TxDOT contract A00196681 bid tabulation

Surfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69). Let by Texas DOT on April 8, 2026, Tyler, Beaumont District. 5 bids received; low bid $20,919,240 by Drewery Construction Company, Incorporated, +1.2% against the engineer's estimate of $20,662,478.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
68
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Drewery Construction Company, Incorporated$20,919,240Low+1.0%
2Pinto Construction Co., Inc.$21,505,037+3.0%+4.0%
3Durwood Greene Construction Co.$21,991,337+5.0%+6.0%
4A. L. Helmcamp, Inc.$23,859,355+14%+15%
5CK Newberry, LLC$24,947,071+19%+21%
TxDOT contract A00196681: bids by rank

Engineer's estimate: $20,662,478.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Drewery Construction Company, Incorporated2. Pinto Construction Co., Inc.3. Durwood Greene Construction Co.4. A. L. Helmcamp, Inc.5. CK Newberry, LLC
1Preparing row (100-7002)STA663$1,000.00$750.00$799.66$750.00$2,000.00$500.00
2Removing concrete (mowstrip) (104-7003)SY315$25.00$25.00$38.50$35.00$100.00$100.00
3Subgr widen (OC) (112-7001)STA23$280.00$1,200.00$514.72$2,400.00$355.00$800.00
4Backfill (type A or B) (134-7004)STA663$200.00$150.00$332.35$650.00$630.00$400.00
5Broadcast seed (permanent_urban_clay) (164-7004)SY74,286$0.50$0.14$0.17$0.24$0.20$0.20
6Broadcast seed (temporary_warm) (164-7005)SY74,286$0.50$0.12$0.15$0.15$0.17$0.15
7Broadcast seed (temporary_cool) (164-7006)SY74,286$0.50$0.12$0.15$0.15$0.17$0.15
8Vegetative watering (168-7001)TGL420$50.00$1.00$0.01$40.00$10.00$50.00
9FL BS (compacted in place)(type A GR 1-2) (12") (247-7113)SY2,934$5.00$45.00$57.17$55.00$50.00$55.00
10FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176)CY3,758$80.00$120.00$151.78$155.00$165.00$150.00
11Rework BS metal (type C)(9")(ord comp) (251-7085)SY337,642$2.50$1.00$2.15$3.00$2.25$1.00
12Cement (290-7001)TON1,486$220.00$210.00$201.00$230.00$190.00$200.00
13Emulsion (standard yield) (290-7002)GAL1,320,181$2.00$3.00$3.14$2.90$2.85$3.25
14Emul TRT (existing matrl & new base)(9") (290-7020)SY337,642$1.50$4.00$3.01$2.38$2.75$3.50
15Fog seal (CSS-1H) (315-7004)GAL20,259$5.00$2.03$9.99$2.25$2.50$5.50
16D-GR HMA type-C PG70-22 (341-7022)TON37,141$140.00$136.00$130.92$145.00$140.00$140.00
17Tack coat (341-7082)GAL20,259$4.00$2.00$6.00$3.50$3.60$4.25
18SP mixes SP-C sac-A PG76-22 (344-7030)TON37,141$145.00$145.00$144.92$160.00$155.00$155.00
19Tack coat (344-7077)GAL20,259$4.00$6.00$6.00$3.50$3.60$4.25
20Flexible pavement structure repair(12") (351-7011)SY4,889$120.00$125.00$117.80$124.00$165.00$150.00
21Riprap (mow strip)(4 in) (432-7013)CY57$500.00$1,200.00$961.80$1,200.00$1,000.00$1,000.00
22Mobilization (500-7001)LS1$2,000,000$850,000$1,000,000$900,000$2,000,000$2,250,000
23Barricades, signs and traffic handling (502-7001)MO20$3,000.00$7,500.00$5,000.00$6,000.00$15,000$50,000
24TMA (stationary) (505-7001)DAY208$400.00$100.00$300.00$350.00$275.00$500.00
25TMA (mobile operation) (505-7003)DAY87$400.00$750.00$50.00$275.00$650.00$25.00
26Biodegradable erosion control logs (install) (12") (506-7044)LF1,500$5.00$15.00$5.50$8.50$7.25$10.00
27Biodegradable erosion control logs (remove) (506-7046)LF1,500$1.00$2.00$1.10$1.50$1.35$2.00
28Intrsct, drvways, & turnout (concrete) (530-7021)SY6,692$70.00$75.00$87.30$40.00$75.00$205.00
29Mill rumble strips (asphalt) (shoulder) (533-7001)LF129,600$1.00$0.16$0.20$0.20$0.25$0.20
30Mill rumble strips (asphalt) (centerline) (533-7002)LF66,857$1.00$0.16$0.22$0.22$0.25$0.25
31Metal W-beam guard fence (timber post) (540-7001)LF1,300$50.00$24.00$28.33$32.00$23.00$25.00
32Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$1,200.00$1,500.00$2,293.50$2,700.00$1,670.00$1,800.00
33Remove metal beam guard fence (542-7001)LF1,300$2.00$1.00$2.75$3.30$2.10$2.25
34RM metal beam guard fence trans (thrie-beam) (542-7004)EACH4$165.00$200.00$275.00$3,800.00$210.00$250.00
35Guardrail end treatment (install) (544-7001)EACH6$3,000.00$3,100.00$3,190.00$363.00$3,255.00$3,500.00
36Guardrail end treatment (remove) (544-7003)EACH6$300.00$100.00$275.00$352.00$210.00$250.00
37Mailbox install-S (TWW-post) type 4 (560-7008)EACH102$200.00$355.00$236.50$352.00$273.00$300.00
38Mailbox install-D (TWW-post) type 4 (560-7009)EACH5$300.00$400.00$264.00$396.00$289.00$325.00
39Mailbox install-M (TWW-post) type 4 (560-7010)EACH2$700.00$825.00$654.50$957.00$683.00$600.00
40Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH101$700.00$725.00$577.50$737.00$814.00$700.00
41Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH10$800.00$900.00$863.50$980.00$893.00$800.00
42Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH2$900.00$775.00$715.00$830.00$893.00$700.00
43Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$800.00$1,120.00$1,292.50$1,200.00$1,040.00$1,000.00
44Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH3$1,000.00$1,250.00$1,336.50$1,350.00$1,040.00$1,000.00
45Remove SM RD SN sup&AM (644-7073)EACH118$100.00$125.00$104.50$120.00$105.00$100.00
46Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002)EACH24$26.00$50.00$46.75$55.00$105.00$25.00
47Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH108$110.00$175.00$104.50$115.00$89.00$175.00
48Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH92$12.00$35.00$22.00$40.00$83.00$75.00
49Install OM SM RD sign (1-OM-PW)R (658-7318)EACH26$21.00$35.00$22.00$45.00$83.00$75.00
50Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF5,000$0.50$0.51$0.39$0.23$0.22$0.25
51Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF273,430$0.50$0.51$0.39$0.23$0.22$0.25
52Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF4,600$1.00$0.57$0.50$0.50$0.44$0.50
53Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF19,646$0.50$0.53$0.39$0.23$0.22$0.25
54Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF165,020$0.50$0.53$0.39$0.23$0.22$0.25
55Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH230$1.00$2.75$2.75$2.50$1.11$3.00
56Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH9,436$1.00$2.75$2.75$2.50$1.11$3.00
57Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF2,300$1.00$1.02$1.05$1.00$0.95$1.00
58Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF6,000$1.00$0.85$0.79$0.57$0.55$0.55
59Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF135,714$1.00$0.79$0.79$0.57$0.55$0.55
60Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF11,830$1.00$0.85$0.79$0.57$0.55$0.55
61Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF85,508$1.00$0.79$0.79$0.57$0.55$0.55
62Prefabricated PM type C (W)(24")(solid) (668-7089)LF400$16.00$20.00$11.00$19.80$19.00$20.00
63Prefabricated PM type C (W)(arrow) (668-7091)EACH30$265.00$300.00$192.50$275.00$262.00$250.00
64Prefabricated PM type C (W)(word) (668-7103)EACH12$350.00$330.00$247.50$363.00$346.00$350.00
65Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH25$250.00$70.00$27.50$60.50$58.00$60.00
66Reflectorized pavement marker type I-C (672-7002)EACH125$5.00$6.80$5.50$6.00$5.75$5.75
67Reflectorized pavement marker type II-A-A (672-7004)EACH2,308$5.00$6.23$5.50$6.00$5.75$5.75
68Portable changeable message sign (6033-7001)EACH2$10,000$12,000$10,000$15,000$15,000$25,000
TxDOT contract A00196681: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy