Durwood Greene Construction Co.: TxDOT bid record

Durwood Greene Construction Co. submitted 101 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 37 of them (37%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Texas DOT
Low bid volume
$190,334,089
Latest bid
04 NOV 2026
Data through
19 NOV 2026
101Bids
37Low bids
37Win rate, percent
+9.0%Median gap to the low bid when not low, 64 bids

By year

YearBidsLow bidsWin rate
202011327%
202114643%
202211655%
2023100%
20246233%
2025281036%
2026301033%
Durwood Greene Construction Co., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District823340%
Beaumont District12325%
Bryan District3133%
Yoakum District200%
Lufkin District200%
Durwood Greene Construction Co., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (mobile operation)505-7003DAY8431 (37%)$250.00$291.17
Work zone pavement marking non-removing (W)8"(solid)662-7012LF6931 (45%)$0.50$0.62
Reflectorized pavement marking type I (W)24"(solid)(100MIL)666-7036LF7430 (41%)$7.00$8.00
Reflectorized pavement marker type II-A-A672-7004EACH7927 (34%)$6.00$5.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF7226 (36%)$1.10$1.10
Backfill (type A or B)134-7004STA5824 (41%)$215.00$250.00
Work zone pavement marking non-removing (W)(arrow)662-7018EACH5923 (39%)$75.00$85.25
Work zone pavement marking non-removing (Y)6"(solid)662-7038LF5123 (45%)$0.30$0.40
Reflectorized pavement marker type I-C672-7002EACH6322 (35%)$6.00$5.00
Work zone pavement marking non-removing (W)6"(solid)662-7008LF5222 (42%)$0.30$0.39
Work zone pavement marking non-removing (W)24"(solid)662-7017LF6521 (32%)$3.00$5.00
Work zone pavement marking non-removing(W)(word)662-7030EACH5620 (36%)$80.00$100.00
Durwood Greene Construction Co., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Durwood Greene Construction Co., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00193012Beaumont DistrictHazard Elimination & Safety, FM 1004 (0.27 MI N OF CR 634 to 2.27 MI N OF CR 634)2 of 2$2,827,776+16%
07 OCT 2026A00132124Lufkin DistrictIntersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475)7 of 7$48,973,611+54%
06 OCT 2026A00214168Houston DistrictHazard Elimination & Safety, FM 1462 (W of Troon Dr to BS 35-C)1 of 2$974,716Low, 5.0% under the second
06 AUG 2026A00215821Houston DistrictResurface Roadway, IH 45 (North of BNSF RR to North of W Canino Rd)5 of 5$6,777,781+33%
06 AUG 2026A00187526Bryan DistrictRehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line)6 of 6$6,119,401+43%
05 AUG 2026A00211687Beaumont DistrictHazard Elimination & Safety, FM 563 (North Texas Ave to Lake Charlotte Rd)2 of 3$2,515,777+1.0%
02 JUL 2026A00180186Beaumont DistrictHazard Elimination & Safety, FM 1413 (US 90, SOUTH to HATCHERVILLE ROAD (CR 486))1 of 3$5,657,771Low, 0.0% under the second
02 JUL 2026A00210039Beaumont DistrictPreventive Maintenance, US 90 (FM 2830, EAST to FM 770 NORTH)2 of 3$1,969,127+2.0%
02 JUL 2026A00210045Beaumont DistrictPreventive Maintenance, IH 10 (END OF CONCRETE SH 99, EAST to 0.17 MILES EAST of FM 565)1 of 3$3,332,075Low, 0.0% under the second
01 JUL 2026A00187963Beaumont DistrictRehabilitate Existing Roadway, FM 943 (3.6 MI SOUTH OF POLK COUNTY LINE, SOUTH to FM 1003)1 of 3$6,974,719Low, 4.0% under the second
01 JUL 2026A00209198Houston DistrictIntersection Improvements With Right And/Or Left Turn Lanes, SH 36 (At Moore Bar Rd to .)2 of 4$639,1490.0%
03 JUN 2026A00216480Houston DistrictResurface Roadway, FM 1640 (SS 529 to W of FM 2218)1 of 5$3,065,936Low, 11% under the second
03 JUN 2026A00215515Beaumont DistrictRehabilitate Existing Roadway, SS 380 (THREADNEEDLE ROAD, SOUTH to JIM GILLIGAN WAY)4 of 4$7,678,257+61%
02 JUN 2026A00139363Houston DistrictSurfacing/Roadway Restoration, BU 290L (W of Fry Road to US 290 EB Frontage Road)2 of 4$817,008+11%
07 MAY 2026A00215811Houston DistrictResurface Roadway, SL 8 (West of Hardy St. to 0.2 Mi East of Aldine Westfield Rd.)5 of 5$3,317,778+47%
06 MAY 2026A00130695Houston DistrictSurfacing/Roadway Restoration, SL 494 (Via Principale Pkwy. to Royal Crossing Dr./Northpark Plaza Dr.)1 of 6$5,153,278Low, 11% under the second
08 APR 2026A00188777Houston DistrictResurface Roadway, FM 1887 (SH 159 to FM 359)3 of 5$1,236,497+8.0%
08 APR 2026A00196681Beaumont DistrictSurfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69)3 of 5$21,991,337+5.0%
08 APR 2026A00200748Bryan DistrictSurfacing/Roadway Restoration, US 290 (1.3 Mi E of FM 577 to 3 Mi E of FM 1371 (Brazos River Bridge))1 of 7$6,537,278Low, 3.0% under the second
07 APR 2026A00140549Houston DistrictRehabilitate Existing Roadway, FM 2100 (San Jacinto River Authority Canal to S of BU 90-U)4 of 4$1,948,559+8.0%
04 MAR 2026A00188698Houston DistrictSurfacing/Roadway Restoration, FM 517 (SH 146 to FM 646)2 of 7$3,362,976+1.0%
05 FEB 2026A00209339Houston DistrictSurfacing/Roadway Restoration, FM 865 (IH 610 to Almeda Genoa Rd)5 of 5$4,858,238+18%
05 FEB 2026A00188002Beaumont DistrictSurfacing/Roadway Restoration, SH 105 (US 59, EAST to SH 321)3 of 5$2,917,774+5.0%
04 FEB 2026A00188781Houston DistrictSurfacing/Roadway Restoration, FM 529 (Brazos River to FM 362)1 of 7$3,274,774Low, 14% under the second
04 FEB 2026A00186267Lufkin DistrictResurface Roadway, US 59 (0.9 mi N of Piney Creek to Angelina County Line)2 of 3$9,927,776+10%
Durwood Greene Construction Co.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy