TxDOT contract A00180186 bid tabulation

Hazard Elimination & Safety, FM 1413 (US 90, SOUTH to HATCHERVILLE ROAD (CR 486)). Let by Texas DOT on July 2, 2026, Liberty, Beaumont District. 3 bids received; low bid $5,657,771 by Durwood Greene Construction Co., -18% against the engineer's estimate of $6,892,327.

Owner
Texas DOT
Letting
02 JUL 2026
Pay items
67
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Durwood Greene Construction Co.$5,657,771Low-18%
2Texas Materials Group, Inc.$5,663,4470.0%-18%
3Hayden Paving, Inc.$6,800,528+20%-1.0%
TxDOT contract A00180186: bids by rank

Engineer's estimate: $6,892,327.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Durwood Greene Construction Co.2. Texas Materials Group, Inc.3. Hayden Paving, Inc.
1Preparing row (100-7002)STA120$600.00$435.00$1,050.00
2Removing concrete (mowstrip) (104-7003)SY256$25.00$27.00$20.50$54.00
3Subgr widen (OC) (112-7003)SY140$65.00$44.00$66.00
4Backfill (type A or B) (134-7004)STA289$250.00$528.00$405.00
5Hydro mulch seed (permanent_rural_sandy) (164-7017)SY25,605$1.00$0.40$0.40$0.50
6Vegetative watering (168-7001)TGL215$20.00$35.00$65.00$60.00
7Asphalt (AC-20-5TR or AC-20XP) (316-7067)GAL34,518$3.30$4.50$5.00
8Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245)CY738$220.00$234.00$344.00
9D-GR HMA type-B PG64-22 (341-7001)TON62$130.00$376.00$355.00
10D-GR HMA type D PG 64-22 (exempt) (341-7064)TON6,718$124.00$131.00$139.00
11Tack coat (341-7082)GAL4,885$3.75$4.00$4.00
12SP mixes SP-C sac-A PG76-22 (344-7030)TON10,548$144.00$145.00$203.00
13Tack coat (344-7077)GAL5,753$3.75$4.00$4.00
14Flexible pavement structure repair(8") (351-7007)SY7,380$80.00$77.50$108.00
15Planing asphalt concrete pavement(0" to 2") (354-7032)SY6,094$10.00$6.85$2.30
16Riprap (mow strip)(4 in) (432-7013)CY973$530.00$700.00$479.00$530.00
17RC pipe (CL III)(18 in) (464-7003)LF100$200.00$167.00$120.00$195.00
18RC pipe (CL III)(24 in) (464-7005)LF64$200.00$170.00$174.00$300.00
19RC pipe (CL III)(30 in) (464-7007)LF102$350.00$180.00$174.00$311.00
20Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH18$1,400.00$1,450.00$1,360.00$1,450.00
21Set (type II) (21 in) (RCP) (6: 1) (P) (467-7320)EACH2$7,000.00$2,500.00$2,610.00$2,900.00
22Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH18$2,100.00$2,700.00$1,950.00$1,800.00
23Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH4$2,600.00$3,500.00$3,100.00$2,500.00
24Removing structure (pipe) (496-7037)EACH8$20.00$2,200.00$1,195.00$1,000.00
25Mobilization (500-7001)LS1$350,000$142,000$225,000$85,000
26Barricades, signs and traffic handling (502-7001)MO12$5,000.00$6,000.00$1,350.00$5,500.00
27Portable changeable message sign (503-7002)EACH2$10,000$18,590$65.00
28TMA (stationary) (505-7001)DAY120$300.00$350.00$350.00
29TMA (mobile operation) (505-7003)DAY50$200.00$626.00$520.00
30Biodegradable erosion control logs (install) (12") (506-7044)LF1,000$0.20$6.00$5.45$9.50
31Biodegradable erosion control logs (remove) (506-7046)LF1,000$0.20$2.00$1.10$4.60
32Driveways (base) (530-7015)SY774$25.00$41.00$37.00
33Intrsct, drvways, & turnout (ACP) (530-7022)SY2,552$26.00$44.00$31.00
34Mill rumble strips (asphalt) (shoulder) (533-7001)LF54,546$0.23$0.11$0.12
35Mill rumble strips (asphalt) (centerline) (533-7002)LF25,781$0.30$0.11$0.12
36Metal W-beam guard fence (timber post) (540-7001)LF22,175$28.00$28.00$22.85$28.00
37Downstream anchor terminal section (540-7015)EACH2$1,800.00$1,400.00$8,960.00$10,508
38Guardrail end treatment (install) (544-7001)EACH23$3,200.00$3,750.00$6,120.00$7,181.00
39Guardrail end treatment (remove) (544-7003)EACH6$357.00$300.00$2,700.00$3,130.00
40Mailbox install-S (TWW-post) type 4 (560-7008)EACH21$300.00$310.00$299.00$436.00
41Mailbox install-D (TWW-post) type 4 (560-7009)EACH5$250.00$330.00$299.00$436.00
42Mailbox install-M (TWW-post) type 4 (560-7010)EACH6$800.00$700.00$647.00$1,117.00
43Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH89$650.00$647.00$1,032.00
44Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$800.00$799.00$1,013.00
45Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH2$1,000.00$951.00$1,274.00
46Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035)EACH2$1,400.00$1,235.00$1,689.00
47Remove SM RD SN sup&AM (644-7073)EACH95$105.00$103.00$191.00
48Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH1,117$20.00$22.00$41.00$44.00
49Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF57,610$0.30$0.28$0.33
50Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF103$7.00$5.50$6.00
51Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH4$135.00$130.50$138.00
52Work zone pavement marking non-removing (W)(RR crossing) (662-7024)EACH2$300.00$278.00$290.00
53Work zone pavement marking non-removing(W)(word) (662-7030)EACH2$95.00$93.00$97.00
54Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH6$40.00$27.00$29.00
55Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF5,400$0.30$0.28$0.30
56Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF18,360$0.30$0.28$0.30
57Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH2,516$2.50$0.71$0.80
58Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF57,610$0.60$0.60$0.65
59Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF5,400$0.60$0.60$0.65
60Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF18,360$0.60$0.60$0.65
61Prefabricated PM type C (W)(24")(solid) (668-7089)LF103$22.00$21.75$23.00
62Prefabricated PM type C (W)(double arrow) (668-7093)EACH4$500.00$489.00$515.00
63Prefabricated PM type C (W)(word) (668-7103)EACH2$350.00$353.00$370.00
64Prefabricated PM type C (W)(RR crossing) (668-7108)EACH2$700.00$707.00$800.00
65Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH6$60.00$60.00$65.00
66Reflectorized pavement marker type II-A-A (672-7004)EACH527$6.50$6.50$7.00
67JT / CRCK seal (hot - poured rubber) (712-7002)LF252$20.00$13.00$30.00
TxDOT contract A00180186: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy