.00 |
| 24 | Guardrail end treatment (install) (544-7001) | EACH | 23 | $3,567.44 | $3,212.00 | $2,384.00 | $2,940.00 | $3,850.00 | $2,460.00 |
| 25 | Guardrail end treatment (remove) (544-7003) | EACH | 23 | $398.50 | $164.00 | $93.00 | $150.00 | $350.00 | $325.00 |
| 26 | Chain link fence (install) (6') (550-7001) | LF | 580 | $50.00 | $46.50 | $55.93 | $42.50 | $65.00 | $42.50 |
| 27 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 490 | $35.00 | $13.15 | $40.03 | $14.96 | $35.00 | $12.00 |
| 28 | Conduit (RM) (2") (618-7078) | LF | 60 | $55.00 | $43.75 | $51.98 | $24.66 | $50.00 | $40.00 |
| 29 | Conduit (prepare) (618-7090) | LF | 550 | $20.00 | $0.71 | $3.95 | $10.99 | $15.00 | $0.65 |
| 30 | Ground box type D (162922)W/apron (624-7008) | EACH | 6 | $2,000.00 | $1,475.00 | $1,346.37 | $1,097.37 | $1,600.00 | $1,350.00 |
| 31 | Aluminum signs (type A) (636-7001) | SF | 535 | $56.77 | $40.00 | $39.00 | $36.00 | $35.00 | $26.00 |
| 32 | Aluminum signs (type O) (636-7003) | SF | 1,328.50 | $38.73 | $45.00 | $44.00 | $35.00 | $33.00 | $32.00 |
| 33 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $2,000.00 | $560.00 | $549.00 | $639.00 | $800.00 | $645.00 |
| 34 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 5 | $2,000.00 | $698.00 | $685.00 | $736.00 | $1,000.00 | $855.00 |
| 35 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $805.00 | $789.00 | $125.00 | $1,150.00 | $830.00 | |
| 36 | Relocate SM RD SN sup&AM(sign only) (644-7072) | EACH | 1 | $197.00 | $134.00 | $190.24 | $450.00 | $180.00 | |
| 37 | Work zone pavement marking removing (reflectorized) type I-A (662-7047) | EACH | 732 | $4.73 | $6.00 | $3.38 | $2.00 | $6.00 | $6.00 |
| 38 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 915 | $4.73 | $6.00 | $3.38 | $2.00 | $6.00 | $6.00 |
| 39 | Work zone pavement marking removing (reflectorized) type II-C-R (662-7053) | EACH | 4,575 | $4.73 | $6.00 | $3.38 | $2.00 | $6.00 | $6.00 |
| 40 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 182,960 | $1.31 | $0.33 | $1.04 | $0.49 | $0.90 | $1.30 |
| 41 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 146,450 | $1.16 | $0.33 | $0.68 | $0.49 | $0.90 | $1.15 |
| 42 | Work zone pavement marking removing (W)(entr gore) (662-7084) | EACH | 12 | $469.67 | $273.15 | $1,715.27 | $394.35 | $400.00 | $400.00 |
| 43 | Work zone pavement marking removing (W)(exit gore) (662-7085) | EACH | 13 | $537.00 | $273.15 | $1,715.27 | $351.66 | $425.00 | $400.00 |
| 44 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 51,600 | $1.13 | $0.33 | $0.62 | $0.49 | $0.90 | $1.15 |
| 45 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 86 | $17.00 | $1.75 | $2.08 | $2.50 | $2.00 | $3.00 |
| 46 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 7,297 | $5.50 | $0.98 | $1.30 | $1.75 | $3.00 | $1.25 |
| 47 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 2,163 | $9.00 | $3.28 | $2.86 | $3.75 | $4.00 | $2.50 |
| 48 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 4,380 | $25.00 | $8.74 | $7.80 | $7.50 | $12.00 | $8.50 |
| 49 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 23 | $1,135.54 | $382.41 | $1,715.27 | $1,036.18 | $450.00 | $850.00 |
| 50 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 20 | $1,282.24 | $710.19 | $1,611.31 | $2,383.86 | $800.00 | $850.00 |
| 51 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 35 | $32.78 | $19.75 | $47.50 | $50.00 | $45.00 | |
| 52 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 1,752 | $0.98 | $1.40 | $1.75 | $3.00 | $1.25 | |
| 53 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 1,141 | $3.28 | $2.86 | $3.75 | $4.00 | $2.50 | |
| 54 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 50,354 | $7.50 | $0.93 | $0.78 | $0.35 | $1.20 | $1.00 |
| 55 | Pavement sler 6" (666-7347) | LF | 236,433 | $2.37 | $0.11 | $0.22 | $0.12 | $0.15 | $0.28 |
| 56 | Pavement sler 8" (666-7348) | LF | 9,049 | $2.25 | $0.22 | $0.44 | $0.16 | $0.25 | $0.38 |
| 57 | Pavement sler 12" (666-7350) | LF | 4,719 | $2.24 | $0.26 | $0.62 | $0.24 | $0.60 | $0.65 |
| 58 | Pavement sler 24" (666-7352) | LF | 4,380 | $6.06 | $1.91 | $1.25 | $0.48 | $2.50 | $1.35 |
| 59 | Pavement sler (entr gore) (666-7361) | EACH | 23 | $192.83 | $147.50 | $259.89 | $50.00 | $200.00 | $100.00 |
| 60 | Pavement sler (exit gore) (666-7362) | EACH | 20 | $253.61 | $289.54 | $259.89 | $50.00 | $400.00 | $100.00 |
| 61 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 50,354 | $2.95 | $0.62 | $0.68 | $1.15 | $0.80 | $0.85 |
| 62 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 71,287 | $2.85 | $0.62 | $0.62 | $0.75 | $0.80 | $0.82 |
| 63 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 64,352 | $2.69 | $0.62 | $0.62 | $0.75 | $0.80 | $0.82 |
| 64 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 1,415 | $3.38 | $3.28 | $3.12 | $3.75 | $5.00 | $2.50 |
| 65 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 53 | $300.00 | $245.83 | $259.89 | $308.52 | $295.00 | $190.00 |
| 66 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 34 | $418.98 | $442.50 | $499.20 | $436.66 | $500.00 | $320.00 |
| 67 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 12 | $387.87 | $499.20 | $452.37 | $450.00 | $340.00 | |
| 68 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 2 | $600.00 | $546.30 | $717.50 | $559.05 | $700.00 | $410.00 |
| 69 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 66 | $400.00 | $327.78 | $378.40 | $376.96 | $375.00 | $265.00 |
| 70 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 6 | $686.35 | $655.56 | $715.74 | $634.48 | $800.00 | $550.00 |
| 71 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 3 | $3,000.00 | $2,731.49 | $3,072.67 | $3,147.15 | $3,500.00 | $2,600.00 |
| 72 | Reflectorized pavement marker type I-A (672-7001) | EACH | 94 | $6.56 | $4.94 | $12.00 | $7.00 | $6.50 | |
| 73 | Reflectorized pavement marker type I-C (672-7002) | EACH | 469 | $10.00 | $6.56 | $4.94 | $12.00 | $7.00 | $6.00 |
| 74 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,457 | $10.00 | $6.56 | $4.94 | $12.00 | $7.00 | $6.00 |
| 75 | Pavement surface preparation for marking (6") (678-7002) | LF | 236,433 | $2.06 | $0.01 | $0.03 | $0.06 | $0.02 | $0.02 |
| 76 | Pavement surface preparation for marking (8") (678-7004) | LF | 9,049 | $2.77 | $0.02 | $0.05 | $0.08 | $0.04 | $0.05 |
| 77 | Pavement surface preparation for marking (12") (678-7006) | LF | 4,719 | $2.83 | $0.09 | $0.07 | $0.12 | $0.15 | $0.20 |
| 78 | Pavement surface preparation for marking (24") (678-7008) | LF | 4,380 | $5.00 | $0.12 | $0.13 | $0.24 | $0.25 | $0.75 |
| 79 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 53 | $50.00 | $10.93 | $5.20 | $10.00 | $20.00 | $10.00 |
| 80 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 35 | $150.00 | $10.93 | $7.28 | $10.00 | $30.00 | $16.00 |
| 81 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 12 | $10.93 | $7.28 | $10.00 | $35.00 | $18.00 | |
| 82 | Pavement surface preparation for marking (word) (678-7016) | EACH | 66 | $50.00 | $10.93 | $5.20 | $10.00 | $40.00 | $16.00 |
| 83 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 23 | $157.40 | $54.63 | $103.96 | $40.00 | $100.00 | $50.00 |
| 84 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 20 | $158.44 | $54.63 | $103.96 | $40.00 | $150.00 | $50.00 |
| 85 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 6 | $50.75 | $54.63 | $51.98 | $20.00 | $200.00 | $35.00 |
| 86 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 3 | $150.00 | $54.63 | $103.96 | $25.00 | $300.00 | $40.00 |
| 87 | JT cleaning and sealing(trans CNTR JTS) (713-7001) | LF | 2,763 | $30.00 | $23.50 | $15.00 | $3.80 | $25.00 | $22.00 |
| 88 | JT cleaning and sealing(LNGT CNSTR JTS) (713-7002) | LF | 4,864 | $50.00 | $20.75 | $15.00 | $3.80 | $22.00 | $20.00 |
| 89 | Underseal course (3006-7001) | GAL | 105,055.30 | $6.08 | $5.50 | $4.24 | $4.20 | $6.00 | $8.33 |
| 90 | Bonding course (3007-7001) | GAL | 78,791.50 | $8.87 | $0.25 | $4.09 | $4.20 | $4.50 | $4.28 |
| 91 | VIVDS prosr sys (6006-7001) | EACH | 5 | $12,000 | $4,971.00 | $4,028.71 | $4,368.12 | $5,000.00 | $4,500.00 |
| 92 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 26 | $2,500.00 | $7,102.00 | $6,212.02 | $5,966.95 | $8,900.00 | $6,500.00 |
| 93 | VIVDS CNTRL software (6006-7005) | EACH | 5 | $770.86 | $608.00 | $826.54 | $496.03 | $1,100.00 | $550.00 |
| 94 | VIVDS cabling (6006-7007) | LF | 6,865 | $4.26 | $2.62 | $2.13 | $2.36 | $2.75 | $2.40 |
| 95 | RVDS (presence detection only) (6008-7001) | EACH | 3 | $9,280.00 | $7,983.61 | $7,667.94 | $9,900.00 | $8,400.00 | |
| 96 | RVDS (advance detection only) (6008-7002) | EACH | 1 | $9,280.00 | $7,979.71 | $7,667.95 | $9,900.00 | $8,400.00 | |
| 97 | Ground box (prepare) (6013-7006) | EACH | 6 | $700.00 | $332.00 | $389.88 | $329.57 | $700.00 | $300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.