TxDOT contract A00132124 bid tabulation

Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475). Let by Texas DOT on October 7, 2026, Angelina, Lufkin District. 7 bids received; low bid $31,796,270 by Longview Bridge and Road, LTD., -9.5% against the engineer's estimate of $35,140,814.

Owner
Texas DOT
Letting
07 OCT 2026
Pay items
179
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Longview Bridge and Road, LTD.$31,796,270Low-10%
2Texas Materials Group, Inc.$33,279,215+5.0%-5.0%
3A. L. Helmcamp, Inc.$37,472,944+18%+7.0%
4R Construction Civil, LLC$39,358,349+24%+12%
5Posillico Civil, Inc.$40,757,181+28%+16%
6Ragle Construction, Inc.$46,841,741+47%+33%
7Durwood Greene Construction Co.$48,973,611+54%+39%
TxDOT contract A00132124: bids by rank

Engineer's estimate: $35,140,814.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Longview Bridge and Road, LTD.2. Texas Materials Group, Inc.3. A. L. Helmcamp, Inc.4. R Construction Civil, LLC5. Posillico Civil, Inc.6. Ragle Construction, Inc.
1Preparing row (100-7002)STA305.45$3,000.00$1,000.00$1,240.00$3,500.00$6,500.00$2,700.00$5,000.00
2Removing concrete (pavement) (104-7001)SY2,374$8.00$23.00$55.50$30.00$15.00$10.50$13.00
3Removing concrete (driveways) (104-7011)SY1,665$25.00$8.80$18.72$20.00$9.00$16.00$15.00
4Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001)SY596$9.00$7.75$10.00$25.00$7.50$9.50$6.00
5Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY22$30.00$41.00$42.00$210.00$7.50$12.00$45.00
6Remove (7"-13") TRT/untrt base & asphalt pavement (105-7058)SY3,788$10.00$3.90$6.98$20.00$7.50$10.00$14.00
7Remove (8"-19") TRT/untrt base & asphalt pavement (105-7119)SY5,862$11.50$5.00$6.98$25.00$12.00$20.00$17.00
8Excavation (roadway) (110-7001)CY18,824$10.00$7.00$10.38$15.00$23.00$8.50$32.00
9Embankment (final)(DC)(type C) (132-7006)CY32,049$10.00$10.00$26.70$28.00$24.00$16.50$25.00
10Backfill (type B) (134-7002)STA305.45$200.00$325.00$393.00$260.00$1,100.00$265.00$430.00
11Spec excavation work (hyd excavator) (158-7002)HR20$165.00$110.00$169.00$180.00$245.00$200.00$152.00
12Compost manuf topsoil (4") (161-7002)SY128,372$2.00$3.65$2.12$1.50$1.55$1.25$4.10
13Block sodding (162-7002)SY1,391$6.00$6.00$7.31$5.50$5.50$6.90$8.30
14Roll sodding (162-7008)SY11,368$5.00$5.80$6.29$5.50$4.50$5.20$7.50
15Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076)SY217,911$1.00$0.55$0.58$0.54$0.70$1.00$0.52
16Bond fiber MTRX seed (temporary)(warm) (164-7077)SY108,427$0.60$0.53$0.53$0.53$0.65$0.90$0.51
17Bond fiber MTRX seed (temporary)(cool) (164-7078)SY108,427$0.60$0.53$0.53$0.54$0.65$0.95$0.52
18Vegetative watering (168-7001)TGL8,929.20$10.00$10.50$0.01$3.00$35.00$17.00$51.00
19Cement (275-7001)TON655$230.00$240.00$234.00$245.00$220.00$290.00$350.00
20Cement TRT (subgrade)(12") (275-7015)SY42,275$6.00$2.00$3.76$4.70$6.30$4.00$4.60
21Prime coat (MC-30) (310-7004)GAL8,878$8.50$7.00$6.80$7.00$10.00$9.50$6.00
22Emuls asphalt (erosion control)(SS-1) (314-7008)GAL4,113$10.90$5.00$5.08$6.00$16.00$7.50$8.00
23Asphalt (AC-15P or CRS-2P) (316-7088)TON495$1,000.00$1,000.00$1,438.00$1,100.00$106.00$1,500.00$1,800.00
24Aggregate (type E or L, PE or PL GR 4) (316-7268)CY2,053$165.00$177.00$178.90$200.00$270.00$323.00$250.00
25SP mixes SP-B PG70-22 (344-7004)TON32,716$150.00$145.00$140.95$141.00$155.00$180.00$145.00
26SP mixes SP-C PG70-22 (344-7019)TON14,950$155.00$152.00$153.86$154.00$167.00$180.00$155.00
27SP mixes SP-C sac-A PG76-22 (344-7030)TON26,423$160.00$163.00$156.09$157.00$171.00$180.00$160.00
28SP mixes SP-C sac-B PG76-22 (exempt) (344-7039)TON405$155.00$197.00$242.00$243.00$258.00$190.00$250.00
29SP mixes SP-D sac-A PG70-22 (level-UP) (344-7054)TON3,377$155.00$155.00$173.49$180.00$185.00$180.00$250.00
30SP mixes SP-B PG70-22(level-UP) (344-7084)TON37,687$155.00$150.00$141.87$142.00$152.00$180.00$250.00
31Planing asphalt concrete pavement(0" to 2") (354-7032)SY17,600$2.50$4.20$5.30$5.50$5.50$6.00$21.00
32Cut & restoring pavement (400-7006)SY106$160.00$120.00$130.00$130.00$295.00$230.00$200.00
33Cem stabil BKFL (400-7010)CY853$215.00$280.00$273.00$290.00$170.00$145.00$132.00
34Trench excavation protection (402-7001)LF1,821$12.00$10.00$8.32$8.50$5.50$2.00$22.00
35Temporary special shoring (403-7001)SF8,126$40.00$20.00$35.10$38.00$33.00$50.00$22.00
36Drilled shaft (24 in) (416-7004)LF2,700$240.00$205.00$198.30$250.00$430.00$300.00$240.00
37Class B concrete (flume) (420-7010)CY14.20$850.00$1,050.00$832.00$1,500.00$2,165.00$590.00$830.00
38Class C concrete (abutment) (420-7012)CY116$1,300.00$1,465.00$1,015.00$2,000.00$1,115.00$2,015.00$1,210.00
39Class C concrete (cap) (420-7022)CY95.20$1,595.00$1,715.00$1,560.00$2,200.00$1,400.00$2,420.00$1,905.00
40Class C concrete (column) (420-7038)CY39.80$1,480.00$1,300.00$1,405.00$2,800.00$1,600.00$2,600.00$2,000.00
41Class C concrete (collar) (420-7061)EACH2$1,420.00$1,500.00$1,341.00$1,700.00$3,600.00$2,100.00$8,150.00
42Reinforced concrete slab (slab beam) (422-7007)SF30,000$25.00$20.00$19.24$24.00$27.00$21.00$15.50
43Approach slab (422-7013)CY314.40$750.00$830.00$780.00$750.00$961.00$990.00$591.00
44Prestressed concrete slab beam (4SB15) (425-7018)LF1,188$250.00$300.00$158.75$300.00$300.00$400.00$247.00
45Prestressed concrete slab beam (5SB15) (425-7019)LF4,752$260.00$280.00$250.50$300.00$295.00$362.00$260.00
46Concrete structure repair (vertical & overhead) (429-7007)SF15$200.00$165.00$145.00$150.00$270.00$400.00$250.00
47Riprap (concrete)(4 in) (432-7001)CY25$610.00$680.00$788.00$800.00$590.00$700.00$741.00
48Riprap (concrete)(5 in) (432-7002)CY2$650.00$1,875.00$672.00$700.00$680.00$645.00$711.00
49Riprap (concrete)(6 in) (432-7003)CY28$600.00$650.00$665.00$700.00$750.00$715.00$700.00
50Riprap (stone common)(dry)(24 in) (432-7034)CY781$200.00$195.00$181.70$185.00$228.00$290.00$260.00
51Riprap (stone protection)(24 in) (432-7045)CY3,010$180.00$185.00$161.25$152.00$166.00$290.00$270.00
52STR steel (miscellaneous non-bridge) (442-7007)LB656$10.00$41.00$26.00$45.00$27.00$20.00$36.00
53Miscellaneous non-bridge (nbis) (442-7017)LB5$120.00$500.00$52.00$60.00$230.00$20.00$132.00
54Rail (type C402) (450-7036)LF1,408$240.00$255.00$223.50$280.00$244.00$275.00$192.00
55Rail (handrail)(type E) (450-7062)LF926$130.00$152.00$195.50$200.00$153.00$190.00$118.00
56Armor joint (sealed) (454-7003)LF328$130.00$120.00$156.00$135.00$97.00$250.00$107.00
57Concrete box culvert (6 FT X 4 FT) (462-7012)LF1,380$700.00$480.00$599.90$600.00$600.00$285.00$511.00
58Concrete box culvert (6 FT X 6 FT)(extend) (462-7069)LF168$1,100.00$687.00$700.00$700.00$640.00$390.00$703.00
59Concrete box culvert (7 FT X 7 FT)(extend) (462-7074)LF93$1,200.00$840.00$830.00$850.00$800.00$1,050.00$927.00
60RC pipe (CL III)(18 in) (464-7003)LF465$59.00$57.00$72.80$75.00$80.00$65.00$98.00
61RC pipe (CL III)(24 in) (464-7005)LF826$91.00$65.00$99.00$100.00$110.00$75.00$92.00
62RC pipe (CL III)(48 in) (464-7011)LF8$225.00$260.00$296.00$300.00$272.00$520.00$400.00
63Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128)EACH6$8,950.00$4,600.00$7,300.00$7,500.00$3,175.00$6,300.00$6,800.00
64Inlet (complete)(PSL)(FG)(8FTX8FT-4FTX4FT) (465-7144)EACH1$22,000$22,600$18,200$20,000$12,105$18,300$19,500
65Wingwall (PW - 2) (HW=8 FT) (466-7192)EACH3$29,790$23,800$31,400$32,000$25,500$34,000$32,000
66Wingwall (SW - 0) (HW=5 FT) (466-7204)EACH1$17,200$15,700$16,650$17,000$8,400.00$18,500$50,000
67Wingwall (PW-1)(HW=9 FT)(mod) (466-7215)EACH1$50,000$49,900$47,900$48,000$68,250$40,000$150,000
68Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH1$1,407.00$2,000.00$1,050.00$1,100.00$2,600.00$1,025.00$2,200.00
69Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH24$1,200.00$950.00$985.00$1,000.00$2,600.00$1,025.00$2,200.00
70Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH34$1,600.00$1,270.00$1,455.00$1,500.00$2,715.00$1,250.00$2,500.00
71Clean existing culverts (480-7001)EACH1$3,500.00$6,100.00$3,450.00$3,500.00$900.00$4,800.00$5,000.00
72Removing structure (inlet) (496-7002)EACH6$1,018.00$1,450.00$833.00$850.00$800.00$390.00$1,000.00
73Removing structure (wingwall) (496-7005)EACH1$1,705.00$2,750.00$1,040.00$1,100.00$2,840.00$2,500.00$4,300.00
74Removing structure (pipe) (496-7007)LF840$18.00$26.00$31.20$32.00$37.00$20.00$21.00
75Removing structure (box culvert) (496-7008)LF530$80.00$50.00$60.35$61.00$102.00$50.00$84.00
76Removing structure (bridge 100 - 499 FT length) (496-7010)EACH2$128,000$70,000$78,000$140,000$82,000$52,500$500,000
77Remove STR (bollard) (496-7028)EACH34$100.00$65.00$150.00$150.00$235.00$85.00$600.00
78Removing structure (pipe) (496-7037)EACH25$415.00$870.00$210.00$320.00$670.00$45.00$353.00
79Removing structure (wood STR) (496-7042)LF82$52.00$50.00$25.00$90.00$58.00$35.00$121.00
80Mobilization (500-7001)LS1$2,700,000$2,000,000$2,485,000$3,700,000$3,850,000$3,500,000$4,800,000
81Barricades, signs and traffic handling (502-7001)MO62$5,000.00$2,200.00$2,500.00$13,730$7,740.00$4,300.00$42,000
82Portable changeable message sign (503-7002)EACH6$12,000$10,000$25,000$15,000$64.00$14,000$25,000
83TMA (stationary) (505-7001)DAY601$250.00$200.00$250.00$200.00$220.00$290.00$300.00
84TMA (mobile operation) (505-7003)DAY30$250.00$330.00$156.00$200.00$265.00$650.00$635.00
85Rock filter dams (install) (type 2) (506-7002)LF1,705$35.00$40.00$46.80$38.00$46.00$80.00$37.00
86Rock filter dams (remove) (506-7011)LF1,705$11.00$9.00$10.40$10.00$21.00$10.00$10.00
87Construction exits (install) (type 1) (506-7020)SY1,000$28.00$50.00$34.35$25.00$40.00$80.00$36.00
88Construction exits (remove) (506-7024)SY1,000$9.00$10.00$10.40$5.00$21.00$11.00$10.00
89Construction perimeter fence (506-7034)LF1,134$4.50$4.40$3.60$6.00$6.00$7.00$5.00
90Temporary sediment control fence (install) (506-7039)LF13,415$6.00$3.85$2.97$3.90$3.50$4.00$3.69
91Temporary sediment control fence (remove) (506-7041)LF13,415$2.00$0.77$1.04$0.40$1.00$1.00$0.40
92Biodegradable erosion control logs (install) (12") (506-7044)LF225$6.00$5.50$5.20$8.00$9.00$6.50$7.00
93Biodegradable erosion control logs (remove) (506-7046)LF225$1.30$1.10$1.05$1.10$2.00$1.50$1.00
94PTB (fur&inst)(SSCB or CSB)(type 1)or(steel) (512-7085)LF7,470$75.00$14.00$40.03$84.00$67.00$80.00$70.00
95PTB (move)(SSCB or CSB)(type 1)or(steel) (512-7086)LF19,040$10.00$3.00$18.91$24.00$5.25$5.00$10.00
96PTB (remove)(SSCB or CSB)(type 1)or(steel) (512-7088)LF7,470$13.50$4.50$32.26$34.00$7.00$12.00$28.00
97Driveways (concrete) (530-7006)SY1,441$170.00$140.00$161.00$160.00$93.00$100.00$105.00
98Driveways (ACP) (530-7010)SY3,471$53.00$47.00$63.49$65.00$80.00$63.00$91.00
99Mill rumble strips (asphalt) (shoulder) (533-7001)LF60,343$0.30$0.17$0.26$0.15$0.15$0.18$0.25
100Mill rumble strips (asphalt) (centerline) (533-7002)LF51,024$0.35$0.18$0.31$0.15$0.20$0.22$0.30
101Metal W-beam guard fence (timber post) (540-7001)LF1,450$34.00$27.00$27.04$25.00$24.00$25.58$23.00
102Metal beam guard fence trans (thrie-beam) (540-7005)EACH8$2,280.00$2,050.00$1,976.00$1,900.00$2,100.00$2,172.50$1,790.00
103Metal W - beam guard fence (low fill culvert) (540-7018)LF75$108.00$110.00$88.40$100.00$95.00$126.50$91.00
104Metal beam guard fence (long span system) (540-7027)EACH1$1,700.00$1,320.00$1,238.00$1,200.00$1,150.00$1,622.50$1,100.00
105Remove metal beam guard fence (542-7001)LF1,025$3.00$2.20$2.60$2.20$2.00$3.30$2.00
106Guardrail end treatment (install) (544-7001)EACH14$3,600.00$3,520.00$3,146.00$3,400.00$3,300.00$3,520.00$3,190.00
107Guardrail end treatment (remove) (544-7003)EACH9$275.00$220.00$260.00$220.00$205.00$275.00$200.00
108Crash cushion attenuator (move & reset) (545-7002)EACH18$1,650.00$2,200.00$1,560.00$1,200.00$1,800.00$2,000.00$1,500.00
109Crash cushion attenuator (remove) (545-7004)EACH6$625.00$880.00$936.00$1,100.00$1,000.00$2,000.00$1,500.00
110Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH6$10,150$9,185.00$8,800.00$10,000$8,500.00$12,500$15,000
111Gate (remove) (550-7016)EACH5$770.00$275.00$349.00$550.00$950.00$220.00$500.00
112Wire fence (type A) (552-7001)LF500$20.00$12.00$20.90$8.00$9.50$31.00$30.00
113Wire fence (water gap) (552-7010)LF150$90.00$31.00$43.20$22.00$12.50$88.00$60.00
114Wire fence (remove) (552-7011)LF7,443$8.00$2.20$2.79$3.00$5.00$5.50$6.00
115Mailbox install-S (TWG-post) type 2 (560-7002)EACH2$315.00$375.00$307.00$226.00$360.00$385.00$215.00
116Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH17$506.00$565.00$515.00$580.00$530.00$550.00$550.00
117Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058)EACH17$590.00$600.00$572.00$660.00$620.00$632.50$625.00
118Remove SM RD SN sup&AM (644-7073)EACH11$110.00$120.00$99.00$110.00$115.00$82.50$100.00
119Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH20$50.00$50.00$36.40$31.00$27.00$27.50$30.00
120Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH65$44.00$50.00$36.40$45.00$37.00$38.50$36.00
121Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH2$115.00$130.00$99.00$80.00$160.00$165.00$75.00
122Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF18,437$0.50$0.30$0.26$0.26$0.35$0.35$0.25
123Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF59,797$0.40$0.22$0.21$0.21$0.35$0.35$0.20
124Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF415$1.85$0.55$0.52$0.52$0.40$0.41$0.50
125Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH1$80.00$110.00$105.00$105.00$106.00$120.00$100.00
126Work zone pavement marking non-removing(W)(word) (662-7030)EACH1$100.00$110.00$105.00$105.00$106.00$120.00$100.00
127Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF15,270$0.35$0.30$0.26$0.26$0.35$0.35$0.25
128Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF61,090$0.37$0.22$0.21$0.21$0.35$0.35$0.20
129Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH2,697$5.50$4.20$3.90$4.00$5.00$5.60$3.75
130Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH5,650$4.50$4.20$3.90$4.00$5.00$5.60$3.75
131Work zone pavement marking removing (traffic BTN) type W (662-7057)EACH8,006$3.00$3.30$3.12$3.20$4.50$5.00$3.00
132Work zone pavement marking removing (traffic BTN) type Y (662-7059)EACH16,949$2.00$3.30$3.12$3.20$4.50$5.00$3.00
133Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH5,531$2.50$2.65$2.50$0.90$6.00$1.65$2.37
134Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH3,055$2.50$2.65$2.50$0.90$5.00$1.65$1.85
135Work zone pavement marking SHT terminal remove (W)(4") (662-7115)LF21,751$0.25$2.65$1.50$1.50$1.75$5.25$2.50
136Work zone pavement marking SHT terminal remove (Y)(4") (662-7116)LF20,617$1.00$2.65$1.50$1.50$1.75$5.25$2.50
137Reflectorized pavement marking type I (W)8"(solid)(125MIL) (666-7451)LF415$1.50$1.10$1.05$1.10$1.00$1.50$1.00
138Reflectorized profile pavement marking type I(W)6"(solid)(125MIL) (666-7501)LF760$1.00$5.50$5.20$5.20$4.00$5.85$5.00
139Reflectorized pavement marking type I (W)6"(broken)(125MIL) (666-7518)LF18,437$1.00$1.00$0.94$0.94$0.85$1.10$0.78
140Reflectorized pavement marking type I (W)6"(solid)(125MIL) (666-7519)LF59,797$0.75$0.90$0.83$0.83$0.75$0.95$0.73
141Reflectorized pavement marking type I (Y)6"(broken)(125MIL) (666-7522)LF15,274$0.75$1.00$0.94$0.94$0.85$1.20$0.78
142Reflectorized pavement marking type I (Y)6"(solid)(125MIL) (666-7523)LF61,090$0.75$0.90$0.83$0.83$0.75$1.10$0.73
143Prefabricated PM type C (W)(24")(solid) (668-7089)LF102$14.00$15.00$14.25$14.25$16.00$17.50$13.70
144Prefabricated PM type C (W)(arrow) (668-7091)EACH3$225.00$250.00$235.00$235.00$320.00$350.00$225.00
145Prefabricated PM type C (W)(word) (668-7103)EACH3$260.00$300.00$285.00$290.00$320.00$350.00$275.00
146Reflectorized pavement marker type I-C (672-7002)EACH759$6.00$5.50$5.20$5.20$5.00$5.57$5.00
147Reflectorized pavement marker type II-A-A (672-7004)EACH1,497$6.00$5.50$5.20$5.20$4.50$4.93$5.00
148Eliminating existing PM & markers (4") (677-7001)LF31,190$1.50$0.35$0.31$0.31$0.75$0.76$0.30
149Pavement surface preparation for marking (6") (678-7002)LF3,040$0.10$1.10$1.05$1.10$0.10$0.12$1.00
150CNC crack repair (discrete)(inject) (780-7002)LF40$80.00$165.00$70.00$75.00$200.00$110.00$100.00
151Bonding course (3007-7001)GAL19,394$6.00$5.00$5.50$5.60$6.00$9.00$6.40
152Water main pipe (PVC)(C900)(6 in) (7004-7004)LF118$69.00$66.00$62.50$65.00$33.00$34.00$63.00
153Water main pipe (PVC)(C900)(12 in) (7004-7007)LF795$146.00$77.00$73.00$75.00$60.00$67.00$66.00
154JCK tun bor aug casing (steel)(18 in) (7004-7018)LF30$1,440.00$330.00$312.00$320.00$665.00$600.00$370.00
155Cut and plug water main (12 in) (7004-7027)EACH1$4,855.00$1,650.00$1,550.00$1,600.00$2,320.00$1,070.00$2,075.00
156Fire hydrant assembly (7004-7030)EACH1$13,327$11,770$11,125$11,500$10,000$12,065$11,250
157Gate valve (12 in) (7004-7034)EACH1$6,895.00$7,700.00$7,250.00$7,400.00$5,600.00$6,400.00$4,575.00
158Gate valve & box (complete)(6 in) (7004-7039)EACH3$7,660.00$3,630.00$3,450.00$3,500.00$2,875.00$2,830.00$3,959.00
159Wet connection (4 in) (7004-7044)EACH1$3,065.00$4,200.00$3,950.00$4,000.00$6,810.00$7,900.00$7,050.00
160Wet connection (12 in) (7004-7047)EACH1$5,055.00$9,130.00$8,630.00$5,700.00$9,100.00$7,900.00$13,300
161Remove fire hydrant (7004-7058)EACH1$5,975.00$1,100.00$1,050.00$1,100.00$1,600.00$1,170.00$1,875.00
162Wet connection (6 in) (7004-7059)EACH3$3,065.00$4,950.00$4,700.00$4,800.00$7,850.00$10,000$8,300.00
163Gate valve & box(complete)(4 in) (7004-7068)EACH1$6,128.00$3,300.00$3,100.00$3,200.00$3,000.00$2,115.00$3,575.00
164Water main pipe (PVC)(C900)(4 in) (7004-7075)LF45$54.00$55.00$52.00$53.00$44.00$535.00$43.00
165Tee 12 in X 12 in X 6 in (7004-7076)EACH3$1,531.00$6,600.00$6,240.00$6,500.00$1,150.00$2,315.00$2,334.00
166Tee 12 in X 12 in X 4 in (7004-7077)EACH1$1,225.00$6,380.00$6,030.00$6,100.00$1,350.00$2,530.00$2,325.00
167Horizontal bend (6 in) (7004-7079)EACH1$3,063.00$550.00$520.00$530.00$500.00$1,635.00$1,513.00
168Horizontal bend (12 in) (7004-7080)EACH2$6,128.00$1,430.00$1,350.00$1,400.00$1,250.00$2,867.00$2,013.00
169Backflow preventer (double check)(4 in) (7004-7081)EACH1$5,361.00$22,550$21,300$22,000$15,000$11,720$27,500
170Backflow preventer (double check)(6 in) (7004-7082)EACH2$7,660.00$27,500$26,000$27,000$19,300$16,500$33,750
171WTR MN pipe C-900DR-18PVC(12")(DI bor) (7004-7083)LF30$1,440.00$132.00$125.00$130.00$132.00$100.00$270.00
172Bypass pumping (7006-7041)LS1$5,250.00$550.00$520.00$530.00$46,000$30,000$6,500.00
173Aband/fill existing san SWR pipe (3 in) (7006-7081)LF434$7.00$16.50$15.60$16.00$51.00$70.00$20.00
174Horizontal bend (3 in) (7006-7082)EACH3$76.00$550.00$520.00$530.00$520.00$1,810.00$625.00
175Sanitary sewer (PVC)(C900)(3 in) (7006-7083)LF431$100.00$55.00$52.00$53.00$25.00$335.00$42.00
176Remove and dispose existing water valve (7008-7117)EACH3$1,532.00$550.00$520.00$530.00$1,600.00$467.00$300.00
177Water meter and vault (7023-7021)EACH3$3,063.00$49,500$46,700$48,000$32,000$57,200$2,500.00
178Remove meter and box (7023-7022)EACH3$285.00$2,750.00$2,600.00$2,700.00$1,600.00$235.00$500.00
179Aband/fill existing water pipe (12") (7023-7034)LF791$54.00$22.00$20.95$22.00$54.00$26.00$30.00
TxDOT contract A00132124: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy