TxDOT contract A00215811 bid tabulation

Resurface Roadway, SL 8 (West of Hardy St. to 0.2 Mi East of Aldine Westfield Rd.). Let by Texas DOT on May 7, 2026, Harris, Houston District. 5 bids received; low bid $2,254,486 by Environmental Allies, Inc., -1.4% against the engineer's estimate of $2,286,187.

Owner
Texas DOT
Letting
07 MAY 2026
Pay items
66
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Environmental Allies, Inc.$2,254,486Low-1.0%
2Texas Materials Group, Inc.$2,276,558+1.0%0.0%
3Hayden Paving, Inc.$2,758,532+22%+21%
4Isi Contracting, Inc.$3,212,945+43%+41%
5Durwood Greene Construction Co.$3,317,778+47%+45%
TxDOT contract A00215811: bids by rank

Engineer's estimate: $2,286,187.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Environmental Allies, Inc.2. Texas Materials Group, Inc.3. Hayden Paving, Inc.4. Isi Contracting, Inc.5. Durwood Greene Construction Co.
1Removing concrete (mowstrip) (104-7005)LF1,000$22.00$20.00$13.00$25.00$13.00$35.00
2Removing concrete (medians) (104-7009)CY10$20.00$75.00$176.00$30.00$167.00$250.00
3Removing concrete (curb) (104-7016)LF401$12.00$4.00$78.00$70.00$74.00$25.00
4Backfill (type A or B) (134-7004)STA160$200.00$315.00$175.00$150.00$1,800.00$400.00
5Asphalt (AC-20-5TR or AC-20XP) (316-7067)GAL24,691$4.00$4.50$3.50$5.50$4.56$6.00
6Aggregate (type-PB, GR-4)(sac-B) (316-7211)CY528$130.00$305.00$225.00$350.00$283.84$275.00
7SP mixes SP-D sac-A PG76-22 (344-7064)TON7,544$153.00$140.00$153.00$175.00$177.58$195.00
8Tack coat (344-7077)GAL7,544$3.50$3.65$0.10$3.00$4.19$4.00
9Flexible pavement structure repair(8") (351-7007)SY2,357$75.00$72.50$88.00$120.00$108.49$85.00
10Planing asphalt concrete pavement(0" to 2") (354-7032)SY666$6.00$12.25$13.00$5.50$32.09$20.00
11Plane concrete pavement(0" to 2") (354-7066)SY2,549.37$10.00$7.85$20.00$14.00$13.95$35.00
12Full - depth repair CPJR (8") (361-7036)CY175$1,200.00$1,500.00$1,200.00$900.00$1,150.00$2,500.00
13Riprap (concrete) (CL B) (6 in) (432-7009)CY10$550.00$525.00$865.00$750.00$820.00$1,500.00
14Riprap (mow strip)(4 in) (432-7013)CY42$833.00$750.00$711.00$800.00$1,161.00$1,200.00
15Cleaning and sealing existing joints (438-7001)LF100$45.00$40.00$27.50$30.00$26.00$185.00
16Adjusting manholes (479-7001)EACH1$2,000.00$750.00$369.00$4,300.00$601.32$2,555.00
17Mobilization (500-7001)LS1$207,835$100,238$47,000$95,000$290,000$250,000
18Barricades, signs and traffic handling (502-7001)MO4$8,000.00$8,000.00$1,150.00$26,000$32,421$12,000
19Portable changeable message sign (503-7001)DAY28$160.00$125.00$127.00$250.00$179.80$500.00
20TMA (stationary) (505-7001)DAY62$330.00$250.00$445.00$750.00$550.00$450.00
21TMA (mobile operation) (505-7003)DAY4$170.00$350.00$360.00$800.00$804.32$450.00
22Concrete curb (mono) (type II) (529-7007)LF401$20.00$9.00$211.00$150.00$16.32$90.00
23Concrete sidewalks (6") (531-7003)SY10$100.00$175.00$896.00$115.00$118.46$350.00
24Metal W-beam guard fence (timber post) (540-7001)LF587.50$26.00$26.00$27.50$30.00$26.00$32.00
25Downstream anchor terminal section (540-7015)EACH5$1,200.00$1,300.00$1,635.00$1,500.00$1,493.00$1,950.00
26Metal W - beam guard fence (low fill culvert) (540-7018)LF37.50$75.00$128.00$111.00$150.00$93.00$125.00
27Remove metal beam guard fence (542-7001)LF625$3.00$2.65$3.75$2.35$10.00$4.00
28Remove terminal anchor section (542-7002)EACH5$325.00$365.00$363.00$410.00$430.00$250.00
29Guardrail end treatment (install) (544-7001)EACH5$2,400.00$3,700.00$3,425.00$4,400.00$3,510.00$3,950.00
30Guardrail end treatment (remove) (544-7003)EACH5$300.00$365.00$290.00$410.00$430.00$300.00
31Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH3$25.00$27.50$37.00$30.00$41.84$35.00
32Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH14$25.00$27.50$32.00$30.00$41.84$35.00
33Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,530$0.37$0.42$0.40$0.45$0.79$0.45
34Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF14,589$0.32$0.35$0.35$0.38$0.79$0.40
35Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,634$0.70$0.55$0.50$0.55$1.94$0.70
36Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF1,434$4.17$2.75$2.15$2.35$9.95$3.00
37Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH12$80.00$75.00$53.00$60.00$193.76$65.00
38Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH8$100.00$75.00$53.00$60.00$277.54$75.00
39Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH4$114.35$75.00$53.00$60.00$235.65$90.00
40Work zone pavement marking non-removing(W)(word) (662-7030)EACH14$100.00$75.00$53.00$60.00$235.65$80.00
41Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF10,150$0.30$0.35$0.35$0.35$0.79$0.40
42Work zone pavement marking removing (reflectorized) type I-A (662-7047)EACH52$4.50$5.25$5.25$7.00$7.85$7.00
43Work zone pavement marking removing (reflectorized) type II-C-R (662-7053)EACH339$4.00$5.25$5.25$7.00$7.85$7.00
44Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH3,006$1.30$1.40$0.70$3.50$2.36$3.00
45Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH208$0.55$1.40$0.70$3.50$2.04$3.00
46Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF38$2.25$1.25$1.05$1.20$5.24$5.00
47Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF2,442$1.15$1.25$1.05$1.20$2.04$1.50
48Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF330$3.65$3.75$3.70$4.10$4.19$5.00
49Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF1,040$2.00$1.10$1.05$1.20$2.04$1.50
50Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF463$3.25$3.75$3.70$4.10$4.19$5.00
51Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF360$1.50$5.25$5.25$5.80$1.94$15.00
52Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF450$1.50$5.25$5.25$5.80$1.94$15.00
53Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF192$2.00$5.25$5.25$5.80$3.09$22.00
54All-wther PM type I (W)6"(solid)(100MIL) (666-7309)LF13,989$0.85$0.90$0.75$0.85$0.99$0.90
55All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF4,130$0.85$0.90$0.75$0.85$1.41$0.90
56All-wther PM type I (W)6"(DOT)(100MIL) (666-7311)LF52$5.00$0.90$0.75$0.85$5.24$0.90
57All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF9,946$0.82$0.90$0.75$0.85$0.99$0.90
58Prefabricated PM type C (W)(24")(solid) (668-7089)LF1,434$12.60$15.50$16.00$18.00$16.50$20.00
59Prefabricated PM type C (W)(arrow) (668-7091)EACH6$210.00$265.00$264.00$290.00$288.02$300.00
60Prefabricated PM type C (W)(double arrow) (668-7093)EACH4$314.00$285.00$264.00$290.00$434.64$400.00
61Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH2$322.00$285.00$264.00$290.00$434.64$450.00
62Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH3$546.00$450.00$422.00$465.00$675.53$600.00
63Prefabricated PM type C (W)(word) (668-7103)EACH7$275.00$285.00$264.00$290.00$413.70$350.00
64Reflectorized pavement marker type I-A (672-7001)EACH43$6.25$6.35$6.35$7.00$7.59$7.00
65Reflectorized pavement marker type II-C-R (672-7006)EACH339$5.00$6.35$6.35$7.00$7.33$7.00
66Spalling repair (hydraulic cement) (720-7001)CF34$400.00$575.00$243.00$265.00$230.00$600.00
TxDOT contract A00215811: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy