Durwood Greene Construction Co.: TxDOT bid record
Durwood Greene Construction Co. submitted 101 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 37 of them (37%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $190,334,089
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 3 | 27% |
| 2021 | 14 | 6 | 43% |
| 2022 | 11 | 6 | 55% |
| 2023 | 1 | 0 | 0% |
| 2024 | 6 | 2 | 33% |
| 2025 | 28 | 10 | 36% |
| 2026 | 30 | 10 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 82 | 33 | 40% |
| Beaumont District | 12 | 3 | 25% |
| Bryan District | 3 | 1 | 33% |
| Yoakum District | 2 | 0 | 0% |
| Lufkin District | 2 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 77 | 31 of 77 |
| James Construction Group, LLC | 36 | 13 of 36 |
| Cornerstone Paving and Construction, L.L.C. | 30 | 12 of 30 |
| Vulcan Materials Asphalt and Construction, LLC | 26 | 10 of 26 |
| Angel Brothers Holdings Corp. | 20 | 9 of 20 |
| Hayden Paving, Inc. | 18 | 3 of 18 |
| Environmental Allies, Inc. | 16 | 7 of 16 |
| Forde Construction Company, Inc. | 15 | 8 of 15 |
| Elite Kings Construction, LLC | 12 | 7 of 12 |
| Knife River Corporation - South | 9 | 3 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00193012 | Beaumont District | Hazard Elimination & Safety, FM 1004 (0.27 MI N OF CR 634 to 2.27 MI N OF CR 634) | 2 of 2 | $2,827,776 | +16% |
| 07 OCT 2026 | A00132124 | Lufkin District | Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475) | 7 of 7 | $48,973,611 | +54% |
| 06 OCT 2026 | A00214168 | Houston District | Hazard Elimination & Safety, FM 1462 (W of Troon Dr to BS 35-C) | 1 of 2 | $974,716 | Low, 5.0% under the second |
| 06 AUG 2026 | A00215821 | Houston District | Resurface Roadway, IH 45 (North of BNSF RR to North of W Canino Rd) | 5 of 5 | $6,777,781 | +33% |
| 06 AUG 2026 | A00187526 | Bryan District | Rehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line) | 6 of 6 | $6,119,401 | +43% |
| 05 AUG 2026 | A00211687 | Beaumont District | Hazard Elimination & Safety, FM 563 (North Texas Ave to Lake Charlotte Rd) | 2 of 3 | $2,515,777 | +1.0% |
| 02 JUL 2026 | A00180186 | Beaumont District | Hazard Elimination & Safety, FM 1413 (US 90, SOUTH to HATCHERVILLE ROAD (CR 486)) | 1 of 3 | $5,657,771 | Low, 0.0% under the second |
| 02 JUL 2026 | A00210039 | Beaumont District | Preventive Maintenance, US 90 (FM 2830, EAST to FM 770 NORTH) | 2 of 3 | $1,969,127 | +2.0% |
| 02 JUL 2026 | A00210045 | Beaumont District | Preventive Maintenance, IH 10 (END OF CONCRETE SH 99, EAST to 0.17 MILES EAST of FM 565) | 1 of 3 | $3,332,075 | Low, 0.0% under the second |
| 01 JUL 2026 | A00187963 | Beaumont District | Rehabilitate Existing Roadway, FM 943 (3.6 MI SOUTH OF POLK COUNTY LINE, SOUTH to FM 1003) | 1 of 3 | $6,974,719 | Low, 4.0% under the second |
| 01 JUL 2026 | A00209198 | Houston District | Intersection Improvements With Right And/Or Left Turn Lanes, SH 36 (At Moore Bar Rd to .) | 2 of 4 | $639,149 | 0.0% |
| 03 JUN 2026 | A00216480 | Houston District | Resurface Roadway, FM 1640 (SS 529 to W of FM 2218) | 1 of 5 | $3,065,936 | Low, 11% under the second |
| 03 JUN 2026 | A00215515 | Beaumont District | Rehabilitate Existing Roadway, SS 380 (THREADNEEDLE ROAD, SOUTH to JIM GILLIGAN WAY) | 4 of 4 | $7,678,257 | +61% |
| 02 JUN 2026 | A00139363 | Houston District | Surfacing/Roadway Restoration, BU 290L (W of Fry Road to US 290 EB Frontage Road) | 2 of 4 | $817,008 | +11% |
| 07 MAY 2026 | A00215811 | Houston District | Resurface Roadway, SL 8 (West of Hardy St. to 0.2 Mi East of Aldine Westfield Rd.) | 5 of 5 | $3,317,778 | +47% |
| 06 MAY 2026 | A00130695 | Houston District | Surfacing/Roadway Restoration, SL 494 (Via Principale Pkwy. to Royal Crossing Dr./Northpark Plaza Dr.) | 1 of 6 | $5,153,278 | Low, 11% under the second |
| 08 APR 2026 | A00188777 | Houston District | Resurface Roadway, FM 1887 (SH 159 to FM 359) | 3 of 5 | $1,236,497 | +8.0% |
| 08 APR 2026 | A00196681 | Beaumont District | Surfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69) | 3 of 5 | $21,991,337 | +5.0% |
| 08 APR 2026 | A00200748 | Bryan District | Surfacing/Roadway Restoration, US 290 (1.3 Mi E of FM 577 to 3 Mi E of FM 1371 (Brazos River Bridge)) | 1 of 7 | $6,537,278 | Low, 3.0% under the second |
| 07 APR 2026 | A00140549 | Houston District | Rehabilitate Existing Roadway, FM 2100 (San Jacinto River Authority Canal to S of BU 90-U) | 4 of 4 | $1,948,559 | +8.0% |
| 04 MAR 2026 | A00188698 | Houston District | Surfacing/Roadway Restoration, FM 517 (SH 146 to FM 646) | 2 of 7 | $3,362,976 | +1.0% |
| 05 FEB 2026 | A00209339 | Houston District | Surfacing/Roadway Restoration, FM 865 (IH 610 to Almeda Genoa Rd) | 5 of 5 | $4,858,238 | +18% |
| 05 FEB 2026 | A00188002 | Beaumont District | Surfacing/Roadway Restoration, SH 105 (US 59, EAST to SH 321) | 3 of 5 | $2,917,774 | +5.0% |
| 04 FEB 2026 | A00188781 | Houston District | Surfacing/Roadway Restoration, FM 529 (Brazos River to FM 362) | 1 of 7 | $3,274,774 | Low, 14% under the second |
| 04 FEB 2026 | A00186267 | Lufkin District | Resurface Roadway, US 59 (0.9 mi N of Piney Creek to Angelina County Line) | 2 of 3 | $9,927,776 | +10% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.