TxDOT contract A00196681 bid tabulation
Surfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69). Let by Texas DOT on April 8, 2026, Tyler, Beaumont District. 5 bids received; low bid $20,919,240 by Drewery Construction Company, Incorporated, +1.2% against the engineer's estimate of $20,662,478.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 68
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Drewery Construction Company, Incorporated | $20,919,240 | Low | +1.0% |
| 2 | Pinto Construction Co., Inc. | $21,505,037 | +3.0% | +4.0% |
| 3 | Durwood Greene Construction Co. | $21,991,337 | +5.0% | +6.0% |
| 4 | A. L. Helmcamp, Inc. | $23,859,355 | +14% | +15% |
| 5 | CK Newberry, LLC | $24,947,071 | +19% | +21% |
Engineer's estimate: $20,662,478.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Drewery Construction Company, Incorporated | 2. Pinto Construction Co., Inc. | 3. Durwood Greene Construction Co. | 4. A. L. Helmcamp, Inc. | 5. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 663 | $1,000.00 | $750.00 | $799.66 | $750.00 | $2,000.00 | $500.00 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 315 | $25.00 | $25.00 | $38.50 | $35.00 | $100.00 | $100.00 |
| 3 | Subgr widen (OC) (112-7001) | STA | 23 | $280.00 | $1,200.00 | $514.72 | $2,400.00 | $355.00 | $800.00 |
| 4 | Backfill (type A or B) (134-7004) | STA | 663 | $200.00 | $150.00 | $332.35 | $650.00 | $630.00 | $400.00 |
| 5 | Broadcast seed (permanent_urban_clay) (164-7004) | SY | 74,286 | $0.50 | $0.14 | $0.17 | $0.24 | $0.20 | $0.20 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 74,286 | $0.50 | $0.12 | $0.15 | $0.15 | $0.17 | $0.15 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 74,286 | $0.50 | $0.12 | $0.15 | $0.15 | $0.17 | $0.15 |
| 8 | Vegetative watering (168-7001) | TGL | 420 | $50.00 | $1.00 | $0.01 | $40.00 | $10.00 | $50.00 |
| 9 | FL BS (compacted in place)(type A GR 1-2) (12") (247-7113) | SY | 2,934 | $5.00 | $45.00 | $57.17 | $55.00 | $50.00 | $55.00 |
| 10 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 3,758 | $80.00 | $120.00 | $151.78 | $155.00 | $165.00 | $150.00 |
| 11 | Rework BS metal (type C)(9")(ord comp) (251-7085) | SY | 337,642 | $2.50 | $1.00 | $2.15 | $3.00 | $2.25 | $1.00 |
| 12 | Cement (290-7001) | TON | 1,486 | $220.00 | $210.00 | $201.00 | $230.00 | $190.00 | $200.00 |
| 13 | Emulsion (standard yield) (290-7002) | GAL | 1,320,181 | $2.00 | $3.00 | $3.14 | $2.90 | $2.85 | $3.25 |
| 14 | Emul TRT (existing matrl & new base)(9") (290-7020) | SY | 337,642 | $1.50 | $4.00 | $3.01 | $2.38 | $2.75 | $3.50 |
| 15 | Fog seal (CSS-1H) (315-7004) | GAL | 20,259 | $5.00 | $2.03 | $9.99 | $2.25 | $2.50 | $5.50 |
| 16 | D-GR HMA type-C PG70-22 (341-7022) | TON | 37,141 | $140.00 | $136.00 | $130.92 | $145.00 | $140.00 | $140.00 |
| 17 | Tack coat (341-7082) | GAL | 20,259 | $4.00 | $2.00 | $6.00 | $3.50 | $3.60 | $4.25 |
| 18 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 37,141 | $145.00 | $145.00 | $144.92 | $160.00 | $155.00 | $155.00 |
| 19 | Tack coat (344-7077) | GAL | 20,259 | $4.00 | $6.00 | $6.00 | $3.50 | $3.60 | $4.25 |
| 20 | Flexible pavement structure repair(12") (351-7011) | SY | 4,889 | $120.00 | $125.00 | $117.80 | $124.00 | $165.00 | $150.00 |
| 21 | Riprap (mow strip)(4 in) (432-7013) | CY | 57 | $500.00 | $1,200.00 | $961.80 | $1,200.00 | $1,000.00 | $1,000.00 |
| 22 | Mobilization (500-7001) | LS | 1 | $2,000,000 | $850,000 | $1,000,000 | $900,000 | $2,000,000 | $2,250,000 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 20 | $3,000.00 | $7,500.00 | $5,000.00 | $6,000.00 | $15,000 | $50,000 |
| 24 | TMA (stationary) (505-7001) | DAY | 208 | $400.00 | $100.00 | $300.00 | $350.00 | $275.00 | $500.00 |
| 25 | TMA (mobile operation) (505-7003) | DAY | 87 | $400.00 | $750.00 | $50.00 | $275.00 | $650.00 | $25.00 |
| 26 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,500 | $5.00 | $15.00 | $5.50 | $8.50 | $7.25 | $10.00 |
| 27 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,500 | $1.00 | $2.00 | $1.10 | $1.50 | $1.35 | $2.00 |
| 28 | Intrsct, drvways, & turnout (concrete) (530-7021) | SY | 6,692 | $70.00 | $75.00 | $87.30 | $40.00 | $75.00 | $205.00 |
| 29 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 129,600 | $1.00 | $0.16 | $0.20 | $0.20 | $0.25 | $0.20 |
| 30 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 66,857 | $1.00 | $0.16 | $0.22 | $0.22 | $0.25 | $0.25 |
| 31 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,300 | $50.00 | $24.00 | $28.33 | $32.00 | $23.00 | $25.00 |
| 32 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,200.00 | $1,500.00 | $2,293.50 | $2,700.00 | $1,670.00 | $1,800.00 |
| 33 | Remove metal beam guard fence (542-7001) | LF | 1,300 | $2.00 | $1.00 | $2.75 | $3.30 | $2.10 | $2.25 |
| 34 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $165.00 | $200.00 | $275.00 | $3,800.00 | $210.00 | $250.00 |
| 35 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,000.00 | $3,100.00 | $3,190.00 | $363.00 | $3,255.00 | $3,500.00 |
| 36 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $300.00 | $100.00 | $275.00 | $352.00 | $210.00 | $250.00 |
| 37 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 102 | $200.00 | $355.00 | $236.50 | $352.00 | $273.00 | $300.00 |
| 38 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 5 | $300.00 | $400.00 | $264.00 | $396.00 | $289.00 | $325.00 |
| 39 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 2 | $700.00 | $825.00 | $654.50 | $957.00 | $683.00 | $600.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 101 | $700.00 | $725.00 | $577.50 | $737.00 | $814.00 | $700.00 |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 10 | $800.00 | $900.00 | $863.50 | $980.00 | $893.00 | $800.00 |
| 42 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 2 | $900.00 | $775.00 | $715.00 | $830.00 | $893.00 | $700.00 |
| 43 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $800.00 | $1,120.00 | $1,292.50 | $1,200.00 | $1,040.00 | $1,000.00 |
| 44 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 3 | $1,000.00 | $1,250.00 | $1,336.50 | $1,350.00 | $1,040.00 | $1,000.00 |
| 45 | Remove SM RD SN sup&AM (644-7073) | EACH | 118 | $100.00 | $125.00 | $104.50 | $120.00 | $105.00 | $100.00 |
| 46 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002) | EACH | 24 | $26.00 | $50.00 | $46.75 | $55.00 | $105.00 | $25.00 |
| 47 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 108 | $110.00 | $175.00 | $104.50 | $115.00 | $89.00 | $175.00 |
| 48 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 92 | $12.00 | $35.00 | $22.00 | $40.00 | $83.00 | $75.00 |
| 49 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 26 | $21.00 | $35.00 | $22.00 | $45.00 | $83.00 | $75.00 |
| 50 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 5,000 | $0.50 | $0.51 | $0.39 | $0.23 | $0.22 | $0.25 |
| 51 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 273,430 | $0.50 | $0.51 | $0.39 | $0.23 | $0.22 | $0.25 |
| 52 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 4,600 | $1.00 | $0.57 | $0.50 | $0.50 | $0.44 | $0.50 |
| 53 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 19,646 | $0.50 | $0.53 | $0.39 | $0.23 | $0.22 | $0.25 |
| 54 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 165,020 | $0.50 | $0.53 | $0.39 | $0.23 | $0.22 | $0.25 |
| 55 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 230 | $1.00 | $2.75 | $2.75 | $2.50 | $1.11 | $3.00 |
| 56 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 9,436 | $1.00 | $2.75 | $2.75 | $2.50 | $1.11 | $3.00 |
| 57 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 2,300 | $1.00 | $1.02 | $1.05 | $1.00 | $0.95 | $1.00 |
| 58 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 6,000 | $1.00 | $0.85 | $0.79 | $0.57 | $0.55 | $0.55 |
| 59 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 135,714 | $1.00 | $0.79 | $0.79 | $0.57 | $0.55 | $0.55 |
| 60 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 11,830 | $1.00 | $0.85 | $0.79 | $0.57 | $0.55 | $0.55 |
| 61 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 85,508 | $1.00 | $0.79 | $0.79 | $0.57 | $0.55 | $0.55 |
| 62 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 400 | $16.00 | $20.00 | $11.00 | $19.80 | $19.00 | $20.00 |
| 63 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 30 | $265.00 | $300.00 | $192.50 | $275.00 | $262.00 | $250.00 |
| 64 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $350.00 | $330.00 | $247.50 | $363.00 | $346.00 | $350.00 |
| 65 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 25 | $250.00 | $70.00 | $27.50 | $60.50 | $58.00 | $60.00 |
| 66 | Reflectorized pavement marker type I-C (672-7002) | EACH | 125 | $5.00 | $6.80 | $5.50 | $6.00 | $5.75 | $5.75 |
| 67 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,308 | $5.00 | $6.23 | $5.50 | $6.00 | $5.75 | $5.75 |
| 68 | Portable changeable message sign (6033-7001) | EACH | 2 | $10,000 | $12,000 | $10,000 | $15,000 | $15,000 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.